Doug Zuuring
- License
- C76818
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C76818 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Dec 2024 to Jul 2025
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- M Hernandez Construction Inc, R & S Construction Management Inc
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2025 | Completed final sign-off May 2026 | 501 Stanyan St | R & S Construction Management Inc | parks and rec. project- renovation of curb ramps and crosswalks along jfk promenade and driveways on stanyan st.Details
parks and rec. project- renovation of curb ramps and crosswalks along jfk promenade and driveways on stanyan st. | $170,340 |
| Jul 17, 2025 | Completed final sign-off Mar 2026 | 3200 Folsom St | prepare site for installtion of new pre-fabricated restroom & associate accessibility upgrades. scope includes demolition of (e) site features. installation of new prefabricated restroom and pad and association utilities & pathway improvements. this permit does not include the restroom buildingDetails
prepare site for installtion of new pre-fabricated restroom & associate accessibility upgrades. scope includes demolition of (e) site features. installation of new prefabricated restroom and pad and association utilities & pathway improvements. this permit does not include the restroom building | $200,000 | |
| Dec 12, 2024 | Completed final sign-off Apr 2026 | 1101 John F Kennedy Dr | M Hernandez Construction Inc | for san francisco police department golden gate stable improvements. demolition and excavation of existing sand within the arena and paddock areas and install new sub-grade improvements. the scope includes imported footing material, sub-drainage, wood wall and minor concrete paving.Details
for san francisco police department golden gate stable improvements. demolition and excavation of existing sand within the arena and paddock areas and install new sub-grade improvements. the scope includes imported footing material, sub-drainage, wood wall and minor concrete paving. | $775,636 |