8 permits since 2000 (architect on 7 permits, engineer on 1 permit): 5 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2017 | Completed final sign-off Sep 2017 | 1254 12th Av | J Z Construction | revision to pa 2015-0901-5755 - add heater, hose bib, lights, skylights. create home office at ground floor. no exterior work.Details
revision to pa 2015-0901-5755 - add heater, hose bib, lights, skylights. create home office at ground floor. no exterior work. | $2,000 |
| Sep 1, 2015 | Completed final sign-off Sep 2017 | 1254 12th Av | J Z Construction | remove sun room, laudry room. add basement, bathroom, laundry,den, deck electrical: lights, receptacles, plumbing: washing machine, bath fixtures, sink.Details
remove sun room, laudry room. add basement, bathroom, laundry,den, deck electrical: lights, receptacles, plumbing: washing machine, bath fixtures, sink. | $89,100 |
| May 30, 2014 | Expired or cancelled expired Jun 2016 | 27 Starview Wy | kitchen and bath remodel, elec panel upgrade; replace 2 windows u factor 0.40 max (not visible to the street)Details
kitchen and bath remodel, elec panel upgrade; replace 2 windows u factor 0.40 max (not visible to the street) | $15,000 | |
| Mar 18, 2010 | Completed final sign-off Aug 2010 | 405 Howard St | Paradigm General Contractors | 5th floor t.i. , add partial wall @ 545 @ multipurpose room, wall & door @ 555 conf. rm; add rated wall @ 551 to create room #556 which is added glass & door ; add wall & door @ 550 to create storage & window @ 544, add partial wall & closet door @ 503.Details
5th floor t.i. , add partial wall @ 545 @ multipurpose room, wall & door @ 555 conf. rm; add rated wall @ 551 to create room #556 which is added glass & door ; add wall & door @ 550 to create storage & window @ 544, add partial wall & closet door @ 503. | $10,415 |
| Jun 27, 2008 | Never finaled issued Sep 2008, no final | 55 Concourse Dr | Acco Engineered Systems Inc. Dba Acco En | addition of 1 new diesel generator, addition of fuel oil piping from existing fuel oil day tank to new generator. new generator to support aquatic systems, not life safety systems. new non-bearing partitions to separate rooms & exhaust enclosure. new wall/ ac separate permitDetails
addition of 1 new diesel generator, addition of fuel oil piping from existing fuel oil day tank to new generator. new generator to support aquatic systems, not life safety systems. new non-bearing partitions to separate rooms & exhaust enclosure. new wall/ ac separate permit | $379,000 |
| Feb 27, 2008 | Never finaled issued Jul 2008, no final | 55 Concourse Dr | b1-office addition, stair addition. l1-remodel conference room, kitchen, add stairs. l2 & l3-office remodels. lighting & hvac mechanical under separate permit.Details
b1-office addition, stair addition. l1-remodel conference room, kitchen, add stairs. l2 & l3-office remodels. lighting & hvac mechanical under separate permit. | $200,000 | |
| Dec 14, 2007 | Completed final sign-off Apr 2010 | 101 Spear St | 4th floor: separate current office space into three different space with demising walls. create new rated corridor & foyer. m.e.p. is under separate permit.Details
4th floor: separate current office space into three different space with demising walls. create new rated corridor & foyer. m.e.p. is under separate permit. | $45,000 | |
| Nov 26, 2007 | Completed final sign-off Apr 2010 | 101 Spear St | 4th floor: tenant improvement of existing office space - new ceiling & finish throughout floor, no structural work, mep - fire sprinklers on separate permit.Details
4th floor: tenant improvement of existing office space - new ceiling & finish throughout floor, no structural work, mep - fire sprinklers on separate permit. | $933,000 |