Back to kitchen remodel contractors
D.F.P.F Corp Dba Fine Line Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 6 permits filed
301 permits since 2000: 244 completed, 7 in progress, 33 never finaled, 17 expired or cancelled.
Of the 33 never-finaled permits, 13 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
48 kitchen remodel permits: 37 completed, 1 in progress, 9 never finaled, 1 expired or cancelled. Typically 159 days from filing to permit and 1079 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2026 | In progress issued Jul 2026 | 774 Tehama St | revision to pa# 202412307532: relocate toilet room from 1st floor to 2nd floor and add bathtub. lengthen kitchenette. no change in quantity of light fixtures.Details
revision to pa# 202412307532: relocate toilet room from 1st floor to 2nd floor and add bathtub. lengthen kitchenette. no change in quantity of light fixtures. | |
| Sep 16, 2022 | Completed final sign-off May 2024 | 1240 Fillmore St | revision to original permit #201912270828 approved pm 06/16/2021. new mail and package room w/ new usps mailboxes, new interior storefront system at manager and service offices; add kitchenette at (e) conference rm 2; management office re-organization.Details
revision to original permit #201912270828 approved pm 06/16/2021. new mail and package room w/ new usps mailboxes, new interior storefront system at manager and service offices; add kitchenette at (e) conference rm 2; management office re-organization. | $150,000 |
| Jun 19, 2017 | Completed final sign-off Nov 2018 | 1855 15th St | revision to pa# 2015-1030-1342: remove tub and replace with roll in shower at unit #110. revise location of kitchen at unit #400. add closet and tv cabinet at community rm.Details
revision to pa# 2015-1030-1342: remove tub and replace with roll in shower at unit #110. revise location of kitchen at unit #400. add closet and tv cabinet at community rm. | $60,000 |
| Mar 29, 2017 | Completed final sign-off Sep 2018 | 3850 18th St | revision to 201510301343: remove bathtubs & replace with roll-in showers, at 2 units 212 & 518 . change location & layout of community kitchen & revise electrical, cabinets, door & finishes. revise 1 door & sidelight. add shower threshold detail at roll-in showersDetails
revision to 201510301343: remove bathtubs & replace with roll-in showers, at 2 units 212 & 518 . change location & layout of community kitchen & revise electrical, cabinets, door & finishes. revise 1 door & sidelight. add shower threshold detail at roll-in showers | $120,000 |
| Mar 1, 2016 | Completed final sign-off Jan 2017 | 430 Turk St | revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit,Details
revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit, | |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 900 Ellsworth St | rad. bldg 18, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 18, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 512 Alemany Bl | rad. bldg 20, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 20, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 982 Ellsworth St | rad. bldg 2, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 2, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 536 Alemany Bl | rad. bldg 16, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 16, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 958 Ellsworth St | rad. bldg 4, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 4, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 500 Alemany Bl | rad. bldg 21, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 21, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 957 Ellsworth St | rad. bldg 11, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 11, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 845 Ellsworth St | rad. bldg 23, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 23, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 925 Ellsworth St | rad. bldg 15, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinish hardwood floors, enlarging concrete stoops. new office layouts. change community room to maintenance room. new sprinkler system.Details
rad. bldg 15, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinish hardwood floors, enlarging concrete stoops. new office layouts. change community room to maintenance room. new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 817 Ellsworth St | rad. bldg 25, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 25, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 861 Ellsworth St | rad. bldg 22, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 22, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 945 Ellsworth St | rad. bldg 12, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 12, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 524 Alemany Bl | rad. bldg 17, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 17, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 932 Ellsworth St | rad. bldg 7, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 7, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 830 Ellsworth St | rad. bldg 24, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 24, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 600 Alemany Bl | rad. bldg 1, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 1, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 801 Ellsworth St | rad. bldg 26, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors.Details
rad. bldg 26, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarge concrete stoops. remove 2 level deck, replace with 1 level deck. awning over front entry doors. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 916 Ellsworth St | rad. bldg 8, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 8, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 970 Ellsworth St | rad. bldg 3, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 3, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 548 Alemany Bl | rad. bldg 14, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 14, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2019 | 901 Ellsworth St | rad. bldg 19, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system.Details
rad. bldg 19, replace exterior & interior door & hardware, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlarging concrete stoops, new sprinkler system. | $1,982,000 |
| Feb 18, 2016 | Completed final sign-off Jul 2019 | 944 Ellsworth St | rad. bldg 6, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system.Details
rad. bldg 6, replace exterior & interior door & hardward, window, roofing, downspont, water heater, furnances, remodel kitchen & bathrm, flooring, light fixture, refinishing hardwood floor, enlargeing concrete stoop, new sprinkler system. | $1,982,000 |
| Oct 30, 2015 | Completed final sign-off Sep 2018 | 1855 15th St | rad priority. renovate(e)bldg incl:seismic retrofit,window replacement. modify 12% units to mobility & 4% units umb to be communications.renov(e) community rm,kitchen&service spaces. renovate unit to provide in kind replacement kitchens&plumbing fixtures per unit scope matrix.elevator modernization.Details
rad priority. renovate(e)bldg incl:seismic retrofit,window replacement. modify 12% units to mobility & 4% units umb to be communications.renov(e) community rm,kitchen&service spaces. renovate unit to provide in kind replacement kitchens&plumbing fixtures per unit scope matrix.elevator modernization. | $17,000,000 |
| Oct 30, 2015 | Completed final sign-off Jul 2018 | 3850 18th St | rad priority. renovation of bldg include window replace, modification of 10% to mobility, 40% to be communications. renovation of community rm & kitchen, reorganization of spaces to office, unit renovations in kind, replace kitchen, plumb fixture per unit slope matrix. ** maher: n/a **Details
rad priority. renovation of bldg include window replace, modification of 10% to mobility, 40% to be communications. renovation of community rm & kitchen, reorganization of spaces to office, unit renovations in kind, replace kitchen, plumb fixture per unit slope matrix. ** maher: n/a ** | $16,000,000 |
| Sep 16, 2015 | Completed final sign-off Aug 2017 | 1885 Mission St | comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvementDetails
comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvement | $350,000 |
| Sep 2, 2015 | Completed final sign-off Apr 2019 | 1750 Mcallister St | rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred.Details
rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred. | $12,000,000 |
| Apr 17, 2015 | Completed final sign-off Jan 2017 | 430 Turk St | moh rad program structural improvements at 9th floor modernization of units to include kitchens, bathrooms, flooring and finishes, reconfiguring units for accessibility (5) sprinklers under separate permitDetails
moh rad program structural improvements at 9th floor modernization of units to include kitchens, bathrooms, flooring and finishes, reconfiguring units for accessibility (5) sprinklers under separate permit | $11,186,639 |
| Apr 2, 2015 | Completed final sign-off Sep 2017 | 156 Appleton Av | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 183 Highland Av | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 136 Appleton Av | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 45 Patton St | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 1 Patton St | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Completed final sign-off Sep 2017 | 174 Appleton Av | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 169 Highland Av | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 155 Highland Av | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 112 Appleton Av | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 2, 2015 | Never finaled issued Nov 2015, no final | 137 Highland Av | mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal &Details
mohcd rad program. furring & insulation @ perimeter wall flooring, kitchen cabinetry, appliances replaced, elect, ventin & laundry hookup, bathrm sink, tub surround & blocking. bldg work; strap add to roof for seismic safety, roofing. exter lighting replace. boiler repair/replace, solar thermal & | $1,733,625 |
| Apr 1, 2015 | Completed final sign-off Oct 2017 | 345 Hermann St | mohcd rad program. unit renovation(kitchen & bathroom).conversion of 3 ada units/2 audio/visual units.window replacement.new addition @ g/f entrance on duboce ave.seismic upgrades/electrical/mechan & elevator upgrades. fire sprinklr & fire alarm sym will be under separate permit.(deferred)Details
mohcd rad program. unit renovation(kitchen & bathroom).conversion of 3 ada units/2 audio/visual units.window replacement.new addition @ g/f entrance on duboce ave.seismic upgrades/electrical/mechan & elevator upgrades. fire sprinklr & fire alarm sym will be under separate permit.(deferred) | $6,701,351 |
| Mar 20, 2015 | Completed final sign-off Sep 2017 | 25 Sanchez St | mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 5 ada unit & 2 audio/visual units. window replacement new offices, renovation of community room, electrical, mechanical, structural upgrades.Details
mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 5 ada unit & 2 audio/visual units. window replacement new offices, renovation of community room, electrical, mechanical, structural upgrades. | $8,300,000 |
| Mar 20, 2015 | Never finaled issued Nov 2015, no final | 255 Woodside Av | mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 6 ada unit & 2 audio/visual units. window replacement new enclosed entry lobby, electrical, mechanical, elevator upgrades.Details
mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 6 ada unit & 2 audio/visual units. window replacement new enclosed entry lobby, electrical, mechanical, elevator upgrades. | $10,400,000 |
| Mar 18, 2008 | Completed final sign-off Jul 2009 | 390 Clementina St | misc demolition. replace e kitchenettes at res units. replace existing bathroom roof ventilation fans. replace e water shutoff valves at 1st flr. reroof building, replace e finishes at res units. repaint exterior of bldg.Details
misc demolition. replace e kitchenettes at res units. replace existing bathroom roof ventilation fans. replace e water shutoff valves at 1st flr. reroof building, replace e finishes at res units. repaint exterior of bldg. | $2,500,000 |
| Feb 14, 2008 | Completed final sign-off Nov 2008 | 390 Clementina St | kitchen cabinet replacement and floor replacement in suite 205. no structural no moving doors walls or windows, no electrical/plumbing under this permit.Details
kitchen cabinet replacement and floor replacement in suite 205. no structural no moving doors walls or windows, no electrical/plumbing under this permit. | $4,400 |
| Aug 5, 2003 | Expired or cancelled expired Dec 2005 | 210 Jones St | interior demo and renovation of (e) restaurant in tenant space to include relocation of kitchen newDetails
interior demo and renovation of (e) restaurant in tenant space to include relocation of kitchen new | $200,000 |