Block 4096, lot 013
788 Carolina St
- City’s use
- Single Family Residential
- Built
- 1960
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,554 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 24, 2018 | Completed final sign-off Nov 2019 | 788 Carolina St | Twin Pinnacles Construction | repair and replace 2 balconies at front as needed due to dryrot. to include sistering joists, retaining orig criss cross handrail design and retain redwood decking. add 42" glass panels to front of balconies to meet safety code of handrails. retain greater than 50% of original balconiesDetails
repair and replace 2 balconies at front as needed due to dryrot. to include sistering joists, retaining orig criss cross handrail design and retain redwood decking. add 42" glass panels to front of balconies to meet safety code of handrails. retain greater than 50% of original balconies | $4,000 |
| Mar 28, 2018 | Completed final sign-off Nov 2019 | 788 Carolina St | Twin Pinnacles Construction | replace (2) existing single pane aluminum frame windows and (2) doors at the front façade with new wood interior aluminum clad windows within existing openings.Details
replace (2) existing single pane aluminum frame windows and (2) doors at the front façade with new wood interior aluminum clad windows within existing openings. | $2,500 |
| Dec 20, 2017 | Never finaled issued Dec 2017, no final | 788 Carolina St | street spaceDetails
street space | ||
| Nov 2, 2017 | Completed final sign-off Nov 2019 | 788 Carolina St | Twin Pinnacles Construction | revision to 201708235618 structural changes only. replacement of foundation at the rear on west and south side of building.Details
revision to 201708235618 structural changes only. replacement of foundation at the rear on west and south side of building. | $10,000 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 788 Carolina St | street spaceDetails
street space | ||
| Aug 23, 2017 | Completed final sign-off Nov 2019 | 788 Carolina St | Twin Pinnacles Construction | garage fl: install moment frame and relocate furnace/water heater. 1st fl - new bedroom & bathroom and skylight, 2 new bedroom. 2nd fl - relocate kitchen from 2nd floor. roof - 4 new solar tubes at roofDetails
garage fl: install moment frame and relocate furnace/water heater. 1st fl - new bedroom & bathroom and skylight, 2 new bedroom. 2nd fl - relocate kitchen from 2nd floor. roof - 4 new solar tubes at roof | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Twin Pinnacles Construction (4)
- Architects
- Albert Urrutia
- Engineers
- Albert Urrutia, Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.