Doug Zuuring
- Listed as
- engineer
- On San Francisco permits
- Dec 2024 to Jul 2025
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2025 | Completed final sign-off May 2026 | 501 Stanyan St | R & S Construction Management Inc | parks and rec. project- renovation of curb ramps and crosswalks along jfk promenade and driveways on stanyan st.Details
parks and rec. project- renovation of curb ramps and crosswalks along jfk promenade and driveways on stanyan st. | $170,340 |
| Jul 17, 2025 | Completed final sign-off Mar 2026 | 3200 Folsom St | prepare site for installtion of new pre-fabricated restroom & associate accessibility upgrades. scope includes demolition of (e) site features. installation of new prefabricated restroom and pad and association utilities & pathway improvements. this permit does not include the restroom buildingDetails
prepare site for installtion of new pre-fabricated restroom & associate accessibility upgrades. scope includes demolition of (e) site features. installation of new prefabricated restroom and pad and association utilities & pathway improvements. this permit does not include the restroom building | $200,000 | |
| Dec 12, 2024 | Completed final sign-off Apr 2026 | 1101 John F Kennedy Dr | M Hernandez Construction Inc | for san francisco police department golden gate stable improvements. demolition and excavation of existing sand within the arena and paddock areas and install new sub-grade improvements. the scope includes imported footing material, sub-drainage, wood wall and minor concrete paving.Details
for san francisco police department golden gate stable improvements. demolition and excavation of existing sand within the arena and paddock areas and install new sub-grade improvements. the scope includes imported footing material, sub-drainage, wood wall and minor concrete paving. | $775,636 |