Level 10 Construction Lp

Contractor license
967797
State license record
Based in
Sunnyvale
On San Francisco permits
Apr 2012 to Dec 2025
Last 24 months
4 permits filed

245 permits since 2000: 206 completed, 4 in progress, 13 never finaled, 22 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

Stairs permits

AllRoof deck 3Stairs 26Kitchen remodel 14Bathroom remodel 35

26 stairs permits: 25 completed, 1 expired or cancelled. Typically 45 days from filing to permit and 1087 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 8, 2022Completed1 Beach Strevision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping slab. add grade bm.
Oct 14, 2021Completed1 Beach Strevision to 2020 1217 1243 including abandannont of previously proposed infull new stair and accociated mep
Dec 17, 2020Completed1 Beach Stinterior core & shell improvements. remodel grnd flr main lobby, (n) cut-out. infill of 2nd flr openings. cosmetic upgrade of (e) egress stairs, (n) restrooms on level 01-03. no change of use; no new office use$300,000
Sep 23, 2019Completed1 Beach Stremodel of interior ground floor entrance lobby to 2 floor hgh space & addition of new roof deck. extension of elevator stop to roof & extension of stair to roof. seismic upgrade. ** maher: n/a **$1,200,000
Sep 19, 2019Completed1 Market Stnew interconnecting convenience stair connecting floors 6 with floor 9. demo of (e) slabs to create (n) opening. (n) steel for stair, architectural stair includes guard and handrail details. also includes (n) rated enclosure on 2 floors around stair and lighting$750,000
Oct 2, 2018Completed181 Fremont St20th fl: construction of new non structural partitions, acoustical grid and tile & 649, board ceilings, millwork, finishes, mech, elec, and plumbing. conv. stairs, fire alarm, sprinklers, under seperate permit$1,365,000
Oct 1, 2018Completed181 Fremont St19th fl: construction of new non-structural partitions, acoustical grid & tile & gyp board ceilings, light fixtures, millwork, finishes, mechanical work, electrical, plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na$1,365,000
Oct 1, 2018Completed181 Fremont St21st fl: construction of non-structural partitions, acoustical grid & tile & gyp. board ceilings, millwork, finishes, mech, electrical & plumbing. connecting stairs, fire alarm, sprinklers under sep permit. maher na$1,365,000
Sep 17, 2018Completed181 Fremont St16th floor - construction of new non-structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes. mep included - sprinklers & f/a under separate permit. convenience stair under separate permit$1,365,000
May 23, 2018Completed181 Fremont Stconvenience stairs connecting levels 19 - 21 n/a for maher$250,000
May 23, 2018Completed181 Fremont Stconvenience stairs connecting levels 16 - 18. n/a for maher$250,000
May 7, 2018Completed181 Fremont Stinstallation of 4 levels of convenience stairs floor 35 thru 38. two hour enclosure at level 35$3,788,000
Apr 19, 2018Completed181 Fremont Stinstallation of convincence stairs from level 13 to level 15$475,000
Apr 16, 2018Completed181 Fremont Stti revision to pa 2017-1201-5329 updated smoke control enlarged pre app meeting minutes, updated green bldg checklist, move drinking fountains, revised minor changes in room layout, add 2 hour rated enclosure in stair vestibule, approve assembly occupancy load$10,000
Mar 26, 2018Completed181 Fremont Stnew 4 level convenience stair from 5th-8th floor. t.i. work under separate permits. n/a for maher$200,000
Mar 14, 2018Completed181 Fremont Ststairs interconnecting levels 9-12$200,000
Feb 13, 2018Completed181 Fremont Stconstruction of convience stairs for levels 22-24; n/a maher$40,000
Feb 13, 2018Completed181 Fremont Stconstruction of convience stairs for levels 32-34; n/a maher$40,000
Jan 31, 2018Completed181 Fremont St29th floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher$2,700,000
Jan 31, 2018Completed181 Fremont St31st floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher$2,800,000
Jan 31, 2018Completed181 Fremont St30th floor: full floor tenent with non-structural partitions, new ceilings, millwork, finishes. convenience stairs, fire alarm sprinklers on separate permit. n/a for maher$3,100,000
Dec 28, 2017Completed181 Fremont St29th & 30th & 31st flrs.- new 3 level convinience stairs. maher na$150,000
Dec 6, 2017Completed181 Fremont St4th flr: ti- construction of 705 sq office space - new non structural partitions. light fixtures and finishes, no change in exit stairs, egress path, elevator, restrooms & showers. construction of grease interceptor rooms & security control room.$100,000
Nov 7, 2017Completed181 Fremont St25th floor - construction of non-structural partitions, ceiling,light fixtures, finishes. construction of new convinence stairs from 25th to 26th floor. construction of new ktichen & servery. n/a maher ordinance$2,100,000
Oct 10, 2017Completed181 Fremont Stconvenience stair installation between floor 26 to 28. maher na$435,000
Mar 16, 2016Expired or cancelled2901 Broadwaynew interior stair (steel construction) deferred submittal for bpa# 2014-0701-0243 & bpa# 2013-0610-9080. structural only.n/a for maher$450,000