Hong Shink Construction
- Based in
- Millbrae
- On San Francisco permits
- Feb 2000 to Jun 2026
- Last 24 months
- 11 permits filed
156 permits since 2000: 140 completed, 3 in progress, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
25 stairs permits: 24 completed, 1 in progress. Typically 18 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2026 | In progress issued Aug 2026 | 1988 21st Av | remodel bldg layout by demo e) walls & provide n) structural support. add 2 bedrm & 2 baths to g/f. enclose e) stair area to const a n) interior staircase, install a n) skylight, replace e) ground fl windows w/ n) glazed sliding doors, rewire electrical system & install n) lighting & outletDetails
remodel bldg layout by demo e) walls & provide n) structural support. add 2 bedrm & 2 baths to g/f. enclose e) stair area to const a n) interior staircase, install a n) skylight, replace e) ground fl windows w/ n) glazed sliding doors, rewire electrical system & install n) lighting & outlet | $100,000 |
| Aug 6, 2025 | Completed final sign-off Jun 2026 | 1369 26th Av | legalize (e) 1/f unt per nov202293112 & 202293060.remove (e) stair btwn 1/f -2/f; relocate (e) unit entry;reconfig (e) kitchen;relocate (e) bath,provide 1h p|l & passageway to new adu & 1h sep to adj unit/garage/storage areas.provision f/s at unit and to entry under sep permit.Details
legalize (e) 1/f unt per nov202293112 & 202293060.remove (e) stair btwn 1/f -2/f; relocate (e) unit entry;reconfig (e) kitchen;relocate (e) bath,provide 1h p|l & passageway to new adu & 1h sep to adj unit/garage/storage areas.provision f/s at unit and to entry under sep permit. | $100,000 |
| Dec 31, 2024 | Completed final sign-off Mar 2026 | 64 Molimo Dr | 1/f: provide (n) media room, (n) bedroom, corridor & (n) laundry room. 2/f: remodel (e) kitchen and (e) bathroom & new bathroom. provide radiant floor heating, relocate (e) interior stair. new skylightsDetails
1/f: provide (n) media room, (n) bedroom, corridor & (n) laundry room. 2/f: remodel (e) kitchen and (e) bathroom & new bathroom. provide radiant floor heating, relocate (e) interior stair. new skylights | $189,000 |
| Oct 26, 2023 | Completed final sign-off May 2024 | 55 Cresta Vista Dr | rev to 202305318907, 2/f: relocate stairs, kitchen. 1/f: new bathroom, bedroom, media room and relocate laundry.Details
rev to 202305318907, 2/f: relocate stairs, kitchen. 1/f: new bathroom, bedroom, media room and relocate laundry. | $150,000 |
| Aug 4, 2023 | Completed final sign-off Mar 2024 | 153 Idora Av | 1/f: new bedrooms, media room, bar, bathroom, relocate staircase and mech. 2/f: remodel bathroom, relocate (n) kitchen, (n) bedroom and bathroom per plan. 2 new sliding door at rear, repair minor fire damage .Details
1/f: new bedrooms, media room, bar, bathroom, relocate staircase and mech. 2/f: remodel bathroom, relocate (n) kitchen, (n) bedroom and bathroom per plan. 2 new sliding door at rear, repair minor fire damage . | $300,000 |
| Dec 19, 2022 | Completed final sign-off Sep 2023 | 45 Springfield Dr | no excavation; at extg upper 1st floor, provide n family & half-bath.e at extg lower 2nd flr-remove e kitchen. at upper 2nd flr remodel e bath & new deck. reconstruct n interior stairs, relocate dormer & replace all windows. ***scope reduced in order to be reviewed otcDetails
no excavation; at extg upper 1st floor, provide n family & half-bath.e at extg lower 2nd flr-remove e kitchen. at upper 2nd flr remodel e bath & new deck. reconstruct n interior stairs, relocate dormer & replace all windows. ***scope reduced in order to be reviewed otc | $137,850 |
| Sep 14, 2022 | Completed final sign-off May 2023 | 580 Mississippi St | rev to pa 202112104170 shift large skylight to the west approx 2 structural updates: roof:sister (n) 2x10 to 6x10 due to new skylight location. second floor framings sister (n) lvl to 5.25 x 9 psl supporting the roof beams, (n) beams by the stairs due to removed of existing posts. first floor: (n) bDetails
rev to pa 202112104170 shift large skylight to the west approx 2 structural updates: roof:sister (n) 2x10 to 6x10 due to new skylight location. second floor framings sister (n) lvl to 5.25 x 9 psl supporting the roof beams, (n) beams by the stairs due to removed of existing posts. first floor: (n) b | |
| Jun 8, 2022 | Completed final sign-off Sep 2022 | 801 Moultrie St | ground floor: 2 new bedroom, 2 bathroom, new office, relocate laundry, extg internal stair, mech. 2nd floor: relocate bedroom, new bathroom, new half bathroom, new living and dinig. new windows at rear non street facing per plan.Details
ground floor: 2 new bedroom, 2 bathroom, new office, relocate laundry, extg internal stair, mech. 2nd floor: relocate bedroom, new bathroom, new half bathroom, new living and dinig. new windows at rear non street facing per plan. | $145,000 |
| Dec 10, 2021 | Completed final sign-off May 2023 | 580 Mississippi St | 1/f: renovation of existing bedroom and bathroom. repair rear yard deck in kind. 2/f: kitchen and bath renovation. enclose (e) interior lighwell. redesign of (e) interior stairDetails
1/f: renovation of existing bedroom and bathroom. repair rear yard deck in kind. 2/f: kitchen and bath renovation. enclose (e) interior lighwell. redesign of (e) interior stair | $200,000 |
| Oct 1, 2021 | Completed final sign-off Mar 2022 | 50 Juanita Wy | infill center patio and lightwell. 2nd fl: remodel kitchen, dinning, and reconfigure (e) bath, add (n) bath , new interior stairs. ground fl: construct 2 (n) bedrooms & bathrooms, add 1 media rm & wet bar. new deck @ rear less than 10 ft height. deck (7' x 18' wide). new rear openings, non visibleDetails
infill center patio and lightwell. 2nd fl: remodel kitchen, dinning, and reconfigure (e) bath, add (n) bath , new interior stairs. ground fl: construct 2 (n) bedrooms & bathrooms, add 1 media rm & wet bar. new deck @ rear less than 10 ft height. deck (7' x 18' wide). new rear openings, non visible | $148,000 |
| Jun 24, 2021 | Completed final sign-off Mar 2022 | 240 Santa Ana Av | 2/f: remodel/relocated (e) kitchen & bathroom, add new bedroom, dining and bathroom and removed wall withopen staircase. remodel (e) sace with new bathrooms and bedroom on 1/f.Details
2/f: remodel/relocated (e) kitchen & bathroom, add new bedroom, dining and bathroom and removed wall withopen staircase. remodel (e) sace with new bathrooms and bedroom on 1/f. | $150,000 |
| Oct 10, 2020 | Completed final sign-off Apr 2021 | 2691 22nd Av | 1st floor: construct 2 new bedrooms, media room, 2 new bathrooms and new interior stair. 2nd floor: construct new master bathroom, remodel (e) kitchen and bathroom, infill lightwell, replace front window.Details
1st floor: construct 2 new bedrooms, media room, 2 new bathrooms and new interior stair. 2nd floor: construct new master bathroom, remodel (e) kitchen and bathroom, infill lightwell, replace front window. | $90,000 |
| Jun 25, 2020 | Completed final sign-off May 2021 | 275 Santa Rosa Av | 1/f: excavate earth to 7'6" ceiling ht for new living space, including bedrooms, three new bathrooms, and laundry, at 2/f, remodel (e) bath and kitchen, new interior stair and infill light well. horiz and vertical addition.Details
1/f: excavate earth to 7'6" ceiling ht for new living space, including bedrooms, three new bathrooms, and laundry, at 2/f, remodel (e) bath and kitchen, new interior stair and infill light well. horiz and vertical addition. | $120,000 |
| Mar 5, 2018 | Completed final sign-off Aug 2018 | 2574 31st Av | comply with ces 201041499 and 200724921.new clay tile on front steps as appropriate for neighborhood - slate not approved. no other work under this permit. repair front sidewalk & driveway per 200562245,201476061,201470141. rebuild & relocate front stair within front property line.Details
comply with ces 201041499 and 200724921.new clay tile on front steps as appropriate for neighborhood - slate not approved. no other work under this permit. repair front sidewalk & driveway per 200562245,201476061,201470141. rebuild & relocate front stair within front property line. | $3,500 |
| Apr 11, 2017 | Completed final sign-off Apr 2017 | 700 Faxon Av | stucco repair at faxon side below windows to the side of stairs; replace two windows not visible from street.Details
stucco repair at faxon side below windows to the side of stairs; replace two windows not visible from street. | $4,200 |
| Mar 27, 2017 | Completed final sign-off Aug 2017 | 3032 Baker St | r/r 50% or less of (e) dryrot portions of (e) stair in-like in-kind.Details
r/r 50% or less of (e) dryrot portions of (e) stair in-like in-kind. | $9,000 |
| Jun 14, 2011 | Completed final sign-off Jun 2011 | 97 Lafayette St | install four garage ceiling drywall, back yard fence wall and check up, repair two fire stairs. add the air vent on roof exit door and self closing. his nov's 201124981 & 201141082 dated 4/29/11 & 6/3/11.Details
install four garage ceiling drywall, back yard fence wall and check up, repair two fire stairs. add the air vent on roof exit door and self closing. his nov's 201124981 & 201141082 dated 4/29/11 & 6/3/11. | $3,000 |
| Sep 16, 2009 | Completed final sign-off May 2010 | 34 Surrey St | change stair layout as shown on the plan. remove (e) master bedroom & bathroom as per plan @ 3rd. flr. revision to p.a.#2007/1015/5451.Details
change stair layout as shown on the plan. remove (e) master bedroom & bathroom as per plan @ 3rd. flr. revision to p.a.#2007/1015/5451. | |
| Jun 12, 2008 | Completed final sign-off Jun 2008 | 24 Coso Av | repair back yard stair dry rot. total work repair less than 50%.Details
repair back yard stair dry rot. total work repair less than 50%. | $1,700 |
| Apr 25, 2008 | Completed final sign-off May 2008 | 30 Coso Av | replace backyard stair dryrot bottom section of stair. total work repair less than 40%.Details
replace backyard stair dryrot bottom section of stair. total work repair less than 40%. | $1,800 |
| Apr 15, 2008 | Completed final sign-off Apr 2008 | 712 08th Av | replace 14 steps back yard stair dryrock & two stringer a section of stair. total work repair less than 40% replace in kind.Details
replace 14 steps back yard stair dryrock & two stringer a section of stair. total work repair less than 40% replace in kind. | $2,100 |
| Oct 10, 2007 | Completed final sign-off Nov 2007 | 2729 Bush St | replace rear stair with new wood stairs.Details
replace rear stair with new wood stairs. | $8,000 |
| Oct 17, 2006 | Completed final sign-off Feb 2007 | 528 Noriega St | remodel ofan existing single family dwelling, see palns, remodel existing kitchen & bath, replace existing windows & skyoight, w/vinyle windows per plans, repair/replace existing stucco in front, repair /replace stairs in kind as shown in plansDetails
remodel ofan existing single family dwelling, see palns, remodel existing kitchen & bath, replace existing windows & skyoight, w/vinyle windows per plans, repair/replace existing stucco in front, repair /replace stairs in kind as shown in plans | $25,000 |
| Aug 29, 2006 | Completed final sign-off Sep 2006 | 731 Duboce Av | rapir the side stairs dry rock. corner stucco. dry sheet wall less than 50% (p.t. wood) in kind, same location.Details
rapir the side stairs dry rock. corner stucco. dry sheet wall less than 50% (p.t. wood) in kind, same location. | $7,500 |
| Nov 15, 2005 | Completed final sign-off Feb 2006 | 318 25th Av | dryrot repair on bridge of lightwell. support 3 joist of bridge will be replaced in kind 3 risers/treads less than 50% of entire stairway. comply with 200563878Details
dryrot repair on bridge of lightwell. support 3 joist of bridge will be replaced in kind 3 risers/treads less than 50% of entire stairway. comply with 200563878 | $3,600 |