Back to kitchen remodel contractors
Fisher Design + Build
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Apr 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 125 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2016 | Completed final sign-off Jan 2018 | 3939 Cesar Chavez St | remodel extg kitchen including, removal of extg powder room and bearing wall between kitchen and dining. add new powder room in extg closet. remodel 3rd floor bathroom in kind.Details
remodel extg kitchen including, removal of extg powder room and bearing wall between kitchen and dining. add new powder room in extg closet. remodel 3rd floor bathroom in kind. | $50,000 |