Pamela Goode
- Listed as
- architect
- Firm
- Pwg Architect
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Jun 2022
12 permits since 2000 (architect on 12 permits): 10 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2022 | Completed final sign-off Apr 2023 | 400 Sutter St | Legacy Wireless Services Inc | at&t modif an unmanned telecom facility, remove/replace (1)panel antenna; add (3)new air antenna w/concealiment film. (2)new antenna pipe mast; remove (1)rbs2016 equip cabinet; install (1)new rectifier in existing dcpp; (1)new stackable battery unit for (8)new lead acid power safe sbs190 batteriesDetails
at&t modif an unmanned telecom facility, remove/replace (1)panel antenna; add (3)new air antenna w/concealiment film. (2)new antenna pipe mast; remove (1)rbs2016 equip cabinet; install (1)new rectifier in existing dcpp; (1)new stackable battery unit for (8)new lead acid power safe sbs190 batteries | $35,000 |
| Apr 6, 2016 | Completed final sign-off Aug 2016 | 782 16th Av | Stroud Construction | new bathroom on 3rd floor in master bedroom. remodel extg bathroom on 3rd floor to become a laundry room. all changes within extg envelope. no new windows.Details
new bathroom on 3rd floor in master bedroom. remodel extg bathroom on 3rd floor to become a laundry room. all changes within extg envelope. no new windows. | $45,000 |
| Feb 16, 2016 | Completed final sign-off Dec 2016 | 180 Saint Elmo Wy | Greg Livy, Inc. | remodel within bldg envelope. remodel kitchen and reconfigure den/office and powder room lower extg floor joists for code compliant ceiling height. add new bathroom on 2nd floor and reconfigured master bath. new laundry 2nd floor, 5 new windows back and side (not visible to front)Details
remodel within bldg envelope. remodel kitchen and reconfigure den/office and powder room lower extg floor joists for code compliant ceiling height. add new bathroom on 2nd floor and reconfigured master bath. new laundry 2nd floor, 5 new windows back and side (not visible to front) | $125,000 |
| Dec 10, 2015 | Completed final sign-off Jan 2017 | 1459 43rd Av | J Reilly Construction | remodel part of garage into home office and powder room and new furnace.Details
remodel part of garage into home office and powder room and new furnace. | $38,000 |
| Dec 1, 2015 | Completed final sign-off Apr 2017 | 706 47th Av | Stephan Meyer Construction | add bathroom @ (e) mechanical room @ 1st floor.Details
add bathroom @ (e) mechanical room @ 1st floor. | $12,000 |
| Sep 25, 2014 | Completed final sign-off Apr 2015 | 327 Staples Av | Straightedge Construction | roof deck over the existing 1st floor kitchen roof, 188 sfDetails
roof deck over the existing 1st floor kitchen roof, 188 sf | $20,000 |
| Aug 26, 2014 | Expired or cancelled cancelled Dec 2015 | 1459 43rd Av | horizontal addition. remodel back of 1st fl garage with new bedroom & bath. additional 1st fl family room & connect to (e) 2nd fl living space with open stair. new roof deck above family room (2nd level).Details
horizontal addition. remodel back of 1st fl garage with new bedroom & bath. additional 1st fl family room & connect to (e) 2nd fl living space with open stair. new roof deck above family room (2nd level). | $90,000 | |
| Jan 28, 2014 | Never finaled issued Mar 2015, no final | 2 Wright St | Cronin Construction & Development Inc. | basement addition under area of (e) deck which will be removed & replaced. addition will be bedroom, bath & interior stair to 1st floor. replace (e) furnace. relocate laundry to basement.Details
basement addition under area of (e) deck which will be removed & replaced. addition will be bedroom, bath & interior stair to 1st floor. replace (e) furnace. relocate laundry to basement. | $90,000 |
| Oct 11, 2013 | Completed final sign-off Jul 2016 | 3335 Clement St | Cronin Construction & Development Inc. | kitchen and bath remodel. all construction within building envelope. new gas forced air furnace to replace extg wall gas heater.Details
kitchen and bath remodel. all construction within building envelope. new gas forced air furnace to replace extg wall gas heater. | $37,000 |
| Mar 15, 2012 | Completed final sign-off Nov 2012 | 180 Marview Wy | Ventana 76 | 1st floor (garage)-remodel/legalize 2 bedrooms, 1 playroom, 1 bathroom, closets & utility room with volutary plywood stiffeningDetails
1st floor (garage)-remodel/legalize 2 bedrooms, 1 playroom, 1 bathroom, closets & utility room with volutary plywood stiffening | $175,000 |
| Jun 4, 2010 | Completed final sign-off Dec 2010 | 3750 20th St | remodel (e) 1st. flr. storage space intro bedroom, bath & family room with interior stair to second flr. remove portion o wall between 2nd. flr. dining & kitchen, add beam & posts.Details
remodel (e) 1st. flr. storage space intro bedroom, bath & family room with interior stair to second flr. remove portion o wall between 2nd. flr. dining & kitchen, add beam & posts. | $50,000 | |
| Mar 20, 2008 | Completed final sign-off Nov 2008 | 2843 Balboa St | convert the back part of 1st floor garage into bedroom, office and bathroom. install shear walls and anchor bolting on ground floor.Details
convert the back part of 1st floor garage into bedroom, office and bathroom. install shear walls and anchor bolting on ground floor. | $80,000 |