Permit GraphShortlistSan Francisco building permits since 2000

Mark Biginski

License
4089
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
architect
Firm
Verde Design
Based in
Santa Clara
On San Francisco permits
Jun 2013 to Apr 2025

7 permits since 2000 (architect on 7 permits): 5 completed, 2 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Intermountain Electric Company, N B C Construction, Roebuck Construction
Engineers
Sammy Fernandez (2), Benjamin Entezam, Dale Hendsbee

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 29, 2025Completed
final sign-off Nov 2025
1199 09th AvN B C Constructionbarrier removal of ada asphalt pathways, barrier removal of (e) concrete ramp and metal handrail, install concrete ramps and metal handrails along pathway segments, barrier removal of pathways leading to north entrance of garden.
Details
Permit
202504295448
Permit issued
May 8, 2025
Final sign-off
Nov 13, 2025

barrier removal of ada asphalt pathways, barrier removal of (e) concrete ramp and metal handrail, install concrete ramps and metal handrails along pathway segments, barrier removal of pathways leading to north entrance of garden.

Open the permit page

$500,000
Sep 27, 2023Completed
final sign-off Apr 2024
3861 24th StRoebuck Constructiondemo and site improvement to install a single user restroom that has been pre fabricated and state approved including utility connections. relocation of site furnishings, site grading and paving, fencing, irrigation, foudnation pad, planting
Details
Permit
202309277512
Permit issued
Oct 2, 2023
Final sign-off
Apr 12, 2024

demo and site improvement to install a single user restroom that has been pre fabricated and state approved including utility connections. relocation of site furnishings, site grading and paving, fencing, irrigation, foudnation pad, planting

Open the permit page

$200,000
Nov 3, 2020Completed
final sign-off Mar 2022
2001 37th AvIntermountain Electric Companyinstallation of (4) sport field lighting poles and fixtures including associative electrical infrastructure and additional improvements at st. ignatius football field.
Details
Permit
202011038079
Permit issued
Jul 22, 2021
Final sign-off
Mar 11, 2022

installation of (4) sport field lighting poles and fixtures including associative electrical infrastructure and additional improvements at st. ignatius football field.

Open the permit page

$1,300,000
Mar 1, 2019Completed
final sign-off May 2021
1700 Silver Avreplace the synthetic turf w/new synthetic turf at athletic field. replace (e) chain link fence fabric with new. add a batting cage, minor ada improvements to public restrooms (barrier removal)
Details
Permit
201903014237
Permit issued
Mar 27, 2019
Final sign-off
May 3, 2021

replace the synthetic turf w/new synthetic turf at athletic field. replace (e) chain link fence fabric with new. add a batting cage, minor ada improvements to public restrooms (barrier removal)

Open the permit page

$103,375
Mar 1, 2019Completed
final sign-off May 2021
1398 Hudson Avreplace the synthetic turf w/new at athletic field. replace (e) chain link fabric w/new. repair wooden bleachers, upgrade (e) field drainage piping.
Details
Permit
201903014235
Permit issued
Mar 27, 2019
Final sign-off
May 4, 2021

replace the synthetic turf w/new at athletic field. replace (e) chain link fabric w/new. repair wooden bleachers, upgrade (e) field drainage piping.

Open the permit page

$160,810
Dec 17, 2013Never finaled
issued Jan 2014, no final
4551 John F Kennedy Drcompliance with ordinance no.155-13 required. route to dph. renovation of stand along public restroom bldg. renovation of (e) athletic fields including lighting, fencing, paving, landscape, irrigation & site furniture.
Details
Permit
201312174387
Permit issued
Jan 23, 2014

compliance with ordinance no.155-13 required. route to dph. renovation of stand along public restroom bldg. renovation of (e) athletic fields including lighting, fencing, paving, landscape, irrigation & site furniture.

Open the permit page

$2,200,000
Jun 10, 2013Never finaled
issued Jul 2013, no final
546 Capitol Avrenovate turf athletic field with synthetic turf and field lights. new/renovated fencings, walls, drainage, irrigation planting.
Details
Permit
201306109024
Permit issued
Jul 29, 2013

renovate turf athletic field with synthetic turf and field lights. new/renovated fencings, walls, drainage, irrigation planting.

Open the permit page

$2,000,000