Point One Electrical Systems Inc
- Based in
- Livermore
- On San Francisco permits
- Sep 2010 to Feb 2026
- Last 24 months
- 2 permits filed
9 permits since 2000: 4 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | In progress filed Feb 2026, not yet issued | 600 Portway Pg | puc proj-26-0628: manual fire alarm systemDetails
puc proj-26-0628: manual fire alarm system | $25,000 |
| Jan 9, 2026 | In progress issued Jan 2026 | 2620 Jones St | install duct detectors per machanical rooftop unit replacement. ref permit 202510237973.Details
install duct detectors per machanical rooftop unit replacement. ref permit 202510237973. | $11,214 |
| Jul 22, 2024 | In progress issued Jul 2024 | 991 Lake Merced Bl | as built for pa # 2024-0129-4822. added various notes to all pagesDetails
as built for pa # 2024-0129-4822. added various notes to all pages | |
| May 16, 2024 | Completed final sign-off Nov 2024 | 3570 21st St | fire sprinkler monitoring system.Details
fire sprinkler monitoring system. | $21,000 |
| Jan 29, 2024 | In progress issued Apr 2024 | 991 Lake Merced Bl | remove and replace est3 to edwards est4. existing fire alarm devices to remain and be incorporated into system as indicated on drawings. the system shall include the following: new fire alarm control unit and network connectivity to (e) utility bldg.Details
remove and replace est3 to edwards est4. existing fire alarm devices to remain and be incorporated into system as indicated on drawings. the system shall include the following: new fire alarm control unit and network connectivity to (e) utility bldg. | $30,000 |
| Apr 5, 2019 | Completed final sign-off Oct 2020 | 2620 Jones St | (n) fire alarm replacement system of entire bldg. replace (e) devices at hotel rooms. install devices at main sales & lobby areas. **maher n/a**Details
(n) fire alarm replacement system of entire bldg. replace (e) devices at hotel rooms. install devices at main sales & lobby areas. **maher n/a** | $300,000 |
| Oct 22, 2018 | Completed final sign-off Oct 2020 | 120 Chain Of Lakes Dr | design and install (2) facu's for sprinkler monitoring of 2 pump roomsDetails
design and install (2) facu's for sprinkler monitoring of 2 pump rooms | $58,000 |
| Apr 17, 2012 | Expired or cancelled expired Feb 2018 | 991 Lake Merced Bl | revision to pa# 2010/09/22/1370. install sprinkler monitoring system with devices to communicate through fiber optics back to main facp in (n) pump bldg.Details
revision to pa# 2010/09/22/1370. install sprinkler monitoring system with devices to communicate through fiber optics back to main facp in (n) pump bldg. | $20,000 |
| Sep 22, 2010 | Completed final sign-off Jun 2012 | 991 Lake Merced Bl | fire alarm installation furnish and install 1-facp, monitor pre-action, fire sprinkler, and fuel leak systems (furnished by others). 13 devices installed. provide and install surge protection connect devices to main facp and program for operation.Details
fire alarm installation furnish and install 1-facp, monitor pre-action, fire sprinkler, and fuel leak systems (furnished by others). 13 devices installed. provide and install surge protection connect devices to main facp and program for operation. | $40,000 |