Block 4036, lot 008
340 Missouri St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 2
- Units
- 2
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,424 sq ft
- Lot
- 2,526 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 24, 2026 | Completed final sign-off Apr 2026 | 340 Missouri St | Landis Halton Construction | dry-rot repair in kind stair repair. less than 50% repair at the rear of building.Details
dry-rot repair in kind stair repair. less than 50% repair at the rear of building. | $10,000 |
| Nov 22, 2021 | Completed final sign-off Dec 2021 | 342 Missouri St | R2l Roofing Inc | reroofingDetails
reroofing | $8,000 |
| Nov 5, 2020 | Completed final sign-off Dec 2021 | 340 Missouri St | Capomastro Group:Acalifornia Corp. | unit 340 - middle flr - minor interior kitchen and bathroom remodel w/ structural work. corretive abate 2021-002711enf: infill (e) opening to separate units. lower flr - replace furnace and new electrical subpanel for electrical work. install full kitchen @ 2nd fl.Details
unit 340 - middle flr - minor interior kitchen and bathroom remodel w/ structural work. corretive abate 2021-002711enf: infill (e) opening to separate units. lower flr - replace furnace and new electrical subpanel for electrical work. install full kitchen @ 2nd fl. | $100,000 |
| Jun 24, 2020 | Completed final sign-off Dec 2021 | 340 Missouri St | Capomastro Group:Acalifornia Corp. | kitchen and bathroom remodel. replace fixtures and finishesDetails
kitchen and bathroom remodel. replace fixtures and finishes | $36,000 |
| Mar 2, 2016 | Completed final sign-off Feb 2017 | 340 Missouri St | Twin Pinnacles Construction | kitchen remodel. remove and install new cabinets and counter. install new led lights, and new kitchen sink.Details
kitchen remodel. remove and install new cabinets and counter. install new led lights, and new kitchen sink. | $25,000 |
| Jan 22, 2016 | Completed final sign-off Dec 2016 | 340 Missouri St | Twin Pinnacles Construction | bearing wall removal & replacement w/new structure beamsDetails
bearing wall removal & replacement w/new structure beams | $3,000 |
| Jan 28, 2005 | Completed final sign-off Feb 2005 | 340 Missouri St | build an 8'redwood post @board fence in garden on property line along south and west sidesDetails
build an 8'redwood post @board fence in garden on property line along south and west sides | $5,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Capomastro Group:Acalifornia Corp. (2), Twin Pinnacles Construction (2), Landis Halton Construction, R2l Roofing Inc
- Architects
- Nicholas Lee
- Designers
- Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.