Permit GraphShortlistSan Francisco building permits since 2000

Block 0349, lot 004

44 Mcallister St

City’s use
Commercial Hotel
Built
1923
Stories
8
Units
217
Rooms
14 bathrooms
Building
59,684 sq ft
Lot
9,474 sq ft
Zoning
RC4
Construction type
B

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

25 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 10, 2021Completed
final sign-off Jul 2021
44 Mcallister StFaragon Restoration Ltd#217: remove and replace existing sheetrock & replace insulation. non-structural work. no new walls. (insulation, sheetrock, framing "like for like")
Details
Permit
202106102084
Permit issued
Jun 10, 2021
Final sign-off
Jul 22, 2021

#217: remove and replace existing sheetrock & replace insulation. non-structural work. no new walls. (insulation, sheetrock, framing "like for like")

Open the permit page

$31,895
Dec 5, 2019Completed
final sign-off Jul 2020
44 Mcallister StSan Francisco Fire Protectioninstall new power supply panel and new door hodler on lower level & groudn floor for new doors, new devices will be tie-in to (e) control panel on ground fl. ref pa 2009-0702-1899
Details
Permit
201912058757
Permit issued
Dec 5, 2019
Final sign-off
Jul 30, 2020

install new power supply panel and new door hodler on lower level & groudn floor for new doors, new devices will be tie-in to (e) control panel on ground fl. ref pa 2009-0702-1899

Open the permit page

$2,000
May 28, 2019Never finaled
issued May 2019, no final
44 Mcallister Ststreet space
Details
Permit
M1086188
Permit issued
May 28, 2019

street space

Open the permit page

Sep 14, 2018Never finaled
issued Oct 2018, no final
44 Mcallister StEvolution Energy Solutions Llcinstallation of new solar system.
Details
Permit
201809140228
Permit issued
Oct 3, 2018

installation of new solar system.

Open the permit page

$20,000
Nov 20, 2017Never finaled
issued Nov 2017, no final
44 Mcallister StInternational Waterproofingre-roofing
Details
Permit
201711204327
Permit issued
Nov 20, 2017

re-roofing

Open the permit page

$26,000
Mar 15, 2011Completed
final sign-off Mar 2011
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionrevision to pa# 2007.01.24.2425 s4, delta #10 dated 23/15/11. revisw title 24 adapatable units fromunit#s g10,220,320,520,620,720,820. to units 212,312,412,512,612,712,812. revisions to plan lay out urh 2,3,4/ no exterior work under this permit. total# of adaptable units to remain the same
Details
Permit
201103152097
Permit issued
Mar 16, 2011
Final sign-off
Mar 21, 2011

revision to pa# 2007.01.24.2425 s4, delta #10 dated 23/15/11. revisw title 24 adapatable units fromunit#s g10,220,320,520,620,720,820. to units 212,312,412,512,612,712,812. revisions to plan lay out urh 2,3,4/ no exterior work under this permit. total# of adaptable units to remain the same

Open the permit page

$5,000
Nov 30, 2010Never finaled
issued Nov 2010, no final
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionto obtain final inspection for work approved under pa #200607196961, all work is complet.
Details
Permit
201011305799
Permit issued
Nov 30, 2010

to obtain final inspection for work approved under pa #200607196961, all work is complet.

Open the permit page

Nov 23, 2010Completed
final sign-off Dec 2010
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructioninstall 2 security gates at existing exterior exit paths, within existing property line.
Details
Permit
201011235544
Permit issued
Nov 30, 2010
Final sign-off
Dec 14, 2010

install 2 security gates at existing exterior exit paths, within existing property line.

Open the permit page

$10,000
Sep 3, 2010Completed
final sign-off Dec 2010
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionrevision to pa #2007-0124-2425 to replace 56 single glazed windows with double glazed, all are same size as original. nov#201044498-bid, 200993147-pid, 201063971-pid, 201063976-pid.
Details
Permit
201009030256
Permit issued
Oct 8, 2010
Final sign-off
Dec 7, 2010

revision to pa #2007-0124-2425 to replace 56 single glazed windows with double glazed, all are same size as original. nov#201044498-bid, 200993147-pid, 201063971-pid, 201063976-pid.

Open the permit page

$125,000
Aug 30, 2010Never finaled
issued Aug 2010, no final
44 Mcallister Ststreet space
Details
Permit
M218488
Permit issued
Aug 30, 2010

street space

Open the permit page

Jun 10, 2010Completed
final sign-off Dec 2010
44 Mcallister StPriority Architectural Graphics Dba Prioinstall ten (60) evacuation signs for sffd review of new construction ( not completed yet)
Details
Permit
201006104281
Permit issued
Aug 18, 2010
Final sign-off
Dec 7, 2010

install ten (60) evacuation signs for sffd review of new construction ( not completed yet)

Open the permit page

$3,000
May 11, 2010Never finaled
issued May 2010, no final
44 Mcallister Ststreet space permit
Details
Permit
M201507
Permit issued
May 11, 2010

street space permit

Open the permit page

Mar 9, 2010Completed
final sign-off Sep 2010
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionrevision to permit 2007/0124/2425-s3. revise ducted air supply to plenum air supply at grid 4-e, floor 3-8..
Details
Permit
201003097869
Permit issued
Jul 27, 2010
Final sign-off
Sep 30, 2010

revision to permit 2007/0124/2425-s3. revise ducted air supply to plenum air supply at grid 4-e, floor 3-8..

Open the permit page

Jan 19, 2010Completed
final sign-off Jan 2011
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionprovide structural sidewalk slab for pg&e vault. revision to 2007/01242425-s4/r2.
Details
Permit
201001194885
Permit issued
Jan 19, 2010
Final sign-off
Jan 14, 2011

provide structural sidewalk slab for pg&e vault. revision to 2007/01242425-s4/r2.

Open the permit page

$500
Jan 19, 2010Completed
final sign-off Oct 2010
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionadd partitin wall/mech. at ground floor, per pg&e request for gas meter room. revision to 2007/0124/2425-s4/r2.
Details
Permit
201001194882
Permit issued
Jan 19, 2010
Final sign-off
Oct 1, 2010

add partitin wall/mech. at ground floor, per pg&e request for gas meter room. revision to 2007/0124/2425-s4/r2.

Open the permit page

$500
Nov 12, 2009Never finaled
issued Nov 2009, no final
44 Mcallister Ststreet space
Details
Permit
M184081
Permit issued
Nov 12, 2009

street space

Open the permit page

Jul 21, 2009Completed
final sign-off Oct 2010
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionrevision to pa# 2007.01.24.2425 showing (e) step to remain at (e) fire escape to remain
Details
Permit
200907213130
Permit issued
Jul 23, 2009
Final sign-off
Oct 1, 2010

revision to pa# 2007.01.24.2425 showing (e) step to remain at (e) fire escape to remain

Open the permit page

Jul 2, 2009Completed
final sign-off Dec 2010
44 Mcallister StIntrepid Electronic Systems Incprovide a new fire alarm system w/ auto. voice evacuation message. system to monitor sprinkler system. provide elevator recall functions. release fire doors. provide area smoke detection for res. corridors & common areas. manual pull stations at stair landings and exits
Details
Permit
200907021899
Permit issued
Aug 26, 2009
Final sign-off
Dec 6, 2010

provide a new fire alarm system w/ auto. voice evacuation message. system to monitor sprinkler system. provide elevator recall functions. release fire doors. provide area smoke detection for res. corridors & common areas. manual pull stations at stair landings and exits

Open the permit page

$195,000
May 12, 2009Never finaled
issued May 2009, no final
44 Mcallister Ststreet space
Details
Permit
M163766
Permit issued
May 12, 2009

street space

Open the permit page

Mar 20, 2009Completed
final sign-off Sep 2010
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionrevision to 200701242425 addenda 2: only revision to 20 gauge partition wall studs to 25 gauge partition wall studs at 16" oc, 25 gauge to be 250d525, max 12'1 height. no structural
Details
Permit
200903204550
Permit issued
Mar 24, 2009
Final sign-off
Sep 30, 2010

revision to 200701242425 addenda 2: only revision to 20 gauge partition wall studs to 25 gauge partition wall studs at 16" oc, 25 gauge to be 250d525, max 12'1 height. no structural

Open the permit page

Dec 4, 2008Completed
final sign-off Dec 2010
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionrevision to 200701242425: work consists of ultrafine cement/permeation grouting of the sands for the new elevator pit and part of the adjacent retaining wall footing.
Details
Permit
200812047793
Permit issued
Dec 4, 2008
Final sign-off
Dec 7, 2010

revision to 200701242425: work consists of ultrafine cement/permeation grouting of the sands for the new elevator pit and part of the adjacent retaining wall footing.

Open the permit page

$80,000
Nov 13, 2008Completed
final sign-off Dec 2010
44 Mcallister StTony Ng Plumbing Corevise existing fire sprinkler system and replace all sprinkler heads with fast response in public areas and residential heads inside units. total 956 heads
Details
Permit
200811136456
Permit issued
Nov 13, 2008
Final sign-off
Dec 6, 2010

revise existing fire sprinkler system and replace all sprinkler heads with fast response in public areas and residential heads inside units. total 956 heads

Open the permit page

$215,000
Jan 24, 2007Completed
final sign-off Dec 2010
44 Mcallister StD.F.P.F Corp Dba Fine Line Constructionrenovation of (e) building, maintain the same number of units; relocate some (e) partition walls; installation of (n) horizontal addition elevator tower; renovation of common bathrooms, shoklers & toilets; (n0 plumbing at (e0 sro units, site permit, separate permit for fire alarm & sprinkler.
Details
Permit
200701242425
Permit issued
Dec 26, 2007
Final sign-off
Dec 7, 2010

renovation of (e) building, maintain the same number of units; relocate some (e) partition walls; installation of (n) horizontal addition elevator tower; renovation of common bathrooms, shoklers & toilets; (n0 plumbing at (e0 sro units, site permit, separate permit for fire alarm & sprinkler.

Open the permit page

Jul 19, 2006Expired or cancelled
expired Mar 2007
44 Mcallister Stpermit is to correct city records to show (e) 211 group housing rooms plus 1 manager apt.no construction work with this permit.
Details
Permit
200607196961
Permit issued
Jul 19, 2006

permit is to correct city records to show (e) 211 group housing rooms plus 1 manager apt.no construction work with this permit.

Open the permit page

Jun 1, 2004Never finaled
issued Jun 2004, no final
44 Mcallister Stsidewalk repair
Details
Permit
M27699
Permit issued
Jun 1, 2004

sidewalk repair

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
D.F.P.F Corp Dba Fine Line Construction (11), Evolution Energy Solutions Llc, Faragon Restoration Ltd, International Waterproofing, Intrepid Electronic Systems Inc, Priority Architectural Graphics Dba Prio, San Francisco Fire Protection, Tony Ng Plumbing Co
Architects
James D. Fagler (7), Lisa Gelfand
Authorized agents
Jim Fagler

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.