Wikiup Design& Const
- Based in
- Santa Rosa
- On San Francisco permits
- Nov 2010 to Aug 2026
- Last 24 months
- 2 permits filed
6 permits since 2000: 3 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 222 Hyde St | commerical area: removal and repair of moldy wall boards water damaged boards. repair of waste line plumbing, bring electrical up to code, install new tiles, fix 2 doors in kind, 1 interior and 1 back of bldg.Details
commerical area: removal and repair of moldy wall boards water damaged boards. repair of waste line plumbing, bring electrical up to code, install new tiles, fix 2 doors in kind, 1 interior and 1 back of bldg. | $40,000 |
| Oct 10, 2024 | In progress issued Oct 2024 | 3600 Baker St | change garage door (in -kind)Details
change garage door (in -kind) | $2,000 |
| Dec 29, 2021 | Completed final sign-off Jan 2022 | 932 Cabrillo St | all 6 units: 12sf wall repair in closet & paint. replace electrical subpanels in each unit to 70a from fuse to breakers.Details
all 6 units: 12sf wall repair in closet & paint. replace electrical subpanels in each unit to 70a from fuse to breakers. | $5,000 |
| Aug 4, 2020 | Never finaled issued Sep 2020, no final | 4079 24th St | comply w/ and complete all repairs per violations: #202038872, #202038473, #2202038901. work includes a bathroom remodel, general patch of walls, paint, new carpet, kitchen upgrades as necessary. 1 kitchen - 8'x10', 1 bathroom - 8'x10'.Details
comply w/ and complete all repairs per violations: #202038872, #202038473, #2202038901. work includes a bathroom remodel, general patch of walls, paint, new carpet, kitchen upgrades as necessary. 1 kitchen - 8'x10', 1 bathroom - 8'x10'. | $25,000 |
| Jun 18, 2020 | Completed final sign-off Mar 2021 | 464 Duboce Av | dry rot repair as needed approx. 300 sqft at east and west side of building, in kind. not visible from street. adding insulation.Details
dry rot repair as needed approx. 300 sqft at east and west side of building, in kind. not visible from street. adding insulation. | $50,000 |
| Nov 12, 2010 | Completed final sign-off Dec 2010 | 1218 06th Av | installation of new "cement-fiber siding over existing siding". not on the street side.Details
installation of new "cement-fiber siding over existing siding". not on the street side. | $12,600 |