Mark Biginski
- Listed as
- architect
- Firm
- Verde Design
- Based in
- Santa Clara
- On San Francisco permits
- Jun 2013 to Apr 2025
7 permits since 2000 (architect on 7 permits): 5 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 29, 2025 | Completed final sign-off Nov 2025 | 1199 09th Av | N B C Construction | barrier removal of ada asphalt pathways, barrier removal of (e) concrete ramp and metal handrail, install concrete ramps and metal handrails along pathway segments, barrier removal of pathways leading to north entrance of garden.Details
barrier removal of ada asphalt pathways, barrier removal of (e) concrete ramp and metal handrail, install concrete ramps and metal handrails along pathway segments, barrier removal of pathways leading to north entrance of garden. | $500,000 |
| Sep 27, 2023 | Completed final sign-off Apr 2024 | 3861 24th St | Roebuck Construction | demo and site improvement to install a single user restroom that has been pre fabricated and state approved including utility connections. relocation of site furnishings, site grading and paving, fencing, irrigation, foudnation pad, plantingDetails
demo and site improvement to install a single user restroom that has been pre fabricated and state approved including utility connections. relocation of site furnishings, site grading and paving, fencing, irrigation, foudnation pad, planting | $200,000 |
| Nov 3, 2020 | Completed final sign-off Mar 2022 | 2001 37th Av | Intermountain Electric Company | installation of (4) sport field lighting poles and fixtures including associative electrical infrastructure and additional improvements at st. ignatius football field.Details
installation of (4) sport field lighting poles and fixtures including associative electrical infrastructure and additional improvements at st. ignatius football field. | $1,300,000 |
| Mar 1, 2019 | Completed final sign-off May 2021 | 1700 Silver Av | replace the synthetic turf w/new synthetic turf at athletic field. replace (e) chain link fence fabric with new. add a batting cage, minor ada improvements to public restrooms (barrier removal)Details
replace the synthetic turf w/new synthetic turf at athletic field. replace (e) chain link fence fabric with new. add a batting cage, minor ada improvements to public restrooms (barrier removal) | $103,375 | |
| Mar 1, 2019 | Completed final sign-off May 2021 | 1398 Hudson Av | replace the synthetic turf w/new at athletic field. replace (e) chain link fabric w/new. repair wooden bleachers, upgrade (e) field drainage piping.Details
replace the synthetic turf w/new at athletic field. replace (e) chain link fabric w/new. repair wooden bleachers, upgrade (e) field drainage piping. | $160,810 | |
| Dec 17, 2013 | Never finaled issued Jan 2014, no final | 4551 John F Kennedy Dr | compliance with ordinance no.155-13 required. route to dph. renovation of stand along public restroom bldg. renovation of (e) athletic fields including lighting, fencing, paving, landscape, irrigation & site furniture.Details
compliance with ordinance no.155-13 required. route to dph. renovation of stand along public restroom bldg. renovation of (e) athletic fields including lighting, fencing, paving, landscape, irrigation & site furniture. | $2,200,000 | |
| Jun 10, 2013 | Never finaled issued Jul 2013, no final | 546 Capitol Av | renovate turf athletic field with synthetic turf and field lights. new/renovated fencings, walls, drainage, irrigation planting.Details
renovate turf athletic field with synthetic turf and field lights. new/renovated fencings, walls, drainage, irrigation planting. | $2,000,000 |