Landis Halton Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2019 to Jul 2026
- Last 24 months
- 6 permits filed
15 permits since 2000: 13 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Jul 2026 | 2431 Ulloa St | interior kitchen and bathroom remodel, enlarge opening between kitchen and living room, add new half bath. no expansion of building envelope or work visible from the street.Details
interior kitchen and bathroom remodel, enlarge opening between kitchen and living room, add new half bath. no expansion of building envelope or work visible from the street. | $100,000 |
| Jun 25, 2026 | In progress issued Jun 2026 | 604 Haight St | kitchen cabinet replacement in kind. no structural work.Details
kitchen cabinet replacement in kind. no structural work. | $50,000 |
| Mar 24, 2026 | Completed final sign-off Apr 2026 | 340 Missouri St | dry-rot repair in kind stair repair. less than 50% repair at the rear of building.Details
dry-rot repair in kind stair repair. less than 50% repair at the rear of building. | $10,000 |
| Nov 20, 2025 | Completed final sign-off Sep 2026 | 4307 17th St | replace siding in corner of building where dry rot is street visible at the ground level (partial replacement)Details
replace siding in corner of building where dry rot is street visible at the ground level (partial replacement) | $20,000 |
| Mar 14, 2025 | Completed final sign-off Dec 2025 | 563 Union St | cabinet and countertop replacement. kitchen with new sink (replacement)Details
cabinet and countertop replacement. kitchen with new sink (replacement) | $10,000 |
| Dec 12, 2024 | Completed final sign-off Feb 2025 | 628 Diamond St | convert (e) closet to powder roomDetails
convert (e) closet to powder room | $30,000 |
| Oct 30, 2023 | Completed final sign-off Mar 2024 | 1518 40th Av | replace kitchen cabinetry - in kind - (new cooktop/new sink)Details
replace kitchen cabinetry - in kind - (new cooktop/new sink) | $12,000 |
| Jun 12, 2023 | Completed final sign-off Sep 2023 | 4033 Judah St | tenant improvement of (e) cannabis retail space; add 3 fully opaque security shutters to entry per sfpc 145.1 ord 071-23Details
tenant improvement of (e) cannabis retail space; add 3 fully opaque security shutters to entry per sfpc 145.1 ord 071-23 | $5,000 |
| Feb 23, 2022 | Completed final sign-off May 2022 | 1237 45th Av | replacing washer & dryer in garage room (existing) - upgrade in kind. (front bldg only)Details
replacing washer & dryer in garage room (existing) - upgrade in kind. (front bldg only) | $20,000 |
| Oct 26, 2020 | Completed final sign-off Apr 2021 | 494 Filbert St | remodel kitchen & bathroom in-kind.Details
remodel kitchen & bathroom in-kind. | $50,000 |
| Oct 26, 2020 | Completed final sign-off Oct 2021 | 1567 Revere Av | bathroom remodel in-kind.Details
bathroom remodel in-kind. | $12,000 |
| Aug 28, 2020 | Completed final sign-off Oct 2021 | 1567 Revere Av | kitchen (~165 sqft) remodel in kind. replace sink, faucet and fixtures. appliances remain.Details
kitchen (~165 sqft) remodel in kind. replace sink, faucet and fixtures. appliances remain. | $60,000 |
| Jul 10, 2020 | Completed final sign-off Nov 2020 | 1220 Ellis St | #8: refresh of tile. replace shower unit w/new. install new glass door. carefully remove and reinstall grab bars & vanity. add tile to floor in walk in closet.Details
#8: refresh of tile. replace shower unit w/new. install new glass door. carefully remove and reinstall grab bars & vanity. add tile to floor in walk in closet. | $20,171 |
| Feb 25, 2020 | Completed final sign-off Jul 2020 | 1636 Filbert St | kitchen remodel. changeout kitchen cabs for refresh, install new appliances, no moving or walls, no change to existing use.Details
kitchen remodel. changeout kitchen cabs for refresh, install new appliances, no moving or walls, no change to existing use. | $80,839 |
| Jul 17, 2019 | Completed final sign-off Nov 2019 | 2176 Union St | #4: remove kitchen & bathroom, replace in kind, all electrical title 24 compliant no strucral work.Details
#4: remove kitchen & bathroom, replace in kind, all electrical title 24 compliant no strucral work. | $69,000 |