Permit GraphShortlistSan Francisco building permits since 2000

Ron Breckenridge Entrprses/Rb Petroleum

Contractor license
787836
State license record
Based in
San Francisco
On San Francisco permits
Dec 2007 to Aug 2021
Last 24 months
0 permits filed

22 permits since 2000: 16 completed, 6 never finaled.

Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Aug 23, 2021Never finaled
issued Aug 2021, no final
551 26th Avreplace fuel system monitoring panel. replace 3 sensors, replace 1 liquid level probe, no replacement of any other components.
Details
Permit
202108236925
Permit issued
Aug 23, 2021

replace fuel system monitoring panel. replace 3 sensors, replace 1 liquid level probe, no replacement of any other components.

Open the permit page

$7,000
Mar 10, 2016Never finaled
issued Apr 2016, no final
375 Laguna Honda Blfuel supply line replacement in kind for back up generator. n/a for maher
Details
Permit
201603101757
Permit issued
Apr 14, 2016

fuel supply line replacement in kind for back up generator. n/a for maher

Open the permit page

$8,000
Apr 8, 2015Never finaled
issued Apr 2015, no final
950 Bryant Stunderground fuel storage tank repair (leaking) excavate tank, enter tank, pressurize annular. locate leak and repair. maher - not req'd
Details
Permit
201504083109
Permit issued
Apr 10, 2015

underground fuel storage tank repair (leaking) excavate tank, enter tank, pressurize annular. locate leak and repair. maher - not req'd

Open the permit page

$10,000
Mar 5, 2014Never finaled
issued Mar 2014, no final
530 Sansome Stinstall new secondary containment pipe over existing fuel supply piping. no concrete removal required. all work to be done in existing pipe route.
Details
Permit
201403050006
Permit issued
Mar 7, 2014

install new secondary containment pipe over existing fuel supply piping. no concrete removal required. all work to be done in existing pipe route.

Open the permit page

$1,500
Aug 9, 2013Completed
final sign-off Jun 2014
2901 Bryant Stnew double-walled ul listed fuel pipes to be sleeved within existing 4" diameter underground pipes to existing fuel dispensers from existing underground storage tanks. no concrete work required.
Details
Permit
201308094014
Permit issued
Aug 13, 2013
Final sign-off
Jun 4, 2014

new double-walled ul listed fuel pipes to be sleeved within existing 4" diameter underground pipes to existing fuel dispensers from existing underground storage tanks. no concrete work required.

Open the permit page

$5,000
Mar 16, 2012Never finaled
issued Mar 2012, no final
100 Martin Luther King Drreplace fuel piping between dispensing pump & fuel storage tank (in-kind) no concrete cutting required.
Details
Permit
201203166263
Permit issued
Mar 20, 2012

replace fuel piping between dispensing pump & fuel storage tank (in-kind) no concrete cutting required.

Open the permit page

$3,000
Jan 17, 2012Completed
final sign-off Feb 2013
800 Ulloa Streplace 2-4'0 sections of damaged fuel piping at under ground fuel storage tanks.
Details
Permit
201201172380
Permit issued
Jan 20, 2012
Final sign-off
Feb 22, 2013

replace 2-4'0 sections of damaged fuel piping at under ground fuel storage tanks.

Open the permit page

$1,000
Jan 11, 2012Completed
final sign-off Feb 2012
1000 Ocean Avreplace spill bucket and fill tank. no new piping
Details
Permit
201201112102
Permit issued
Jan 13, 2012
Final sign-off
Feb 8, 2012

replace spill bucket and fill tank. no new piping

Open the permit page

$1,500
Jul 8, 2011Completed
final sign-off Oct 2011
1935 32nd Avinstall/replace gas pump fuel supply piping to 9e) underground tank.
Details
Permit
201107089776
Permit issued
Jul 15, 2011
Final sign-off
Oct 21, 2011

install/replace gas pump fuel supply piping to 9e) underground tank.

Open the permit page

$1,500
May 18, 2010Completed
final sign-off May 2010
601 Duboce Avreplace damaged xp suction piping (burried in ground approx 18") 20'-0" length to fuel tank-between office bldg. & patient care facility near duboce ave.
Details
Permit
201005182724
Permit issued
May 18, 2010
Final sign-off
May 27, 2010

replace damaged xp suction piping (burried in ground approx 18") 20'-0" length to fuel tank-between office bldg. & patient care facility near duboce ave.

Open the permit page

$2,500
Nov 20, 2009Completed
final sign-off Jan 2010
2601 Lombard Stvalero gas station. install clean air seperator tank, concrete 4' x 8' x 8" deep mounting pad, and 4 bollards.
Details
Permit
200911201853
Permit issued
Dec 10, 2009
Final sign-off
Jan 22, 2010

valero gas station. install clean air seperator tank, concrete 4' x 8' x 8" deep mounting pad, and 4 bollards.

Open the permit page

$4,500
Sep 18, 2009Completed
final sign-off Dec 2009
701 Portola Drinstall healy air separation tank with 14ga enclosure at rear/southeast side of facility. sffd permit req - vapor recovery.
Details
Permit
200909187221
Permit issued
Oct 6, 2009
Final sign-off
Dec 18, 2009

install healy air separation tank with 14ga enclosure at rear/southeast side of facility. sffd permit req - vapor recovery.

Open the permit page

$10,000
Aug 13, 2009Never finaled
issued Aug 2009, no final
375 Laguna Honda Blinstallation of air separation tank & concrete pad at existing re-fueling station.
Details
Permit
200908134810
Permit issued
Aug 14, 2009

installation of air separation tank & concrete pad at existing re-fueling station.

Open the permit page

$10,000
Mar 4, 2009Completed
final sign-off Jul 2009
7355 Geary Blinstallation of veeder root carbon canister for bay area air quality management district compliance, phase 2 evr
Details
Permit
200903043313
Permit issued
Mar 5, 2009
Final sign-off
Jul 31, 2009

installation of veeder root carbon canister for bay area air quality management district compliance, phase 2 evr

Open the permit page

$15,000
Mar 4, 2009Completed
final sign-off Nov 2009
2990 San Bruno Avinstallation of veeder root carbon canister for bay area air quality management district compliance, phase 2 evr
Details
Permit
200903043316
Permit issued
Mar 5, 2009
Final sign-off
Nov 5, 2009

installation of veeder root carbon canister for bay area air quality management district compliance, phase 2 evr

Open the permit page

$15,000
Mar 4, 2009Completed
final sign-off Jul 2009
376 Castro Stinstallation of veeder root carbon canister for bay area air quality management district compliance
Details
Permit
200903043311
Permit issued
Mar 17, 2009
Final sign-off
Jul 29, 2009

installation of veeder root carbon canister for bay area air quality management district compliance

Open the permit page

$15,000
Jan 27, 2009Completed
final sign-off Aug 2009
598 Portola Drinstallation of baaqmd phase 2 veeder root carbon canister. attached at west side of bldg. venting system for underground tanks.
Details
Permit
200901270913
Permit issued
Jan 28, 2009
Final sign-off
Aug 18, 2009

installation of baaqmd phase 2 veeder root carbon canister. attached at west side of bldg. venting system for underground tanks.

Open the permit page

$10,000
Jan 20, 2009Completed
final sign-off Oct 2009
2901 Bryant Stinstallation veeder root carbon canister & fire resistant enclosure.
Details
Permit
200901200505
Permit issued
Jan 28, 2009
Final sign-off
Oct 1, 2009

installation veeder root carbon canister & fire resistant enclosure.

Open the permit page

$10,000
Jan 20, 2009Completed
final sign-off Jul 2009
4135 California Stinstallation of healy clean ari seperator per baaqmd phase ii evr compliance.
Details
Permit
200901200499
Permit issued
Jan 28, 2009
Final sign-off
Jul 30, 2009

installation of healy clean ari seperator per baaqmd phase ii evr compliance.

Open the permit page

$10,000
Jan 20, 2009Completed
final sign-off Sep 2009
1799 Ocean Avinstallation of veeder root carbon canister, for baarmd phase v evr compliance on existing vent pipes adjacent to existing c-store/auto shop.
Details
Permit
200901200486
Permit issued
Jan 20, 2009
Final sign-off
Sep 1, 2009

installation of veeder root carbon canister, for baarmd phase v evr compliance on existing vent pipes adjacent to existing c-store/auto shop.

Open the permit page

$10,000
Mar 28, 2008Completed
final sign-off Apr 2008
2099 San Jose Avchange construction of vapor recovery enclosure from stainless steel to galvanized steel.
Details
Permit
200803288211
Permit issued
Mar 28, 2008
Final sign-off
Apr 23, 2008

change construction of vapor recovery enclosure from stainless steel to galvanized steel.

Open the permit page

Dec 28, 2007Completed
final sign-off Apr 2008
2099 San Jose Avinstallation of healy clean air seperator for bay area air quality management district phase 2 evr complaiance.
Details
Permit
200712281542
Permit issued
Dec 31, 2007
Final sign-off
Apr 23, 2008

installation of healy clean air seperator for bay area air quality management district phase 2 evr complaiance.

Open the permit page

$15,000