Douglas Robertson
- Listed as
- engineer
- Firm
- Daedalus Structural Eng
- Based in
- Saratoga
- On San Francisco permits
- Jun 2009 to Sep 2025
19 permits since 2000 (engineer on 19 permits): 11 completed, 1 in progress, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2025 | In progress filed Sep 2025, not yet issued | 824 Shotwell St | to erect 1 story, no basement, type v-b, adu on back of the house.Details
to erect 1 story, no basement, type v-b, adu on back of the house. | $178,000 | |
| Jun 22, 2021 | Completed final sign-off Jul 2021 | 206 Edgewood Av | Hunter Dale Builders Inc. | submittal of revised structrual details in respose to site conditions. ref bpa#201909161761Details
submittal of revised structrual details in respose to site conditions. ref bpa#201909161761 | |
| Dec 7, 2020 | Expired or cancelled expired Aug 2023 | 2312 Pacific Av | Dlc Construction | int. remodel: replace kit. cabinets, appliances, all bath finishes. relocate master bath and closet, replacing 1 (e) staircase w/ (n) set of stairs & railing. (n) finish throughout. replacing (e) lighting w/ (n) led lights, outlets & switching to comply w/ codes. (n) waterproofing on 2 ext. decks.Details
int. remodel: replace kit. cabinets, appliances, all bath finishes. relocate master bath and closet, replacing 1 (e) staircase w/ (n) set of stairs & railing. (n) finish throughout. replacing (e) lighting w/ (n) led lights, outlets & switching to comply w/ codes. (n) waterproofing on 2 ext. decks. | $100,000 |
| Mar 3, 2020 | Never finaled filed Mar 2020, never issued | 160 Anderson St | lowering ground fl level by 27 inches & replace (e) slab & foundation w/(n) reinforced concrete construction. waterproofing membran assembly, sub-grade drainage system & associated sub-slab bldg plumbing modifications. work also includes new rear landscape retaining walls, storm water drainage.Details
lowering ground fl level by 27 inches & replace (e) slab & foundation w/(n) reinforced concrete construction. waterproofing membran assembly, sub-grade drainage system & associated sub-slab bldg plumbing modifications. work also includes new rear landscape retaining walls, storm water drainage. | $266,000 | |
| Oct 10, 2019 | Completed final sign-off Jul 2021 | 206 Edgewood Av | Hunter Dale Builders Inc. | voluntary seismic strengthening.Details
voluntary seismic strengthening. | $75,000 |
| Nov 13, 2017 | Completed final sign-off Dec 2019 | 714 Kansas St | Brennan Strong Hold Construction Inc | revision to pa #201507232246/s1 - revision to foundation for rebar & retaining walls based on conditions observed at the site.Details
revision to pa #201507232246/s1 - revision to foundation for rebar & retaining walls based on conditions observed at the site. | |
| Aug 9, 2017 | Expired or cancelled expired Nov 2021 | 3636 21st St | Blair Burke General Contractors Inc | shoring plan related to bpa# 2015-0115-5832 s1.Details
shoring plan related to bpa# 2015-0115-5832 s1. | $30,000 |
| Mar 13, 2017 | Completed final sign-off Jun 2019 | 1770 Noe St | Hing Wah Construction Inc | adu per ord #162-16. proposed accessory dwelling unit added to a portion of the (e) basement area. propose foundation improvements to accomodate the adu were approved under a separate permit. the proposed adu is a (1)bedroom unit, including kitchen & a living space & patio.Details
adu per ord #162-16. proposed accessory dwelling unit added to a portion of the (e) basement area. propose foundation improvements to accomodate the adu were approved under a separate permit. the proposed adu is a (1)bedroom unit, including kitchen & a living space & patio. | $75,000 |
| Dec 28, 2016 | Completed final sign-off Mar 2019 | 95 Laidley St | Hing Wah Construction Inc | upgrade extg concrete foundation. partial replacement of bldg footings and slab at extg basement and porch. new beams and posts at basement & 1st floor.Details
upgrade extg concrete foundation. partial replacement of bldg footings and slab at extg basement and porch. new beams and posts at basement & 1st floor. | $80,000 |
| Jul 20, 2016 | Completed final sign-off Sep 2016 | 1 Bernice St | Blair Burke General Contractors Inc | structural revisions for pa 2016-0208-9063. n/a ordinance #155-13Details
structural revisions for pa 2016-0208-9063. n/a ordinance #155-13 | $2,000 |
| Oct 21, 2015 | Never finaled issued Jul 2018, no final | 1286 Sanchez St | Brennan Strong Hold Construction Inc | two-story addition with required structural upgrades. roof deck above 3rd story addition. interior improvement for bedrooms & baths @ 2nd floor. 3 bedrooms & 2 baths.Details
two-story addition with required structural upgrades. roof deck above 3rd story addition. interior improvement for bedrooms & baths @ 2nd floor. 3 bedrooms & 2 baths. | $250,000 |
| Sep 2, 2015 | Completed final sign-off Jan 2018 | 444 30th St | Blair Burke General Contractors Inc | new rear yard deck.Details
new rear yard deck. | $50,000 |
| Nov 18, 2014 | Completed final sign-off Sep 2015 | 2714 Pacific Av | Capomastro Group:Acalifornia Corp. | expand e rear yard deck to side pl, remodel e bath, kitchen, new wood doors at rear and replace with metal window side and add skylight. interior remodel for plans, paint front and rear of house.Details
expand e rear yard deck to side pl, remodel e bath, kitchen, new wood doors at rear and replace with metal window side and add skylight. interior remodel for plans, paint front and rear of house. | $75,000 |
| Sep 8, 2014 | Expired or cancelled expired Dec 2017 | 444 30th St | Blair Burke General Contractors Inc | revision to appl #2014.0326.1745: new retaining wall & structural mat slab at rear first floor. new wood deck over existing patio at rear yard at grade (2 ft).Details
revision to appl #2014.0326.1745: new retaining wall & structural mat slab at rear first floor. new wood deck over existing patio at rear yard at grade (2 ft). | $18,000 |
| May 12, 2014 | Completed final sign-off Jul 2015 | 1621 Powell St | Dennis Sleighter Constr | revision to 201304235175. revision to structural at front of building. n/a ordinance #155-13.Details
revision to 201304235175. revision to structural at front of building. n/a ordinance #155-13. | $20,000 |
| May 17, 2013 | Never finaled issued May 2013, no final | 1112 De Haro St | Ace Drilling & Excavation | structural revisions for permit #2011-0718-0425 for field conditions.Details
structural revisions for permit #2011-0718-0425 for field conditions. | $7,500 |
| Apr 23, 2013 | Completed final sign-off Jul 2015 | 1621 Powell St | Kevin Lehane Construction | renovate extg 2 story 2 unit residence. work includes remove interior walls and remodel per plans. upgrade structural as required. remodel 2 kitchens,2 baths, add one bath, replace all windows. small in fill deck at rear and new roof deck. revision to app#201302281173.Details
renovate extg 2 story 2 unit residence. work includes remove interior walls and remodel per plans. upgrade structural as required. remodel 2 kitchens,2 baths, add one bath, replace all windows. small in fill deck at rear and new roof deck. revision to app#201302281173. | $195,000 |
| Jun 5, 2009 | Completed final sign-off Sep 2011 | 689 Hayes St | Clw Builders Inc | to erect a one story playground club house.Details
to erect a one story playground club house. | $2,000,000 |
| Jun 5, 2009 | Never finaled issued Jan 2010, no final | 689 Hayes St | Clw Builders Inc | demolition of 1 story, type 5, clubhouse.Details
demolition of 1 story, type 5, clubhouse. | $25,000 |