Back to bathroom remodel contractors
D.F.P.F Corp Dba Fine Line Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 6 permits filed
301 permits since 2000: 244 completed, 7 in progress, 33 never finaled, 17 expired or cancelled.
Of the 33 never-finaled permits, 13 are 5 to 10 years old, 20 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 1 never finaled, 1 expired or cancelled. Typically 215 days from filing to permit and 398 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2018 | Completed final sign-off Jul 2019 | 958 Ellsworth St | revision to 201602189855-s5. revised plans fp-8 and fp-9 nfpa 13r. applicable codes 2013 nfpa13r. changes are the removal of sprinkler heads in the bathrooms and closets. hydraulic calculations and pipe sizes were not changed from the original nfpa13 desgin woth tthe elimination of those sprinklersDetails
revision to 201602189855-s5. revised plans fp-8 and fp-9 nfpa 13r. applicable codes 2013 nfpa13r. changes are the removal of sprinkler heads in the bathrooms and closets. hydraulic calculations and pipe sizes were not changed from the original nfpa13 desgin woth tthe elimination of those sprinklers | |
| Jun 7, 2018 | Completed final sign-off Jul 2019 | 958 Ellsworth St | revised fire sprinkler 201602189885-s5 per nfpa 13 to be approved per nfpa 13r. removal of sp heads in baths, closets. hydraulic calcs and pipe sized not changed from orig design. plan sheets fp1 thru fp7 and fp10Details
revised fire sprinkler 201602189885-s5 per nfpa 13 to be approved per nfpa 13r. removal of sp heads in baths, closets. hydraulic calcs and pipe sized not changed from orig design. plan sheets fp1 thru fp7 and fp10 | $1,982 |
| Feb 14, 2018 | Expired or cancelled withdrawn Apr 2018 | 15 Brush Pl | additional work to previously approved pa #201706255077. create new 2nd fl from (e) mezzanine. all bathrooms to be updated to ada compliance. correct pa #200706255077 to classify structure as 1-story and mezzanine instead of 2-story.Details
additional work to previously approved pa #201706255077. create new 2nd fl from (e) mezzanine. all bathrooms to be updated to ada compliance. correct pa #200706255077 to classify structure as 1-story and mezzanine instead of 2-story. | $45,000 |
| Mar 1, 2016 | Completed final sign-off Jan 2017 | 430 Turk St | revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit,Details
revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit, | |
| Sep 2, 2015 | Completed final sign-off Apr 2019 | 1750 Mcallister St | rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred.Details
rad project. 830 sq ft ground floor expansion at rear, exterior paint, (n) kitchen, bath, and finishes in residential units, repaving of parking lot. sprinkler, alarm, elevator deferred. | $12,000,000 |
| Apr 17, 2015 | Completed final sign-off Jan 2017 | 430 Turk St | moh rad program structural improvements at 9th floor modernization of units to include kitchens, bathrooms, flooring and finishes, reconfiguring units for accessibility (5) sprinklers under separate permitDetails
moh rad program structural improvements at 9th floor modernization of units to include kitchens, bathrooms, flooring and finishes, reconfiguring units for accessibility (5) sprinklers under separate permit | $11,186,639 |
| Apr 1, 2015 | Completed final sign-off Oct 2017 | 345 Hermann St | mohcd rad program. unit renovation(kitchen & bathroom).conversion of 3 ada units/2 audio/visual units.window replacement.new addition @ g/f entrance on duboce ave.seismic upgrades/electrical/mechan & elevator upgrades. fire sprinklr & fire alarm sym will be under separate permit.(deferred)Details
mohcd rad program. unit renovation(kitchen & bathroom).conversion of 3 ada units/2 audio/visual units.window replacement.new addition @ g/f entrance on duboce ave.seismic upgrades/electrical/mechan & elevator upgrades. fire sprinklr & fire alarm sym will be under separate permit.(deferred) | $6,701,351 |
| Mar 20, 2015 | Completed final sign-off Sep 2017 | 25 Sanchez St | mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 5 ada unit & 2 audio/visual units. window replacement new offices, renovation of community room, electrical, mechanical, structural upgrades.Details
mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 5 ada unit & 2 audio/visual units. window replacement new offices, renovation of community room, electrical, mechanical, structural upgrades. | $8,300,000 |
| Mar 20, 2015 | Never finaled issued Nov 2015, no final | 255 Woodside Av | mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 6 ada unit & 2 audio/visual units. window replacement new enclosed entry lobby, electrical, mechanical, elevator upgrades.Details
mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 6 ada unit & 2 audio/visual units. window replacement new enclosed entry lobby, electrical, mechanical, elevator upgrades. | $10,400,000 |
| Feb 7, 2012 | Completed final sign-off Nov 2014 | 3155 Scott St | remodel basement & 1st floors. upgrade seismic. ada, elec, mech system. 4 new ada units on 2nd floor. 3 new bathrooms on 3rd floor. new lula elevator for floors b-2. replace roofing. new exterior upgrades. new windows. (e) tourist hotel will be a future residential apartment for youth housing.Details
remodel basement & 1st floors. upgrade seismic. ada, elec, mech system. 4 new ada units on 2nd floor. 3 new bathrooms on 3rd floor. new lula elevator for floors b-2. replace roofing. new exterior upgrades. new windows. (e) tourist hotel will be a future residential apartment for youth housing. | $1,940,000 |
| Aug 4, 2010 | Completed final sign-off May 2011 | 801 Howard St | repair extg unit # 413 including new finishes upgrade extg bathroom with accessibility improvements. replace one extg window in kind. replace one sliding door to deck in kindDetails
repair extg unit # 413 including new finishes upgrade extg bathroom with accessibility improvements. replace one extg window in kind. replace one sliding door to deck in kind | $45,000 |
| Oct 23, 2008 | Completed final sign-off Dec 2009 | 165 10th St | accessible bathrooms, (n) mezzanine, soft demolition. voluntary structural improvements, minor exterior modifications, (n) electric, plumbing upgrade.Details
accessible bathrooms, (n) mezzanine, soft demolition. voluntary structural improvements, minor exterior modifications, (n) electric, plumbing upgrade. | $400,000 |
| Mar 18, 2008 | Completed final sign-off Jul 2009 | 390 Clementina St | misc demolition. replace e kitchenettes at res units. replace existing bathroom roof ventilation fans. replace e water shutoff valves at 1st flr. reroof building, replace e finishes at res units. repaint exterior of bldg.Details
misc demolition. replace e kitchenettes at res units. replace existing bathroom roof ventilation fans. replace e water shutoff valves at 1st flr. reroof building, replace e finishes at res units. repaint exterior of bldg. | $2,500,000 |
| Nov 26, 2007 | Completed final sign-off Jul 2009 | 390 Clementina St | 2nd floor: additoin & renovations, including new storfront, bathroom accessibility improvements & infill area under roof overhang, selective demo, new finishes, lighting upgrades, electrical plumbing.Details
2nd floor: additoin & renovations, including new storfront, bathroom accessibility improvements & infill area under roof overhang, selective demo, new finishes, lighting upgrades, electrical plumbing. | $75,000 |
| Jan 24, 2007 | Completed final sign-off Dec 2010 | 44 Mcallister St | renovation of (e) building, maintain the same number of units; relocate some (e) partition walls; installation of (n) horizontal addition elevator tower; renovation of common bathrooms, shoklers & toilets; (n0 plumbing at (e0 sro units, site permit, separate permit for fire alarm & sprinkler.Details
renovation of (e) building, maintain the same number of units; relocate some (e) partition walls; installation of (n) horizontal addition elevator tower; renovation of common bathrooms, shoklers & toilets; (n0 plumbing at (e0 sro units, site permit, separate permit for fire alarm & sprinkler. | |
| Jun 25, 2004 | Completed final sign-off Dec 2005 | 180 Turk St | revision to issued permit #200202280318. revision of accessible bathrooms. additional of mechanicalDetails
revision to issued permit #200202280318. revision of accessible bathrooms. additional of mechanical | $100,000 |