Roland Haga
- License
- C43971
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C43971 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Sep 2009 to Dec 2009
2 permits since 2000 (engineer on 2 permits): 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Herrero Builders Incorporated, Marcor Environmental West Inc.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 2 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 2, 2009 | Never finaled issued Apr 2010, no final | 2999 John F. Kennedy Dr | Marcor Environmental West Inc. | demolition of grandstand (stables) at golden gate park.Details
demolition of grandstand (stables) at golden gate park. | $177,000 |
| Sep 22, 2009 | Never finaled filed Sep 2009, never issued | 2901 California St | Herrero Builders Incorporated | demo/remove (e) site improvements & misc structures to accomodate new foundation sys for the new/future drew school addition. grade & excavate the removal of earth material to sub-grade lvl of new bldg foundation & construct & install foudnation shoring as indicated on shoring plans.Details
demo/remove (e) site improvements & misc structures to accomodate new foundation sys for the new/future drew school addition. grade & excavate the removal of earth material to sub-grade lvl of new bldg foundation & construct & install foudnation shoring as indicated on shoring plans. | $100,000 |