Fisher Design + Build
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Apr 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2017 | Completed final sign-off Jul 2017 | 300 Bowling Green Dr | remove existing windows and screens and set aside. remove stucco. repair damaged studs and sill plate. install windows and screens, new stucco, prime and paintDetails
remove existing windows and screens and set aside. remove stucco. repair damaged studs and sill plate. install windows and screens, new stucco, prime and paint | $100,000 |
| Oct 6, 2016 | Completed final sign-off Jan 2018 | 3939 Cesar Chavez St | remodel extg kitchen including, removal of extg powder room and bearing wall between kitchen and dining. add new powder room in extg closet. remodel 3rd floor bathroom in kind.Details
remodel extg kitchen including, removal of extg powder room and bearing wall between kitchen and dining. add new powder room in extg closet. remodel 3rd floor bathroom in kind. | $50,000 |