O'shea Co. Home Grown Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2013 to Aug 2026
- Last 24 months
- 27 permits filed
116 permits since 2000: 106 completed, 7 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
15 stairs permits: 12 completed, 3 in progress. Typically 14 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1635 Grove St | project is to replace front porch/deck and stair and add a canopy over the main entry. added square footage at porch and stair is 57 sq ft. space under porch/deck and stair is not habitable space but used for storage. project complies with planning setbacks.Details
project is to replace front porch/deck and stair and add a canopy over the main entry. added square footage at porch and stair is 57 sq ft. space under porch/deck and stair is not habitable space but used for storage. project complies with planning setbacks. | $40,000 |
| Jul 27, 2026 | In progress issued Aug 2026 | 1575 17th Av | revision to 202407237063: remove scope of work @ 2nd/f: new scope only include new interior stair, remove kitchen, add laundry rm, update proposed scope @ 1st/f to include in-fill south light well @ 1st/f only, update structural work @ 1st/f to lardwate w/ previously approved plan layoutDetails
revision to 202407237063: remove scope of work @ 2nd/f: new scope only include new interior stair, remove kitchen, add laundry rm, update proposed scope @ 1st/f to include in-fill south light well @ 1st/f only, update structural work @ 1st/f to lardwate w/ previously approved plan layout | |
| Sep 19, 2025 | Completed final sign-off May 2026 | 142 15th Av | revision to 202502059709. at rear 1st fl level patio, widen the stairs to rear yard, increase size of structural beam above. at 1st fl level remodel existing laundry rm and add refrigerator cabinet in media room, at rear yard add new deck which will be +19" above grade. add new sauna enclosure,Details
revision to 202502059709. at rear 1st fl level patio, widen the stairs to rear yard, increase size of structural beam above. at 1st fl level remodel existing laundry rm and add refrigerator cabinet in media room, at rear yard add new deck which will be +19" above grade. add new sauna enclosure, | $10,000 |
| Mar 28, 2025 | Completed final sign-off Apr 2025 | 127 12th Av | remove and replace dry rot in kind as necessary at side stairs less than 50% not visible from streetDetails
remove and replace dry rot in kind as necessary at side stairs less than 50% not visible from street | $2,508 |
| Feb 5, 2025 | Completed final sign-off May 2026 | 142 15th Av | provide a new rear yard deck with a spiral stair to access the rear yard. provide a new 1 hour rated wall b/t deck and south property line. new patio doors at 1/f and 2/f on the rear facade. remodel (e) 1/f bathroom, fixture locations to remain.Details
provide a new rear yard deck with a spiral stair to access the rear yard. provide a new 1 hour rated wall b/t deck and south property line. new patio doors at 1/f and 2/f on the rear facade. remodel (e) 1/f bathroom, fixture locations to remain. | $30,000 |
| Sep 10, 2024 | In progress issued Feb 2026 | 1575 17th Av | turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from living room and closing off front entry stairs to be interior.Details
turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from living room and closing off front entry stairs to be interior. | $150,000 |
| Jul 24, 2024 | Completed final sign-off Nov 2025 | 434 Hearst Av | new 2 story horizontal addition in the rear yard to provide an interior stair connecting 1st & 2nd fl levels. replace existing furnace with high efficiancy furnace unit.Details
new 2 story horizontal addition in the rear yard to provide an interior stair connecting 1st & 2nd fl levels. replace existing furnace with high efficiancy furnace unit. | $90,000 |
| May 21, 2024 | Completed final sign-off Apr 2025 | 15 Clairview Ct | revision to pa #2023-0710-1811 remove exterior stairs & chimney at east facade. provide exterior stairs at the east facade. remove the concrete painter box on the south facade from scope of workDetails
revision to pa #2023-0710-1811 remove exterior stairs & chimney at east facade. provide exterior stairs at the east facade. remove the concrete painter box on the south facade from scope of work | $10,000 |
| Sep 7, 2023 | Completed final sign-off Sep 2023 | 734 Ashbury St | repair front entry stairs. remove two treads and replace in kind. dry rot repairs less than 50%.Details
repair front entry stairs. remove two treads and replace in kind. dry rot repairs less than 50%. | $4,000 |
| Apr 3, 2023 | Completed final sign-off Sep 2023 | 3525 24th St | repair (e) rear stair and landing "in-kind"Details
repair (e) rear stair and landing "in-kind" | $52,300 |
| Dec 8, 2020 | Completed final sign-off Apr 2022 | 155 Stillings Av | improvements to an (e) 2 story residence. the (e) exterior entry stairs is in poor condition and is to be rebuilt. the (e) wall in front of stairs will be enlarged slightly. new windows and exterior facade material improvements. no interior improvements are anticipatedDetails
improvements to an (e) 2 story residence. the (e) exterior entry stairs is in poor condition and is to be rebuilt. the (e) wall in front of stairs will be enlarged slightly. new windows and exterior facade material improvements. no interior improvements are anticipated | $20,000 |
| Aug 18, 2020 | Completed final sign-off Apr 2021 | 2921 Octavia St | front deck dry rot(50 sqft) & rear deck dry rot(70 sqft) repair,<50%. remove tiles & substrate at perimeter of deck & stairs. replace tiles w/ tiles deck & woood at front steps. rear exterior windows (3) & doors (4) remove & replace with "milgard tuscany vinyl series". all work in kind.Details
front deck dry rot(50 sqft) & rear deck dry rot(70 sqft) repair,<50%. remove tiles & substrate at perimeter of deck & stairs. replace tiles w/ tiles deck & woood at front steps. rear exterior windows (3) & doors (4) remove & replace with "milgard tuscany vinyl series". all work in kind. | $40,000 |
| Jul 1, 2020 | Completed final sign-off Jan 2021 | 149 Leese St | rebuild in kind existing stairway (front). revision per approved pa# 201907297154. revised concrete topping to wood finish.Details
rebuild in kind existing stairway (front). revision per approved pa# 201907297154. revised concrete topping to wood finish. | |
| Jun 12, 2020 | Completed final sign-off Aug 2020 | 463 Eureka St | front exterior deck dry rot repair less than 50%. remove existing tile and substrate at perimeter of deck & stairs. repair dry rot proper waterproof and replace tile in kind.Details
front exterior deck dry rot repair less than 50%. remove existing tile and substrate at perimeter of deck & stairs. repair dry rot proper waterproof and replace tile in kind. | $10,000 |
| Jun 14, 2019 | Completed final sign-off Oct 2020 | 774 Athens St | convert 745 sq ft of garage/storage to mstbed suite, den & laundry. rebuild (e) interior stairs. relocate & replace furnace & water heater. replace door & window on west elevation. remove door at top of rebuilt stairs. add 2 solar tubes over stairs.Details
convert 745 sq ft of garage/storage to mstbed suite, den & laundry. rebuild (e) interior stairs. relocate & replace furnace & water heater. replace door & window on west elevation. remove door at top of rebuilt stairs. add 2 solar tubes over stairs. | $95,000 |