Clark Construction Group Ca Lp
- Based in
- Bethesda
- On San Francisco permits
- Jun 2014 to Mar 2026
- Last 24 months
- 3 permits filed
62 permits since 2000: 38 completed, 13 in progress, 11 never finaled.
Of the 11 never-finaled permits, 4 are 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 6 have no building type on record and are shown as other.
Stairs permits
6 stairs permits: 5 completed, 1 never finaled. Typically 123 days from filing to permit and 534 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2023 | Never finaled filed Oct 2023, never issued | 401 Hunters Point Bl | proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge.Details
proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge. | $29,000,000 |
| Aug 25, 2020 | Completed final sign-off Nov 2021 | 1995 Evans Av | scope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2.Details
scope is metal stairs (stair #1) only, deferred submittal of metal stairs designed by sgh, reference to pa #201712217070 addendum 2. | $180,000 |
| Jan 16, 2020 | Completed final sign-off Dec 2021 | 1995 Evans Av | scope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure.Details
scope is metal stairs(stair# 2) only. deferred submittal of metal stairs(stairs# 2) designed by pacific stair. reference pa# 2017-1221-7090 s2: foundation & superstructure. | $85,000 |
| Nov 5, 2019 | Completed final sign-off Apr 2020 | 1399 Mcallister St | replace rear stairs in kindDetails
replace rear stairs in kind | $12,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2021 | 1995 Evans Av | scope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs.Details
scope is brace frames only. deferred submittal of brace frames designed by corebrace. reference documents permit app #2017-1221-7090 s2: foundations, superstructure & metal stairs. | $1,500,000 |
| Jul 29, 2016 | Completed final sign-off Mar 2018 | 1 Newhall St | deferred shop drawing submittal to ref pa 201406269545-s2 - fabricate and install stair no.1 and stair no.2 & cross over stair on the roof maherDetails
deferred shop drawing submittal to ref pa 201406269545-s2 - fabricate and install stair no.1 and stair no.2 & cross over stair on the roof maher |