Frederic Simmons Iii

License
C33515
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Sfdpw
Based in
San Frnacisco
On San Francisco permits
Nov 2017 to Sep 2021

7 permits since 2000 (architect on 7 permits): 4 completed, 3 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
S J Amoroso Construction, Svala Construction Inc
Architects
Mei Mei Chan Mei Architects-Interiors (2)
Engineers
Angelito E. Magbitang, Eric L. Bura, Farshad Khodayari, Kin Lau, Mennor Chan

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 22, 2021Never finaled
issued Nov 2022, no final
375 Laguna Honda BlS J Amoroso Constructionpriority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door frames
Details
Permit
202109228981
Permit issued
Nov 16, 2022

priority. m&o wings: selective demo of int. non-struc elements on lvl3 & spine btwn. full demo of int non-struc elements on lvl4-8 & spine btwn. replace & repair windows. n access-compliant parking spaces, loading zone, canopy, entrance at east surface parking lot. n framed walls, doors, door frames

Open the permit page

$33,250,000
Jan 6, 2020Completed
final sign-off Jul 2021
190 09th Strevision to pa#2019-0311-4929: consisting of replacement of 15 additional aluminum windows on 1/f,2/f, 3f on washburn street between adj building (170 9th st) and closets pilaster to adj. build. original permit valuation remains unchanged.paint (e) window frames to remain to match (n).
Details
Permit
202001061257
Permit issued
Jan 16, 2020
Final sign-off
Jul 8, 2021

revision to pa#2019-0311-4929: consisting of replacement of 15 additional aluminum windows on 1/f,2/f, 3f on washburn street between adj building (170 9th st) and closets pilaster to adj. build. original permit valuation remains unchanged.paint (e) window frames to remain to match (n).

Open the permit page

Sep 23, 2019Never finaled
filed Sep 2019, never issued
750 Phelps Stpriority processing for sfpuc/dpw mod project, erect a two stories type ii-b construction maintenance shops building
Details
Permit
201909232325

priority processing for sfpuc/dpw mod project, erect a two stories type ii-b construction maintenance shops building

Open the permit page

$25,000,000
Sep 23, 2019Never finaled
filed Sep 2019, never issued
750 Phelps Stpriority processing for sfpuc/dpw mod project, erect a one story type v construction maintenance shops building
Details
Permit
201909232334

priority processing for sfpuc/dpw mod project, erect a one story type v construction maintenance shops building

Open the permit page

$14,000,000
Jun 19, 2019Completed
final sign-off Mar 2022
2868 Mission StSvala Construction Incpriority project - voluntary interior toilet rooms, barrier removal and finishes replacement, minor barrier removal and finishes replacement, passenger elevator modernization, freight elevator replacement with service elevator. provide bottle filling station.
Details
Permit
201906193851
Permit issued
Nov 18, 2019
Final sign-off
Mar 14, 2022

priority project - voluntary interior toilet rooms, barrier removal and finishes replacement, minor barrier removal and finishes replacement, passenger elevator modernization, freight elevator replacement with service elevator. provide bottle filling station.

Open the permit page

$950,000
Mar 11, 2019Completed
final sign-off Jul 2021
190 09th Streplace all (e) aluminum windows on the 2nd and 3rd floors except for the five banks of windows along washburn st between adjacent building (170 9th st) and closet pilaster to adjacent building
Details
Permit
201903114929
Permit issued
Aug 6, 2019
Final sign-off
Jul 8, 2021

replace all (e) aluminum windows on the 2nd and 3rd floors except for the five banks of windows along washburn st between adjacent building (170 9th st) and closet pilaster to adjacent building

Open the permit page

$1,200,000
Nov 9, 2017Completed
final sign-off Sep 2020
301 Eddy Stprovide new cooling system @select(e)rooms, replace ac units, condensing units,(e)cosensors to remain and select exhaust fans; replace (e) generator, fuel pump, belly tank, and associated appurtenances; replace (e) concrete drive ramp & overhead coiling door. provide new supply fan & elec sub-panel,
Details
Permit
201711093617
Permit issued
Jan 24, 2018
Final sign-off
Sep 25, 2020

provide new cooling system @select(e)rooms, replace ac units, condensing units,(e)cosensors to remain and select exhaust fans; replace (e) generator, fuel pump, belly tank, and associated appurtenances; replace (e) concrete drive ramp & overhead coiling door. provide new supply fan & elec sub-panel,

Open the permit page

$700,000