Twin Pinnacles Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Nov 2025
- Last 24 months
- 5 permits filed
103 permits since 2000: 78 completed, 16 never finaled, 9 expired or cancelled.
Of the 16 never-finaled permits, 10 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 103.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2025 | Completed final sign-off Mar 2026 | 736 South Van Ness Av | to obtain final insepction for work approved under 202409130716. all work is completeDetails
to obtain final insepction for work approved under 202409130716. all work is complete | |
| Oct 22, 2025 | Completed final sign-off Apr 2026 | 70 Santa Monica Wy | 2 existing bathrooms remodeling in-kind, no structural work.Details
2 existing bathrooms remodeling in-kind, no structural work. | $60,000 |
| Sep 26, 2025 | Completed final sign-off Sep 2026 | 140 Broadmoor Dr | revision to pa #202505297511. revise bathroom at garage level: resize vanity, relocate linen closet, enlarge shower. revise stairs to storage area. extend excavation 3' to east and 5' to the north to increase size of storage area. center window at shower.Details
revision to pa #202505297511. revise bathroom at garage level: resize vanity, relocate linen closet, enlarge shower. revise stairs to storage area. extend excavation 3' to east and 5' to the north to increase size of storage area. center window at shower. | $10,000 |
| May 29, 2025 | Completed final sign-off Sep 2026 | 140 Broadmoor Dr | no expansion of below grade footing. new windows cannot be seen from street. remodel basement and (e) bathrooms @ garage level to include remodeled bathroom & new bedroom & mudroom. remodel (e) storage & crawl space to (n) storage w/ 8'high ceiling. excavation less than 32 cub yardDetails
no expansion of below grade footing. new windows cannot be seen from street. remodel basement and (e) bathrooms @ garage level to include remodeled bathroom & new bedroom & mudroom. remodel (e) storage & crawl space to (n) storage w/ 8'high ceiling. excavation less than 32 cub yard | $60,000 |
| Nov 4, 2024 | Completed final sign-off Jul 2025 | 150 San Leandro Wy | rev 202408198929-replace (2) wd windows at first floor. side bathroom awning window w/wood and (2) divided lines. rear kitchen window enlargement (9" increase ) to 65" w by 55 h w/wd and (6) divided lites. exterior trim to match (e) design and colorDetails
rev 202408198929-replace (2) wd windows at first floor. side bathroom awning window w/wood and (2) divided lines. rear kitchen window enlargement (9" increase ) to 65" w by 55 h w/wd and (6) divided lites. exterior trim to match (e) design and color | $9,000 |
| Aug 19, 2024 | Completed final sign-off Jul 2025 | 150 San Leandro Wy | renovation to single family residence. 1st fl - reconfigure kitchen fixtures. enlarge opening btwn itchen/dining rm; 2nd fl - new walk-in closet for primary bedrm. reconfigure (2) bathroom fixtures. remove closet wall for bedroom study;Details
renovation to single family residence. 1st fl - reconfigure kitchen fixtures. enlarge opening btwn itchen/dining rm; 2nd fl - new walk-in closet for primary bedrm. reconfigure (2) bathroom fixtures. remove closet wall for bedroom study; | $66,000 |
| Jul 24, 2024 | Completed final sign-off Jul 2025 | 150 San Leandro Wy | 1 kitchen & 3 bathrooms remodel. all in kind. no moving walls. all fixtures to remain in same location. kitchen approx. 144 sq ft. each bathrooom approx. 40 sq ft.Details
1 kitchen & 3 bathrooms remodel. all in kind. no moving walls. all fixtures to remain in same location. kitchen approx. 144 sq ft. each bathrooom approx. 40 sq ft. | $60,000 |
| Jul 15, 2024 | Completed final sign-off Oct 2024 | 150 Lombard St | unit #803: one bathroom remodelingDetails
unit #803: one bathroom remodeling | $17,000 |
| Jul 2, 2024 | Completed final sign-off Dec 2024 | 1880 Jackson St | two in kind bathroom remodelsDetails
two in kind bathroom remodels | $40,000 |
| Feb 8, 2024 | Completed final sign-off May 2024 | 3217 Market St | one bathroom remodeling in kind, non structuralDetails
one bathroom remodeling in kind, non structural | $15,000 |
| Dec 13, 2023 | Expired or cancelled cancelled Feb 2024 | 4630 18th St | bathroom remodeling- in kindDetails
bathroom remodeling- in kind | $15,000 |
| Jul 25, 2023 | Completed final sign-off Jun 2024 | 4529 18th St | rear bldg: remodel habitable workshop to include (n) secend kitchen & n 36"x36" shower @ (e) half bath. new wet bar, light & swich @ shower @ n 2nd kitchen (2 burner, stove 16"x18" sink, n gfi plugs & recess lights) provide 36" min clear width @ n counter. re build landing @ entry doorDetails
rear bldg: remodel habitable workshop to include (n) secend kitchen & n 36"x36" shower @ (e) half bath. new wet bar, light & swich @ shower @ n 2nd kitchen (2 burner, stove 16"x18" sink, n gfi plugs & recess lights) provide 36" min clear width @ n counter. re build landing @ entry door | $15,000 |
| Jun 9, 2023 | Completed final sign-off Oct 2023 | 300 Yerba Buena Av | replace (10) window alum. clad wood windows front side of the house all existing frame to remainDetails
replace (10) window alum. clad wood windows front side of the house all existing frame to remain | $23,000 |
| Mar 30, 2023 | Completed final sign-off Jul 2023 | 120 Ulloa St | one bathroom remodelDetails
one bathroom remodel | $15,000 |
| Mar 27, 2023 | Completed final sign-off Jan 2025 | 45 Santa Paula Av | revision to pa 2020-0115-1989 & 2022-1122-7033 provide option for shotcrete. new slab on grade at first floor entryDetails
revision to pa 2020-0115-1989 & 2022-1122-7033 provide option for shotcrete. new slab on grade at first floor entry | |
| Mar 6, 2023 | Completed final sign-off Aug 2023 | 82 Idora Av | replace front windows and back windows all windows will be at insert window replacement all (e) frame and jamb will remainDetails
replace front windows and back windows all windows will be at insert window replacement all (e) frame and jamb will remain | $12,000 |
| Nov 30, 2022 | Expired or cancelled withdrawn Mar 2023 | 45 Santa Paula Av | revision to pa#202001151989. address requirement for shoring permit. review and approval of cuts by soils engineer.Details
revision to pa#202001151989. address requirement for shoring permit. review and approval of cuts by soils engineer. | |
| Aug 25, 2022 | Completed final sign-off Mar 2023 | 964 Kansas St | rev to pa 202206095990: install partiail butrress permiter fdn adjacent to new spiral.Details
rev to pa 202206095990: install partiail butrress permiter fdn adjacent to new spiral. | $4,000 |
| Aug 12, 2022 | Completed final sign-off Aug 2022 | 25 Milton St | remove 2 door and install a pocket door. infill one door opening at second flr.Details
remove 2 door and install a pocket door. infill one door opening at second flr. | $1,500 |
| Jun 21, 2022 | Completed final sign-off Aug 2023 | 82 Idora Av | kitchen remodel. replace kitchen cabinets, counter, electrical, plumbing work.Details
kitchen remodel. replace kitchen cabinets, counter, electrical, plumbing work. | $35,000 |
| Jun 9, 2022 | Completed final sign-off Mar 2023 | 964 Kansas St | new interior spiral stair to 1st fl.Details
new interior spiral stair to 1st fl. | $6,000 |
| May 19, 2022 | Completed final sign-off Aug 2023 | 82 Idora Av | add deck on the 1st floor(street level)& stair down to the rear yard.addition of an office on basement level & new patio in the rear yard. no alteration on the front facade.Details
add deck on the 1st floor(street level)& stair down to the rear yard.addition of an office on basement level & new patio in the rear yard. no alteration on the front facade. | $60,000 |
| May 19, 2022 | Completed final sign-off May 2024 | 62 Ulloa St | ground fl: add bath. convert 342 sf of (e) unconditioned space to living areas. remove ground fl bath. new door and window at side (not visible from st). replace window @ rear. replace furnace. replace a tank water heater to a tankless gas water heater.Details
ground fl: add bath. convert 342 sf of (e) unconditioned space to living areas. remove ground fl bath. new door and window at side (not visible from st). replace window @ rear. replace furnace. replace a tank water heater to a tankless gas water heater. | $81,000 |
| May 2, 2022 | Completed final sign-off Aug 2023 | 82 Idora Av | 2/f: interior remodel for the interior stair to connect the 1/f (street level) for a new laundry room, mudroom, a half bath, a primary bedroom, suite, and a sunroom. basement level: partially excavate approx. 18" for a new bathroom and storage closet.Details
2/f: interior remodel for the interior stair to connect the 1/f (street level) for a new laundry room, mudroom, a half bath, a primary bedroom, suite, and a sunroom. basement level: partially excavate approx. 18" for a new bathroom and storage closet. | $250,000 |
| Jan 10, 2022 | Completed final sign-off Aug 2022 | 254 Monticello St | remove bearing wall at second floor & install new post and beam with footingDetails
remove bearing wall at second floor & install new post and beam with footing | $10,000 |
| Dec 27, 2021 | Completed final sign-off Aug 2022 | 25 Milton St | kitchen and bath remodelDetails
kitchen and bath remodel | $60,000 |
| Dec 22, 2021 | Completed final sign-off Aug 2023 | 82 Idora Av | install new c channels @ (e) wood ceiling beam @ ground/1st fl. add 3'x5'skylight to kitchen ceiling @ 2nd fl,demo partition walls @ closets & mechanical chase.install new pantry cabinets to match existing.Details
install new c channels @ (e) wood ceiling beam @ ground/1st fl. add 3'x5'skylight to kitchen ceiling @ 2nd fl,demo partition walls @ closets & mechanical chase.install new pantry cabinets to match existing. | $15,000 |
| Nov 12, 2021 | Completed final sign-off Dec 2022 | 120 Ulloa St | modify app #20210805898 to change foundation detail and to add new office.Details
modify app #20210805898 to change foundation detail and to add new office. | $15,000 |
| Sep 21, 2021 | Completed final sign-off Aug 2022 | 254 Monticello St | kitchen replacement in-kind, plumbing and electrical. lights per cenc 150.0(k)Details
kitchen replacement in-kind, plumbing and electrical. lights per cenc 150.0(k) | $50,000 |
| Aug 5, 2021 | Completed final sign-off Dec 2022 | 120 Ulloa St | construction of playroom at ground floor.Details
construction of playroom at ground floor. | $45,000 |
| Jul 2, 2021 | Completed final sign-off Nov 2021 | 240 Yerba Buena Av | bathroom remodel. no layout changes, no wall stud framing demolition.Details
bathroom remodel. no layout changes, no wall stud framing demolition. | $25,000 |
| Jun 25, 2021 | Completed final sign-off Sep 2021 | 568 Peralta Av | deck work less than 50%. repair dryrot floor (of the deck).Details
deck work less than 50%. repair dryrot floor (of the deck). | $8,000 |
| Jun 25, 2021 | Completed final sign-off Feb 2022 | 150 Lombard St | apt 803: remodel 1 kitchen. no structural work. no layout changes or wall modification. maher n/a.Details
apt 803: remodel 1 kitchen. no structural work. no layout changes or wall modification. maher n/a. | $48,000 |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 523 Teresita Bl | fixture/finish update in all bathroom. move extg skylight. infill lightwell and install shower. new hall and move furnace and water heater.Details
fixture/finish update in all bathroom. move extg skylight. infill lightwell and install shower. new hall and move furnace and water heater. | $30,000 |
| May 13, 2021 | Never finaled issued May 2021, no final | 780 Kansas St | repair dryrot deck (rear). less than 50%Details
repair dryrot deck (rear). less than 50% | $8,000 |
| Apr 23, 2021 | Completed final sign-off Feb 2022 | 159 Monticello St | replace front stucco finish to match (e) approx 700 sf facing street. replace 2 aluminum windows to match(aluminum clad-wood window). no rough opening changes. u-factor fro new windows nto to exceed 0.30Details
replace front stucco finish to match (e) approx 700 sf facing street. replace 2 aluminum windows to match(aluminum clad-wood window). no rough opening changes. u-factor fro new windows nto to exceed 0.30 | $18,000 |
| Apr 21, 2021 | Completed final sign-off Apr 2021 | 96 Brentwood Av | to obtain final inspection for work approved under permit application: 201901029489, 201901291552, and 201910013208. all work is completed.Details
to obtain final inspection for work approved under permit application: 201901029489, 201901291552, and 201910013208. all work is completed. | $55,000 |
| Apr 14, 2021 | Never finaled issued Apr 2021, no final | 523 Teresita Bl | kitchen and bathroom remodeling. plumbing and electrical. not structural work.Details
kitchen and bathroom remodeling. plumbing and electrical. not structural work. | $55,000 |
| Jan 6, 2021 | Never finaled issued Jan 2021, no final | 523 Teresita Bl | replace front stucco ~700 sqft. install new bolt to existing foundations, 5/8" all thread epoxy bolt 8" extended at 30" oc at existing foundation around the house, total 35 bolts. no structural work. window will be wood aluminum clad to match google 2019 photoDetails
replace front stucco ~700 sqft. install new bolt to existing foundations, 5/8" all thread epoxy bolt 8" extended at 30" oc at existing foundation around the house, total 35 bolts. no structural work. window will be wood aluminum clad to match google 2019 photo | $20,000 |
| Nov 23, 2020 | Completed final sign-off Apr 2021 | 75 Rockwood Ct | to comply with complaint 202065891 bathroom remodelDetails
to comply with complaint 202065891 bathroom remodel | $15,000 |
| Oct 17, 2020 | Completed final sign-off Aug 2021 | 167 Maywood Dr | all work on garage level. relocate (e) bathroom. cover garage office to bedroom, add hall / laundry area. add a home office w/ full bathroom.Details
all work on garage level. relocate (e) bathroom. cover garage office to bedroom, add hall / laundry area. add a home office w/ full bathroom. | $45,000 |
| Jun 12, 2020 | Never finaled issued Jun 2020, no final | 167 Maywood Dr | three bathrooms remodel. tile work, 2 showers and one bathtub. all in kind.Details
three bathrooms remodel. tile work, 2 showers and one bathtub. all in kind. | $40,000 |
| Mar 5, 2020 | Completed final sign-off Feb 2021 | 40 Ravenwood Dr | deck stair repair, less than 50% repair. to comply with complaint 202021525.Details
deck stair repair, less than 50% repair. to comply with complaint 202021525. | $15,000 |
| Jan 29, 2020 | Completed final sign-off Jun 2020 | 159 Monticello St | kitchen remodel. replace cabinet, counter, sink, etc. electrical & plumbing work.Details
kitchen remodel. replace cabinet, counter, sink, etc. electrical & plumbing work. | $35,000 |
| Jan 15, 2020 | Completed final sign-off Jan 2025 | 45 Santa Paula Av | horizontal and vertical addition. (n) 2nd flr including (2) bedrooms. rear addition @ 1st flr.Details
horizontal and vertical addition. (n) 2nd flr including (2) bedrooms. rear addition @ 1st flr. | $90,000 |
| Dec 13, 2019 | Completed final sign-off Jun 2020 | 283 Dorland St | two bathrooms remodel. approx 5'x10', 5x8'. same locationDetails
two bathrooms remodel. approx 5'x10', 5x8'. same location | $30,000 |
| Oct 1, 2019 | Never finaled issued Oct 2019, no final | 96 Brentwood Av | remove non-historic aluminum siding over stucco. replace stucco as needed and leave exposed, to have mostly smooth finish. per age of consturction (1929) and overall neighborhood context, stucco is the appropriate siding material for subject property.Details
remove non-historic aluminum siding over stucco. replace stucco as needed and leave exposed, to have mostly smooth finish. per age of consturction (1929) and overall neighborhood context, stucco is the appropriate siding material for subject property. | $15,000 |
| Jul 10, 2019 | Completed final sign-off Dec 2019 | 344 Liberty St | repair (e) retaining wall at rear of propertyDetails
repair (e) retaining wall at rear of property | $5,000 |
| May 6, 2019 | Expired or cancelled expired Mar 2026 | 96 Brentwood Av | foundation repair. response to n.o.v 201929381 dated 2/14/2019Details
foundation repair. response to n.o.v 201929381 dated 2/14/2019 | $10,000 |
| Mar 25, 2019 | Never finaled issued Mar 2019, no final | 333 Missouri St | one bathroom remodel in-kind.Details
one bathroom remodel in-kind. | $25,000 |
| Feb 19, 2019 | Completed final sign-off Dec 2019 | 1699 Vallejo St | kitchen remodeling 18x12 feet approxDetails
kitchen remodeling 18x12 feet approx | $35,000 |
| Jan 29, 2019 | Expired or cancelled expired Apr 2021 | 96 Brentwood Av | secondary stair rehabilitation - interior. bathroom remodel at 1st fl. new dumbwaiter and lobby at garage. revise bathroom remodel at 2nd fl - refer to pa #201901029489.Details
secondary stair rehabilitation - interior. bathroom remodel at 1st fl. new dumbwaiter and lobby at garage. revise bathroom remodel at 2nd fl - refer to pa #201901029489. | $96,000 |
| Jan 2, 2019 | Completed final sign-off Apr 2021 | 96 Brentwood Av | kitchen remodel. bathroom remodel. no change on walls.Details
kitchen remodel. bathroom remodel. no change on walls. | $40,000 |
| Sep 13, 2018 | Completed final sign-off Feb 2021 | 40 Ravenwood Dr | structural revision to pa #201803294964. expand existing foundation to be replaced.Details
structural revision to pa #201803294964. expand existing foundation to be replaced. | $5,000 |
| Jun 13, 2018 | Completed final sign-off Sep 2018 | 546 Bright St | kitchen remodel: replace kitchen cabinets, coutner, sink, fauced, led lightsDetails
kitchen remodel: replace kitchen cabinets, coutner, sink, fauced, led lights | $29,000 |
| May 24, 2018 | Completed final sign-off Nov 2019 | 788 Carolina St | repair and replace 2 balconies at front as needed due to dryrot. to include sistering joists, retaining orig criss cross handrail design and retain redwood decking. add 42" glass panels to front of balconies to meet safety code of handrails. retain greater than 50% of original balconiesDetails
repair and replace 2 balconies at front as needed due to dryrot. to include sistering joists, retaining orig criss cross handrail design and retain redwood decking. add 42" glass panels to front of balconies to meet safety code of handrails. retain greater than 50% of original balconies | $4,000 |
| Mar 29, 2018 | Completed final sign-off Feb 2021 | 40 Ravenwood Dr | develop habitable space at (e) basement & first flr & fill in at rear yard. add family room, bedroom, bath, laudnry and officeDetails
develop habitable space at (e) basement & first flr & fill in at rear yard. add family room, bedroom, bath, laudnry and office | $120,000 |
| Mar 28, 2018 | Completed final sign-off Nov 2019 | 788 Carolina St | replace (2) existing single pane aluminum frame windows and (2) doors at the front façade with new wood interior aluminum clad windows within existing openings.Details
replace (2) existing single pane aluminum frame windows and (2) doors at the front façade with new wood interior aluminum clad windows within existing openings. | $2,500 |
| Mar 26, 2018 | Never finaled issued Mar 2018, no final | 96 Brentwood Av | bathroom remodeling. no alteration of wall, window and door.Details
bathroom remodeling. no alteration of wall, window and door. | $25,000 |
| Feb 28, 2018 | Completed final sign-off Feb 2021 | 224 Santa Paula Av | voluntary structrual stregthening, repair sub standard framing & dry-rot, interior remodel including kitchen & bathrooms, limited exterior work: replace windows in kind at front, new windows & doors at rear & sidesDetails
voluntary structrual stregthening, repair sub standard framing & dry-rot, interior remodel including kitchen & bathrooms, limited exterior work: replace windows in kind at front, new windows & doors at rear & sides | $550,000 |
| Nov 2, 2017 | Completed final sign-off Nov 2019 | 788 Carolina St | revision to 201708235618 structural changes only. replacement of foundation at the rear on west and south side of building.Details
revision to 201708235618 structural changes only. replacement of foundation at the rear on west and south side of building. | $10,000 |
| Sep 26, 2017 | Expired or cancelled cancelled May 2026 | 567 Mississippi St | unit#567. kitchen & bathroom remodel in same location. no moving of walls, doors or windows.Details
unit#567. kitchen & bathroom remodel in same location. no moving of walls, doors or windows. | $38,000 |
| Sep 19, 2017 | Never finaled issued Oct 2017, no final | 567 Mississippi St | repair foundation per plans. relocate furnace on 1/f into the garage. remodel (e) kitchen & (e) bathroom on 2/f. add lighting and outlet on (e) bedroom and living room within the scope of work area per plans.Details
repair foundation per plans. relocate furnace on 1/f into the garage. remodel (e) kitchen & (e) bathroom on 2/f. add lighting and outlet on (e) bedroom and living room within the scope of work area per plans. | $80,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2018 | 1880 Jackson St | unit #301: kitchen remodeling, replace kitchen cabinets, counter, etcDetails
unit #301: kitchen remodeling, replace kitchen cabinets, counter, etc | $20,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2017 | 66 Waller St | bathroom remodel.Details
bathroom remodel. | $18,000 |
| Aug 23, 2017 | Completed final sign-off Nov 2019 | 788 Carolina St | garage fl: install moment frame and relocate furnace/water heater. 1st fl - new bedroom & bathroom and skylight, 2 new bedroom. 2nd fl - relocate kitchen from 2nd floor. roof - 4 new solar tubes at roofDetails
garage fl: install moment frame and relocate furnace/water heater. 1st fl - new bedroom & bathroom and skylight, 2 new bedroom. 2nd fl - relocate kitchen from 2nd floor. roof - 4 new solar tubes at roof | $150,000 |
| Aug 9, 2017 | Completed final sign-off Nov 2017 | 905 Portola Dr | revise permit #2016-0325-3102. change scope of work from add 1 full bathroom to add 2 full bathrooms.Details
revise permit #2016-0325-3102. change scope of work from add 1 full bathroom to add 2 full bathrooms. | |
| Aug 7, 2017 | Completed final sign-off Oct 2017 | 547 Texas St | siding work back of house, pain on side, remove/replace siding due to dryrot, install new insulation, repair (e) deck due to dryrot - less than 50% replacementDetails
siding work back of house, pain on side, remove/replace siding due to dryrot, install new insulation, repair (e) deck due to dryrot - less than 50% replacement | $28,000 |
| May 19, 2017 | Completed final sign-off Aug 2017 | 50 Rockwood Ct | revision to 201703131294, 2 kitchen windows replaced, 1 window addedDetails
revision to 201703131294, 2 kitchen windows replaced, 1 window added | $10,000 |
| Apr 3, 2017 | Completed final sign-off Jun 2017 | 375 Park St | kitchen remodeling, remove and install new cabinet, counter, new led light, new kitchen sink, in same location.Details
kitchen remodeling, remove and install new cabinet, counter, new led light, new kitchen sink, in same location. | $25,000 |
| Mar 13, 2017 | Completed final sign-off Aug 2017 | 50 Rockwood Ct | kitchen remodel. no envelope changes. new cabinets, replace sink, lighting, appliances, new electrical, remove extg non-load bearing partition wall.Details
kitchen remodel. no envelope changes. new cabinets, replace sink, lighting, appliances, new electrical, remove extg non-load bearing partition wall. | $38,500 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 736 South Van Ness Av | street spaceDetails
street space | |
| Jan 24, 2017 | Completed final sign-off Mar 2017 | 930 Montgomery St | tenant improvement 2nd fl partition wall, electrical work. install power operated push plates at main entrance door and second floor bathroom door.Details
tenant improvement 2nd fl partition wall, electrical work. install power operated push plates at main entrance door and second floor bathroom door. | $60,000 |
| Sep 20, 2016 | Completed final sign-off Aug 2018 | 736 South Van Ness Av | (n) 2nd flr addition of 1 bathroom + 2 bedrooms, also remodel of (e) 1st flr family + remodel (e) bathDetails
(n) 2nd flr addition of 1 bathroom + 2 bedrooms, also remodel of (e) 1st flr family + remodel (e) bath | $200,000 |
| Jul 20, 2016 | Completed final sign-off Dec 2016 | 1856 Powell St | kitchen remodeling, remove & install new cabinet counter, install new led light, install new kitchen sink, (e) fan to remain work in unit 401 only section 714Details
kitchen remodeling, remove & install new cabinet counter, install new led light, install new kitchen sink, (e) fan to remain work in unit 401 only section 714 | $25,000 |
| Apr 15, 2016 | Completed final sign-off Jul 2019 | 538 Mississippi St | add 1-story rear addition under (e) porch for 2nd unit. add stair and convert (e) attic to bedroom/bath with balcony.Details
add 1-story rear addition under (e) porch for 2nd unit. add stair and convert (e) attic to bedroom/bath with balcony. | $320,000 |
| Mar 25, 2016 | Completed final sign-off Aug 2017 | 905 Portola Dr | basement remodel - add 1 bedroom, 1 full bathroom, 1 family room and art room. excavation & wood frame windows.Details
basement remodel - add 1 bedroom, 1 full bathroom, 1 family room and art room. excavation & wood frame windows. | $62,000 |
| Mar 2, 2016 | Completed final sign-off Feb 2017 | 340 Missouri St | kitchen remodel. remove and install new cabinets and counter. install new led lights, and new kitchen sink.Details
kitchen remodel. remove and install new cabinets and counter. install new led lights, and new kitchen sink. | $25,000 |
| Mar 2, 2016 | Never finaled issued Mar 2016, no final | 905 Portola Dr | removing exterior stucco due to bad condition and install new stucco at front, sides and back. in-kind textured stucco. no structural work.Details
removing exterior stucco due to bad condition and install new stucco at front, sides and back. in-kind textured stucco. no structural work. | $15,000 |
| Jan 22, 2016 | Completed final sign-off Dec 2016 | 340 Missouri St | bearing wall removal & replacement w/new structure beamsDetails
bearing wall removal & replacement w/new structure beams | $3,000 |
| Nov 30, 2015 | Never finaled issued Nov 2015, no final | 339 Missouri St | remodeling bathroom. replace bathtub, replace tile & faucet. install 4 led light. replace exaust fan.Details
remodeling bathroom. replace bathtub, replace tile & faucet. install 4 led light. replace exaust fan. | $15,000 |
| Jul 29, 2015 | Completed final sign-off Dec 2015 | 17 Jersey St | garage repair of extg floor framing above with new rear retaining wall, new pressure treated floor joists and new steel system to support extg walls above.Details
garage repair of extg floor framing above with new rear retaining wall, new pressure treated floor joists and new steel system to support extg walls above. | $20,000 |
| Mar 10, 2015 | Completed final sign-off May 2016 | 630 Vermont St | revisions to e(e) pa# 2015 0120 6071 window ar rear is being enlarged & vinyl windows at front are being replaced w/all clad windowsDetails
revisions to e(e) pa# 2015 0120 6071 window ar rear is being enlarged & vinyl windows at front are being replaced w/all clad windows | $1,000 |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 133 Hancock St | existing bathroom one bathroom remodeling work. replacing tile, toilet, vanity. new ceiling light, new outlet. no structural work.Details
existing bathroom one bathroom remodeling work. replacing tile, toilet, vanity. new ceiling light, new outlet. no structural work. | $7,000 |
| Jan 20, 2015 | Completed final sign-off May 2016 | 630 Vermont St | interior renovation to both units, remodeled kitchens, additional bathroom & new stair, enlarge windows at rear & lot infill at lightwell.Details
interior renovation to both units, remodeled kitchens, additional bathroom & new stair, enlarge windows at rear & lot infill at lightwell. | $90,000 |
| Dec 2, 2014 | Completed final sign-off Jun 2015 | 133 Hancock St | kitchen remodel and new water closet to be created.Details
kitchen remodel and new water closet to be created. | $30,000 |
| Nov 6, 2014 | Completed final sign-off Jul 2015 | 322 Missouri St | remodel kitchen, replace cabinets, counter top, add outlets & new ceiling lights. no walls moved, removed or added. all layouts remain unchanged.Details
remodel kitchen, replace cabinets, counter top, add outlets & new ceiling lights. no walls moved, removed or added. all layouts remain unchanged. | $20,000 |
| Sep 2, 2014 | Never finaled issued Sep 2014, no final | 555 Dolores St | kitchen remodeling, replacing kitchen cabinets, counter top, install new drywall & insulation, install new ceiling lights, install new floor, tile or hardwood floor, install new kitchen sink & faucetDetails
kitchen remodeling, replacing kitchen cabinets, counter top, install new drywall & insulation, install new ceiling lights, install new floor, tile or hardwood floor, install new kitchen sink & faucet | $14,000 |
| Aug 19, 2014 | Completed final sign-off Dec 2014 | 81 San Jacinto Wy | two bathroom work: replacing tiling, toilet, vanity, new ceiling lights, new outlets.Details
two bathroom work: replacing tiling, toilet, vanity, new ceiling lights, new outlets. | $8,000 |
| Jun 2, 2014 | Expired or cancelled expired Mar 2026 | 320 Missouri St | revision to appl #2013.1030.0662 - new interior staircase from 2nd floor to 1st floor. replac eapprox 20' of (e) foundation.Details
revision to appl #2013.1030.0662 - new interior staircase from 2nd floor to 1st floor. replac eapprox 20' of (e) foundation. | $25,000 |
| Apr 2, 2014 | Completed final sign-off Nov 2014 | 341 Connecticut St | replacing kitchen cabinet, counter top, add outlets, new lights to kitchen & dining room new lights, replace (e) windows (4). not visible from street.Details
replacing kitchen cabinet, counter top, add outlets, new lights to kitchen & dining room new lights, replace (e) windows (4). not visible from street. | $14,000 |
| Mar 12, 2014 | Never finaled issued Mar 2014, no final | 71 South Hill Bl | bathroom work: replacing tiling, toilet, vanity, new ceiling lights, new outlets, front stair entrance: replacing tile, no structural work, plumbing, electrical under separate permitsDetails
bathroom work: replacing tiling, toilet, vanity, new ceiling lights, new outlets, front stair entrance: replacing tile, no structural work, plumbing, electrical under separate permits | $4,800 |
| Dec 4, 2013 | Completed final sign-off Mar 2014 | 333 Missouri St | kitchen remodeling: replacing kitchen cabinets, counter top and outlets, new ceiling light, replace sink and faucets.Details
kitchen remodeling: replacing kitchen cabinets, counter top and outlets, new ceiling light, replace sink and faucets. | $11,000 |
| Nov 26, 2013 | Expired or cancelled expired Mar 2026 | 320 Missouri St | bedroom work downstairs, replacing tiling, toilet, vanity, new ceiling lights, new outlets.Details
bedroom work downstairs, replacing tiling, toilet, vanity, new ceiling lights, new outlets. | $3,800 |
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 322 Missouri St | replacing kitchen cabinet, counter top, add outlets and new ceiling lightsDetails
replacing kitchen cabinet, counter top, add outlets and new ceiling lights | $11,000 |
| Oct 30, 2013 | Expired or cancelled expired Mar 2026 | 320 Missouri St | foundation replacement, lower slay by 15" max. in-fill under (e) 2nd floor rear overhangDetails
foundation replacement, lower slay by 15" max. in-fill under (e) 2nd floor rear overhang | $50,000 |
| Oct 15, 2013 | Expired or cancelled expired Mar 2026 | 320 Missouri St | new metal spiral staircase @ rear deck.Details
new metal spiral staircase @ rear deck. | $20,000 |
| Sep 27, 2013 | Completed final sign-off Nov 2014 | 320 Missouri St | replacing kitchen cabinets, counter top, add outlets, and new ceiling lights, lighting to comply with cec 150(k)Details
replacing kitchen cabinets, counter top, add outlets, and new ceiling lights, lighting to comply with cec 150(k) | $11,000 |
| Apr 23, 2013 | Completed final sign-off May 2014 | 3435 25th St | voluntary lateral stiffening with shearwalls. replace dry rotted roof joists. replace sub-standard foundationDetails
voluntary lateral stiffening with shearwalls. replace dry rotted roof joists. replace sub-standard foundation | $30,000 |
| Apr 5, 2013 | Completed final sign-off May 2014 | 3435 25th St | remodel of kitchen and add office at 1st floor. repair/replace extg deck boards & guardrails at 2nd floor, less than 50%. voluntary lateral strengthening at remodeled area.Details
remodel of kitchen and add office at 1st floor. repair/replace extg deck boards & guardrails at 2nd floor, less than 50%. voluntary lateral strengthening at remodeled area. | $15,000 |