Victor Tam
- License
- M39048
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M39048 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Sfdpw- Bureau Of Engineering
- Based in
- San Francisco
- On San Francisco permits
- Nov 2021 to Nov 2021
1 permit since 2000 (engineer on 1 permit): 1 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Glennis Briggs, Jennifer Devlin
- Engineers
- Daniel Manhelm, Joon Suk Choi, Joseph Maffei
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 4, 2021 | Completed final sign-off Apr 2025 | 190 09th St | upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system.Details
upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system. | $5,768,600 |