Block 0758, lot 028
1015 Laguna St
- City’s use
- Multi-Family Residential
- Built
- 1972
- Stories
- 2
- Units
- 98
- Rooms
- 126 bedrooms, 126 bathrooms
- Building
- 98,315 sq ft
- Lot
- 100,902 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
52 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2024 | Completed final sign-off Feb 2024 | 1055 Laguna St | Ace Roofing Company | building #8 refoofingDetails
building #8 refoofing | $25,000 |
| Dec 12, 2023 | Expired or cancelled cancelled Mar 2024 | 1086 Golden Gate Av | Ace Roofing Company | reroofingDetails
reroofing | $78,500 |
| Aug 22, 2023 | Never finaled issued Sep 2023, no final | 1001 Laguna St | Cesar Caro | apt a: remove replace kitchen cabinets. remove replace bathtub. remove main panel out of closet. remove and replace flooring. update electrical bathroom & kitchen. kitchen and bath remodel.Details
apt a: remove replace kitchen cabinets. remove replace bathtub. remove main panel out of closet. remove and replace flooring. update electrical bathroom & kitchen. kitchen and bath remodel. | $30,000 |
| Aug 7, 2023 | Completed final sign-off Sep 2023 | 1086 Golden Gate Av | Ati Restoration Llc | buildingtn 1035, unit# d: replace drywall; one side cabinets upper and lower as in kind. reinstall stove and range hood. walls and prtial ceiling as needed due to smoke damage and water damage. to comply w/ nov 202310112Details
buildingtn 1035, unit# d: replace drywall; one side cabinets upper and lower as in kind. reinstall stove and range hood. walls and prtial ceiling as needed due to smoke damage and water damage. to comply w/ nov 202310112 | $5,000 |
| Dec 2, 2022 | Completed final sign-off Jan 2023 | 1086 Golden Gate Av | Eps Remodel Inc | bldg #6: remove drain and dry rot 4ft x 4ft around replace dryrot where water damaged the roof membrane. paint all flashing and siding around the access door.Details
bldg #6: remove drain and dry rot 4ft x 4ft around replace dryrot where water damaged the roof membrane. paint all flashing and siding around the access door. | $8,400 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 1086 Golden Gate Av | Hardy Window Company | recreation center: window change out, provide and install (9) windows and (2) patio slider doors all to be retro fit white vinyl windows, like for like, installation not to enlarge or reducing existing frame opening same device operation, meet title 24 and safety glazing where needed. u = 0.30 maxDetails
recreation center: window change out, provide and install (9) windows and (2) patio slider doors all to be retro fit white vinyl windows, like for like, installation not to enlarge or reducing existing frame opening same device operation, meet title 24 and safety glazing where needed. u = 0.30 max | $17,650 |
| Nov 14, 2022 | Never finaled issued Nov 2022, no final | 1086 Golden Gate Av | Hardy Window Company | building #8: windows change out provide and install 30 windows and 13 pation slider doors all to be retro fit white vinyle windows like for like not enlarging or reducing (e) frame onpenig same device operation meet tiltle 24 and safety glazing were neededDetails
building #8: windows change out provide and install 30 windows and 13 pation slider doors all to be retro fit white vinyle windows like for like not enlarging or reducing (e) frame onpenig same device operation meet tiltle 24 and safety glazing were needed | $68,994 |
| Nov 14, 2022 | Completed final sign-off May 2023 | 1086 Golden Gate Av | Hardy Window Company | building #7: windows change out provide and install 88 windows all to be retrofit vinyl windows like for like installation not enlarging or reducing (e) frame opening same device operation meet title 24 and safety glazing where neededDetails
building #7: windows change out provide and install 88 windows all to be retrofit vinyl windows like for like installation not enlarging or reducing (e) frame opening same device operation meet title 24 and safety glazing where needed | $141,198 |
| Nov 9, 2022 | Completed final sign-off May 2023 | 1086 Golden Gate Av | Hardy Window Company | bldg #5: windows change out to comply with 202291744: provide and install (57) windows. all to be retrofit white vinyl windows. like for like installation not enlarging or reducing existing frame opening. same devile operation. meet title 24 and safety glazing where needed. max u-factor 0.30.Details
bldg #5: windows change out to comply with 202291744: provide and install (57) windows. all to be retrofit white vinyl windows. like for like installation not enlarging or reducing existing frame opening. same devile operation. meet title 24 and safety glazing where needed. max u-factor 0.30. | $91,458 |
| Nov 9, 2022 | Completed final sign-off Feb 2023 | 1086 Golden Gate Av | Hardy Window Company | bldg #6: windows change out to comply with 202291744: provide and install (28) windows and (14) patio slider doors all to be retrofit white vinyl windows like fo rlike. not enlarging or reducing existing frame opening. same same devile operation meet title 24 and safety glazing where needed.Details
bldg #6: windows change out to comply with 202291744: provide and install (28) windows and (14) patio slider doors all to be retrofit white vinyl windows like fo rlike. not enlarging or reducing existing frame opening. same same devile operation meet title 24 and safety glazing where needed. | $67,390 |
| Nov 8, 2022 | Never finaled issued Nov 2022, no final | 1086 Golden Gate Av | Hardy Window Company | bldg #4:to comply with 202291744. some visible from the street & some facing the court yard.provide & install 46 windows. all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing extg frame opening same device peration meet title 24 & safty glazing where needed.Details
bldg #4:to comply with 202291744. some visible from the street & some facing the court yard.provide & install 46 windows. all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing extg frame opening same device peration meet title 24 & safty glazing where needed. | $73,808 |
| Nov 8, 2022 | Completed final sign-off Aug 2023 | 1086 Golden Gate Av | Hardy Window Company | bldg #3: to comply with 202291744. some visible from the street & some facing the court yard.provide & install 49 windows. all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing extg frame opening same device peration meet title 24 & safty glazing where needed.Details
bldg #3: to comply with 202291744. some visible from the street & some facing the court yard.provide & install 49 windows. all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing extg frame opening same device peration meet title 24 & safty glazing where needed. | $78,621 |
| Oct 27, 2022 | Completed final sign-off Feb 2023 | 1080 Golden Gate Av | Hardy Window Company | bldg #2. to comply w/ nov #202291744, #202292748. provide & install 37 window all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing (e) frame opening same device operation meet title 24 & safety. glazing where needed.Details
bldg #2. to comply w/ nov #202291744, #202292748. provide & install 37 window all to be retrofit. white vinyl windows like for like installation. not enlarging or reducing (e) frame opening same device operation meet title 24 & safety. glazing where needed. | $59,367 |
| Oct 26, 2022 | Completed final sign-off Feb 2023 | 1080 Golden Gate Av | Hardy Window Company | bldg #1: window replacment. provide and install 28 window and 15 patio sliding doors. all to be retrofit vinyl window like for like.installation not enlarging or reducing extg frame opening. white color same device operation meeting title 24 & safety glazing where needed.Details
bldg #1: window replacment. provide and install 28 window and 15 patio sliding doors. all to be retrofit vinyl window like for like.installation not enlarging or reducing extg frame opening. white color same device operation meeting title 24 & safety glazing where needed. | $68,994 |
| Oct 20, 2022 | Completed final sign-off Oct 2022 | 1086 Golden Gate Av | Eps Remodel Inc | building #3: remove dryrot around roof drain. replace section where water damage the roof mambrane. paint all flashing and siding around access doors. approx 20sqftDetails
building #3: remove dryrot around roof drain. replace section where water damage the roof mambrane. paint all flashing and siding around access doors. approx 20sqft | $7,800 |
| Oct 20, 2022 | Completed final sign-off Oct 2022 | 1086 Golden Gate Av | Eps Remodel Inc | building #4: remove dryrot around roof drain. replace section where water damage the roof mambrane. paint all flashing and siding around access doors. all work approx 20sqftDetails
building #4: remove dryrot around roof drain. replace section where water damage the roof mambrane. paint all flashing and siding around access doors. all work approx 20sqft | $7,800 |
| Aug 1, 2022 | Completed final sign-off Aug 2022 | 1086 Golden Gate Av | Quality Sf Roofing | emove complete asphaltgravel remove complete fleshing metals. prepare for new installation bitumen to arch down membrane. install new flashing metals install final layer granulad bitument torch down -units 1001-1015Details
emove complete asphaltgravel remove complete fleshing metals. prepare for new installation bitumen to arch down membrane. install new flashing metals install final layer granulad bitument torch down -units 1001-1015 | $20,000 |
| Aug 1, 2022 | Completed final sign-off Aug 2022 | 1086 Golden Gate Av | Quality Sf Roofing | remove complete asphaltgravel remove complete fleshing metals. prepare for new installation bitumen to arch down membrane. install new flashing metals install final layer granulad bitument torch down -units 1010-1030Details
remove complete asphaltgravel remove complete fleshing metals. prepare for new installation bitumen to arch down membrane. install new flashing metals install final layer granulad bitument torch down -units 1010-1030 | $20,000 |
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 1139 Turk St | D.F.P.F Corp Dba Fine Line Construction | revision to pa #201804105922. move frame locations.Details
revision to pa #201804105922. move frame locations. | |
| Oct 10, 2018 | Completed final sign-off Jan 2019 | 1030 Golden Gate Av | D.F.P.F Corp Dba Fine Line Construction | revision to pa #201804105921. move frame locations.Details
revision to pa #201804105921. move frame locations. | |
| Apr 10, 2018 | Completed final sign-off Jan 2019 | 1139 Turk St | to comply with #201715451. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of (e) shear walls at 1st flr only. all work for lateral force resistance. no new vertical load carrying elements includedDetails
to comply with #201715451. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of (e) shear walls at 1st flr only. all work for lateral force resistance. no new vertical load carrying elements included | $300,000 | |
| Apr 10, 2018 | Completed final sign-off Jan 2019 | 1030 Golden Gate Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of (e) shear walls at 1st flr only. all work for lateral force resistance. no new vertical load carrying elements includedDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add steel moment frames and stregthending of (e) shear walls at 1st flr only. all work for lateral force resistance. no new vertical load carrying elements included | $300,000 | |
| Jun 2, 2008 | Completed final sign-off Sep 2008 | 1035 Laguna St | Zenith General Contractors Corp | work @ apt# a only. drywall, electrical, insulator, install cabinets, windows, doors, siding, plumbing. drywall living room, hall, bedroom, new cabinets in kitchen & bathroom. replace bedroom windows & living room sliding door in kind. replace front shingles in kind. replace front security gate inDetails
work @ apt# a only. drywall, electrical, insulator, install cabinets, windows, doors, siding, plumbing. drywall living room, hall, bedroom, new cabinets in kitchen & bathroom. replace bedroom windows & living room sliding door in kind. replace front shingles in kind. replace front security gate in | $50,000 |
| Aug 1, 2003 | Never finaled issued Aug 2003, no final | 1135 Turk St | sidewalkDetails
sidewalk | ||
| May 3, 2002 | Completed final sign-off Jul 2002 | 1086 Golden Gate Av | addition of kitchen in community center install electric stove,double sink,vntless hood fan, bath/rmDetails
addition of kitchen in community center install electric stove,double sink,vntless hood fan, bath/rm | $10,000 | |
| Jan 17, 2002 | Completed final sign-off May 2002 | 1160 Buchanan St | bathroom cabinet/kitchen counterDetails
bathroom cabinet/kitchen counter | $2,000 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1135 Turk St | kitchen counter/ bathroom cabinetDetails
kitchen counter/ bathroom cabinet | $2,000 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1131 Turk St | kitchen cabinet/bathroom cabinetDetails
kitchen cabinet/bathroom cabinet | $2,000 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1191 Turk St | kitchen cabinet/bath room counterDetails
kitchen cabinet/bath room counter | $2,000 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1150 Buchanan St | kitchen counter/bathroom cabinet doorsDetails
kitchen counter/bathroom cabinet doors | $600 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1142 Buchanan St | kitchen cabinet/bathroom cabinetDetails
kitchen cabinet/bathroom cabinet | $1,300 | |
| Jan 16, 2002 | Completed final sign-off Jul 2002 | 1005 Laguna St | kitchen counter/bathroom counter/cabinetDetails
kitchen counter/bathroom counter/cabinet | $2,000 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1156 Buchanan St | kitchen counterDetails
kitchen counter | $2,000 | |
| Jan 16, 2002 | Completed final sign-off Jul 2002 | 1139 Turk St | bathroom cabinetDetails
bathroom cabinet | $800 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1123 Turk St | kitchen cabinet/bathroom counterDetails
kitchen cabinet/bathroom counter | $2,000 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1146 Buchanan St | kitchen cabinet/ bathroom cabinetDetails
kitchen cabinet/ bathroom cabinet | $2,000 | |
| Jan 16, 2002 | Completed final sign-off May 2002 | 1140 Buchanan St | kitchen counter/refish cabinetDetails
kitchen counter/refish cabinet | $600 | |
| Dec 10, 2001 | Completed final sign-off Jan 2002 | 1042 Golden Gate Av | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $31,000 |
| Dec 10, 2001 | Completed final sign-off Sep 2002 | 1005 Laguna St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $31,000 |
| Dec 10, 2001 | Completed final sign-off Sep 2002 | 1107 Turk St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $31,000 |
| Dec 10, 2001 | Completed final sign-off Feb 2002 | 1191 Turk St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $31,000 |
| Dec 10, 2001 | Completed final sign-off Sep 2002 | 1018 Golden Gate Av | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $31,000 |
| Dec 10, 2001 | Expired or cancelled expired Jan 2003 | 1140 Golden Gate Av | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $31,000 |
| Dec 10, 2001 | Completed final sign-off Sep 2002 | 1045 Laguna St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $31,000 |
| Dec 10, 2001 | Completed final sign-off Mar 2002 | 1086 Golden Gate Av | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $31,000 |
| Dec 5, 2001 | Completed final sign-off Mar 2002 | 1090 Golden Gate Av | replace bathroom counter unit m refinish kitchen cabinets replace counterDetails
replace bathroom counter unit m refinish kitchen cabinets replace counter | $2,800 | |
| Dec 5, 2001 | Completed final sign-off Mar 2002 | 1090 Golden Gate Av | replace bathroom counter unit and replace kitchen counterDetails
replace bathroom counter unit and replace kitchen counter | $2,800 | |
| Nov 20, 2001 | Completed final sign-off Mar 2002 | 1119 Turk St | replace all kitchen cabinets, no structural work.Details
replace all kitchen cabinets, no structural work. | $2,000 | |
| Nov 13, 2001 | Completed final sign-off Mar 2002 | 1060 Golden Gate Av | replace kitchen counterDetails
replace kitchen counter | $700 | |
| Nov 13, 2001 | Completed final sign-off Mar 2002 | 1046 Golden Gate Av | replace kitchen cabinetsDetails
replace kitchen cabinets | $1,900 | |
| Nov 9, 2001 | Expired or cancelled expired Jan 2003 | 1042 Golden Gate Av | replace kitchen counterDetails
replace kitchen counter | $700 | |
| Nov 28, 2000 | Completed final sign-off Jan 2001 | 1181 Turk St | Atlas Construction | remove wooden trash enclosure walls, install new trash enclosures w/concrete slab floors & 6 in blckDetails
remove wooden trash enclosure walls, install new trash enclosures w/concrete slab floors & 6 in blck | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.