Jose Carlos Faz
- Listed as
- engineer
- Firm
- J5 Infrastructure
- Based in
- Irvine
- On San Francisco permits
- Jun 2018 to Feb 2024
33 permits since 2000 (engineer on 33 permits): 30 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 29, 2024 | Completed final sign-off Mar 2024 | 758 Divisadero St | at&t: modification of an (e) wireless facility. remove and replace (3) (e) antennas. remove (9) rru's. install (3) new 4415 b25 rrus. install (1) new rectifier in (e) dcpp. install new eme stripping and barricades on roof.Details
at&t: modification of an (e) wireless facility. remove and replace (3) (e) antennas. remove (9) rru's. install (3) new 4415 b25 rrus. install (1) new rectifier in (e) dcpp. install new eme stripping and barricades on roof. | $45,000 | |
| Jan 18, 2024 | Completed final sign-off Apr 2024 | 755 Stanyan St | Electric Tech Construction Inc | at&t: mod of an (e) unmanned wireless facility pursuant to 6409. remove and replace 3 antennas. relocate 3 rrus 4426b66 on new back-to-back mounts. relocate 3 rrus 4415b30 on new back-to-back mounts. install 3 new rru back-to-back mount. install 1 new rectifier within (e) dcpp.Details
at&t: mod of an (e) unmanned wireless facility pursuant to 6409. remove and replace 3 antennas. relocate 3 rrus 4426b66 on new back-to-back mounts. relocate 3 rrus 4415b30 on new back-to-back mounts. install 3 new rru back-to-back mount. install 1 new rectifier within (e) dcpp. | $45,000 |
| Jan 4, 2024 | Completed final sign-off Nov 2024 | 450 Harrison St | Metropolitan Electrical Construction | at&t modification of unmanned telecom facility consisting of the following: r&r (6) antenna; relocate (1) antenna; remove (3) relocate & install (8) rrus; 3 pipe masts; 3 df0; frp 8'screen for sector b&c antennas; (n) rf safety signs; remove (1) cabinet; r&r (1) power plant;install (12) rectifiers;Details
at&t modification of unmanned telecom facility consisting of the following: r&r (6) antenna; relocate (1) antenna; remove (3) relocate & install (8) rrus; 3 pipe masts; 3 df0; frp 8'screen for sector b&c antennas; (n) rf safety signs; remove (1) cabinet; r&r (1) power plant;install (12) rectifiers; | $75,000 |
| Aug 29, 2023 | Completed final sign-off Aug 2024 | 3698 California St | Summit Comm Inc | att cell equiptment demo on roof top. after we complete the demo on the roof top,another contractor is performing a demo on the entire building.Details
att cell equiptment demo on roof top. after we complete the demo on the roof top,another contractor is performing a demo on the entire building. | $20,000 |
| Aug 23, 2023 | Completed final sign-off Sep 2023 | 2601 Mission St | Metropolitan Electrical Construction | revision to bpa# 202206095936: -at&t- install (2) new frp antenna cable skirts per section (6). see revised sheet s1&s2Details
revision to bpa# 202206095936: -at&t- install (2) new frp antenna cable skirts per section (6). see revised sheet s1&s2 | |
| May 11, 2023 | Completed final sign-off Dec 2023 | 1701 Haight St | Diablo Telecom & Construction Inc | at&t mobility of a unmanned telecom facility consisting of rr 12-panel antenanas, remove 8-and install 4-rru's, 4-flat hss6x4x1/4, rf safety signs, barricades, stripping on roof, install 4-190ah acid lead batteries in extg cabinet, 2-new rectifiers in extg dcpp cabinetDetails
at&t mobility of a unmanned telecom facility consisting of rr 12-panel antenanas, remove 8-and install 4-rru's, 4-flat hss6x4x1/4, rf safety signs, barricades, stripping on roof, install 4-190ah acid lead batteries in extg cabinet, 2-new rectifiers in extg dcpp cabinet | $45,000 |
| May 4, 2023 | Completed final sign-off Aug 2023 | 539 Bryant St | Metropolitan Electrical Construction | revision to 202203079346 (at&t: modification to an unmanned telecom facitity). revised mounting details.Details
revision to 202203079346 (at&t: modification to an unmanned telecom facitity). revised mounting details. | $15,000 |
| Apr 26, 2023 | Completed final sign-off Oct 2023 | 501 Laguna St | Electric Tech Construction Inc | at&t unmanned telecom facmility modification consists. r/r (2) existing antennas; r/r (e) 2 rrus; remove 2 diplexers; install rf safetry signs, barricades & striping on roof; remove 24 (e) batteries & install 20 new lead acid batteries in (e) cabinet-power plant; install 1 baseband & remove 1 duw30.Details
at&t unmanned telecom facmility modification consists. r/r (2) existing antennas; r/r (e) 2 rrus; remove 2 diplexers; install rf safetry signs, barricades & striping on roof; remove 24 (e) batteries & install 20 new lead acid batteries in (e) cabinet-power plant; install 1 baseband & remove 1 duw30. | $35,000 |
| Nov 17, 2022 | Completed final sign-off Dec 2022 | 678 Portola Dr | High Band Construction Inc | revision to pa# 2022-0310-9643: change of scope to remove not install proposed cabinet in detail 3/a-2 and detail 2/a-5. reduction of work. remove cabinet & special inspection requirements.Details
revision to pa# 2022-0310-9643: change of scope to remove not install proposed cabinet in detail 3/a-2 and detail 2/a-5. reduction of work. remove cabinet & special inspection requirements. | |
| Sep 15, 2022 | Completed final sign-off Dec 2023 | 1801 Broadway | Diablo Telecom & Construction Inc | modification of att unmanned tlecome facility consisting of relocate 2 e antennas, 2 air antennas behind new ffp screen,relocate 3 rrus, install new rf safety signs, barricades, striping on rooftop.1 rectifier, 1 bbu, 1 40 a breaker withing e cabinets, unistrut /remove 8 155 ah batteries from e cabDetails
modification of att unmanned tlecome facility consisting of relocate 2 e antennas, 2 air antennas behind new ffp screen,relocate 3 rrus, install new rf safety signs, barricades, striping on rooftop.1 rectifier, 1 bbu, 1 40 a breaker withing e cabinets, unistrut /remove 8 155 ah batteries from e cab | $45,000 |
| Aug 18, 2022 | Completed final sign-off Jun 2025 | 185 Berry St | Metropolitan Electrical Construction | att modification of unmanned telelcom facility consising of remove 7 relcate 2 ex antennas, 7 new antenna behing e frp screen, paint to match, replace 4 rrus, install 2 twin diplexers, 2 surge suppressor,pwer trunks, rf safety signs/barricade/strip,1 purcell cab, 4 rectifier,4 new 190 ah batteriesDetails
att modification of unmanned telelcom facility consising of remove 7 relcate 2 ex antennas, 7 new antenna behing e frp screen, paint to match, replace 4 rrus, install 2 twin diplexers, 2 surge suppressor,pwer trunks, rf safety signs/barricade/strip,1 purcell cab, 4 rectifier,4 new 190 ah batteries | $85,000 |
| Jul 7, 2022 | Completed final sign-off Mar 2023 | 1250 Columbus Av | Electric Tech Construction Inc | at&t modification of an unmanned telecom facility consisting of r + r (6) antennas; antenna mounts sector a; remove (9) rrus; install new rf safety signs barricades strapping @ rooftop; remove (20) 155 ah batteries; (4) 160ah batteries; install (20) 190ah lead acid batteries in existing battery cabiDetails
at&t modification of an unmanned telecom facility consisting of r + r (6) antennas; antenna mounts sector a; remove (9) rrus; install new rf safety signs barricades strapping @ rooftop; remove (20) 155 ah batteries; (4) 160ah batteries; install (20) 190ah lead acid batteries in existing battery cabi | $85,000 |
| Jul 7, 2022 | Expired or cancelled withdrawn Dec 2024 | 602 The Embarcadero | at&t modification of an unmanned telecom facility consisting of r + r (6) antennas;install (3) dc( boxes; install (3) power trunks and (3) fiber trunks to (n) dc9's; install new rf safety signs + barricades on rooftop. install (2) rectifiers in (e) dcpp; install (1) string 185ah batteries in existinDetails
at&t modification of an unmanned telecom facility consisting of r + r (6) antennas;install (3) dc( boxes; install (3) power trunks and (3) fiber trunks to (n) dc9's; install new rf safety signs + barricades on rooftop. install (2) rectifiers in (e) dcpp; install (1) string 185ah batteries in existin | $75,000 | |
| Jun 30, 2022 | Completed final sign-off Apr 2023 | 400 Sutter St | Legacy Wireless Services Inc | at&t modif an unmanned telecom facility, remove/replace (1)panel antenna; add (3)new air antenna w/concealiment film. (2)new antenna pipe mast; remove (1)rbs2016 equip cabinet; install (1)new rectifier in existing dcpp; (1)new stackable battery unit for (8)new lead acid power safe sbs190 batteriesDetails
at&t modif an unmanned telecom facility, remove/replace (1)panel antenna; add (3)new air antenna w/concealiment film. (2)new antenna pipe mast; remove (1)rbs2016 equip cabinet; install (1)new rectifier in existing dcpp; (1)new stackable battery unit for (8)new lead acid power safe sbs190 batteries | $35,000 |
| Jun 23, 2022 | Completed final sign-off Apr 2023 | 100 Pine St | Invertice Inc, Metropolitan Electrical Construction | at&t cell site mod: r/r 4 antennas,remove 4 rru's,install new rf safety signs,striping.remove 1-5216,16-155ah batteries,12-160ah batteries,install 12 new 190ah lead acid batteries in (e) rack,8 new 190ah lead acide battieres in (e) power plant rack and 2 new rectifiers in (e) power plant rack.Details
at&t cell site mod: r/r 4 antennas,remove 4 rru's,install new rf safety signs,striping.remove 1-5216,16-155ah batteries,12-160ah batteries,install 12 new 190ah lead acid batteries in (e) rack,8 new 190ah lead acide battieres in (e) power plant rack and 2 new rectifiers in (e) power plant rack. | $65,000 |
| Jun 23, 2022 | Completed final sign-off Feb 2023 | 3110 Octavia St | Electric Tech Construction Inc | at&t cell site mod: r/r 5 antennas,install 4 dc9 boxes,1 power & 1 fiber trunks per secotr, new rf safety signs,baricades & stripping on rooftop, remove 24 (e) batteries and install 20 (n) 190ah batteries in (e) racks & power plant.install 2 rectifiers in(e) dcpp, 1 dc12-rm & 1 6648 bb in (e) rif.Details
at&t cell site mod: r/r 5 antennas,install 4 dc9 boxes,1 power & 1 fiber trunks per secotr, new rf safety signs,baricades & stripping on rooftop, remove 24 (e) batteries and install 20 (n) 190ah batteries in (e) racks & power plant.install 2 rectifiers in(e) dcpp, 1 dc12-rm & 1 6648 bb in (e) rif. | $75,000 |
| May 12, 2022 | Completed final sign-off Jan 2023 | 1400 Haight St | Electric Tech Construction Inc | at&t: r/r 12 antennas. remove 4 rrus. 8 (n) rrus. 4 rru mounts. r/r 6 frp bucking/cable covers. 3 (n) dc9 boxes. 3 #6 awg dc power trunks. remove 5216 baseband. 7 (n) rectifiers in (e) cab. 1 6630 & 1 6648 unit/mux. dc12 box on h-frame. 8 (n) 185ah batteries. (n) rf safety signs/barricades + strip.Details
at&t: r/r 12 antennas. remove 4 rrus. 8 (n) rrus. 4 rru mounts. r/r 6 frp bucking/cable covers. 3 (n) dc9 boxes. 3 #6 awg dc power trunks. remove 5216 baseband. 7 (n) rectifiers in (e) cab. 1 6630 & 1 6648 unit/mux. dc12 box on h-frame. 8 (n) 185ah batteries. (n) rf safety signs/barricades + strip. | $75,000 |
| May 4, 2022 | Completed final sign-off Dec 2022 | 2001 Union St | Electric Tech Construction Inc | at&t modification of an unmanned telecom. facility consisting of:remove and replace 6 panel antennas, painted to match bldg. install new rf safety, signs,barricades & stripping of rooftop. install 1 new rectifier in extg dc power plant rack and 1 new 6648 bbu with in extg 19" rack.Details
at&t modification of an unmanned telecom. facility consisting of:remove and replace 6 panel antennas, painted to match bldg. install new rf safety, signs,barricades & stripping of rooftop. install 1 new rectifier in extg dc power plant rack and 1 new 6648 bbu with in extg 19" rack. | $30,000 |
| Apr 28, 2022 | Expired or cancelled withdrawn Sep 2024 | 1635 Divisadero St | at&t mobility modification of an unmanned telecom facility consist of: remove + replace 10 panel antennas. install (n) rf safety signs, barricades, stripping on roof. install 1 (n) 6648 baseband unit in (e) durcell cabinet.Details
at&t mobility modification of an unmanned telecom facility consist of: remove + replace 10 panel antennas. install (n) rf safety signs, barricades, stripping on roof. install 1 (n) 6648 baseband unit in (e) durcell cabinet. | $55,000 | |
| Apr 14, 2022 | Completed final sign-off Sep 2022 | 2 New Montgomery St | Metropolitan Electrical Construction | at&t wireless: modification of an unmanned at&t telecom facility consisting of: remove & replace 4 panel antennas. remove 2 rrus 11 b12 and 2 rruw b5. install new rrus 4478 b12a. install 1 new 6648 baseband unit in (e) rack.Details
at&t wireless: modification of an unmanned at&t telecom facility consisting of: remove & replace 4 panel antennas. remove 2 rrus 11 b12 and 2 rruw b5. install new rrus 4478 b12a. install 1 new 6648 baseband unit in (e) rack. | $30,000 |
| Apr 11, 2022 | Completed final sign-off Jan 2023 | 833 Mission St | at&t (5th and mission): remove and replace 6 antennas, relocate 2 rrus 4449 b5/b12, post explanatory signage, remove 1 rbs 3518 cabinet, install 1 new rectifier in (e) dcpp and install 1 gen plug.Details
at&t (5th and mission): remove and replace 6 antennas, relocate 2 rrus 4449 b5/b12, post explanatory signage, remove 1 rbs 3518 cabinet, install 1 new rectifier in (e) dcpp and install 1 gen plug. | $25,000 | |
| Mar 31, 2022 | Completed final sign-off Oct 2022 | 234 09th St | Metropolitan Electrical Construction | at&t: remove and replace 6 antennas. remove 6 rrus and install 3 rrus. remove and replace 20 batteries. remove (1) 5216 within (e) fif rack. install 1 rectifier.Details
at&t: remove and replace 6 antennas. remove 6 rrus and install 3 rrus. remove and replace 20 batteries. remove (1) 5216 within (e) fif rack. install 1 rectifier. | $45,000 |
| Mar 21, 2022 | Completed final sign-off Feb 2023 | 2000 Van Ness Av | Ericsson Inc Dba E U S Inc | at&t: modification of an unmanned telecom facility consisting of: remove & replace 6 antennas behind frp screen. install new rf caution signs. remove & replace 1 battery cabinet. install 4 recitifiers in (e) cabinet. 1 new parcell cabinet. 1 new 6630 bbu within parcel cabinet.Details
at&t: modification of an unmanned telecom facility consisting of: remove & replace 6 antennas behind frp screen. install new rf caution signs. remove & replace 1 battery cabinet. install 4 recitifiers in (e) cabinet. 1 new parcell cabinet. 1 new 6630 bbu within parcel cabinet. | $45,000 |
| Mar 14, 2022 | Completed final sign-off Sep 2022 | 776 Bush St | Ericsson Inc Dba E U S Inc | at&t: remove + replace 8 panel antennas. install 1 dc 9 box on panthouse, 1 #6 awg dc power trunk. 1 new fiber trunk to new dc9. new rf safety signs + burriers / stripping. remove 24 batteries. install 20 new batteries in (e) cabs + rack. install 1 new 6648 bbu in (e) rack. remove unused coax.Details
at&t: remove + replace 8 panel antennas. install 1 dc 9 box on panthouse, 1 #6 awg dc power trunk. 1 new fiber trunk to new dc9. new rf safety signs + burriers / stripping. remove 24 batteries. install 20 new batteries in (e) cabs + rack. install 1 new 6648 bbu in (e) rack. remove unused coax. | $45,000 |
| Mar 10, 2022 | Completed final sign-off Jun 2025 | 678 Portola Dr | High Band Construction Inc | at&t: remove + install 3 antennas. install 1 new dc6squid, rf safety signs, burriers/stripping. install 4 new 175ah batteries in (e) cabinet. 2 new rectifiers in (e) dcpp, 1 new 6648 baseband in new fix21 v2 cabinet and 1 1/4" fiber trunk.Details
at&t: remove + install 3 antennas. install 1 new dc6squid, rf safety signs, burriers/stripping. install 4 new 175ah batteries in (e) cabinet. 2 new rectifiers in (e) dcpp, 1 new 6648 baseband in new fix21 v2 cabinet and 1 1/4" fiber trunk. | $45,000 |
| Feb 28, 2022 | Completed final sign-off Feb 2023 | 670 04th St | High Band Construction Inc | at&t modification of an unmanned telecom facility consisting of: remove + replace 6 panel antennas behind (e) frp / modification / extend, 6 rrus + relocate 3 rrus, 1 power trunk & 20 batteries within (e) dcpp + rack. install 4 rectifiers in (e) dcpp. 1 twin diplex each sector + 1 filter per sector.Details
at&t modification of an unmanned telecom facility consisting of: remove + replace 6 panel antennas behind (e) frp / modification / extend, 6 rrus + relocate 3 rrus, 1 power trunk & 20 batteries within (e) dcpp + rack. install 4 rectifiers in (e) dcpp. 1 twin diplex each sector + 1 filter per sector. | $45,000 |
| Feb 24, 2022 | Completed final sign-off Nov 2024 | 562 Market St | Invertice Inc, Metropolitan Electrical Construction | at&t: remove 11 panel antennas. install 9 (n) panel antennas. install missing antenna skirts @ sector a & install (n) safety rf signs, barriers & stripping. install 1 (n) flex 21v2 purcell cab w/6648 baseband unit within. remove (12) 155 155ah batteries & install 12 (n) 190ah in (e) dcpp & (4) rectiDetails
at&t: remove 11 panel antennas. install 9 (n) panel antennas. install missing antenna skirts @ sector a & install (n) safety rf signs, barriers & stripping. install 1 (n) flex 21v2 purcell cab w/6648 baseband unit within. remove (12) 155 155ah batteries & install 12 (n) 190ah in (e) dcpp & (4) recti | $45,000 |
| Feb 10, 2022 | Completed final sign-off Dec 2022 | 711 Potrero Av | at&t: relocate 3 (e) antennas on a replaced arm mount with 3 (n) panel antennas added. install 1 (n) dc9 squid. 1 (n) #6 adw dc power trunk. 1 (n) 1/4" fibertrunk to new dc9. 2 (n) rectifiers in (e) dc power plant.Details
at&t: relocate 3 (e) antennas on a replaced arm mount with 3 (n) panel antennas added. install 1 (n) dc9 squid. 1 (n) #6 adw dc power trunk. 1 (n) 1/4" fibertrunk to new dc9. 2 (n) rectifiers in (e) dc power plant. | $85,000 | |
| Dec 10, 2021 | Completed final sign-off Aug 2022 | 255 Steiner St | Metropolitan Electrical Construction | at&t modification.remove & replace(9) panel antennas in (e) radomes-sector c to remove & replace radomes.remove(6)rru's & replace w/3 new rru's & (3)new twin diplexers.remove(2)existing duw from (e)purcell cabs.install(8)new 185 ah batteries in(e)battery cabinet.(3)new rectifiersin(e) dc power plantDetails
at&t modification.remove & replace(9) panel antennas in (e) radomes-sector c to remove & replace radomes.remove(6)rru's & replace w/3 new rru's & (3)new twin diplexers.remove(2)existing duw from (e)purcell cabs.install(8)new 185 ah batteries in(e)battery cabinet.(3)new rectifiersin(e) dc power plant | $85,000 |
| Jul 26, 2021 | Expired or cancelled withdrawn Jul 2022 | 2425 17th St | Quality Telecom Consultants | revision to pa# 2021051049; correct a typo, revised wall anchorage details per owner's request, added redundant wall anchoros, all changes cloudedDetails
revision to pa# 2021051049; correct a typo, revised wall anchorage details per owner's request, added redundant wall anchoros, all changes clouded | $50,000 |
| May 10, 2021 | Completed final sign-off Feb 2023 | 2425 17th St | Quality Telecom Consultants | revision to pa# 201806081378. structural changes revised frp screws boxes from 4 to 3 moving sector btd to same bx. structural changes revised in cals.Details
revision to pa# 201806081378. structural changes revised frp screws boxes from 4 to 3 moving sector btd to same bx. structural changes revised in cals. | $200,000 |
| Jul 16, 2019 | Completed final sign-off Jan 2024 | 755 Stanyan St | Advanced Wireless & Logistics Inc | installation of an att wireless telecom facility. 12 antennas, 24 rru's, 4 dc-6 surge suppressors. ground equipment for telco + power sow on cps.Details
installation of an att wireless telecom facility. 12 antennas, 24 rru's, 4 dc-6 surge suppressors. ground equipment for telco + power sow on cps. | $200,000 |
| Jun 8, 2018 | Completed final sign-off Feb 2023 | 2425 17th St | Quality Telecom Consultants | installation of panel antennas, rrh's, and all equipment for telecom facility will be located at ground floorDetails
installation of panel antennas, rrh's, and all equipment for telecom facility will be located at ground floor | $200,000 |