Block 3733, lot 081
851 Howard St
- City’s use
- Industrial
- Built
- 1924
- Stories
- 2
- Rooms
- 4 bathrooms
- Building
- 32,160 sq ft
- Lot
- 10,900 sq ft
- Zoning
- C3S
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 23, 2024 | In progress issued Aug 2025 | 851 Howard St | change of use from office space to place of assembly (a3/a2). no work or alteration to buliding.Details
change of use from office space to place of assembly (a3/a2). no work or alteration to buliding. | ||
| Jun 14, 2016 | Completed final sign-off Nov 2016 | 851 Howard St | Peacock Construction | basement - selective demo of built-in furniture, infill of existing non-structural partition, install new furniture with associated devices. add (3) - 8 foot fed strip lights includes t-24 electrical.Details
basement - selective demo of built-in furniture, infill of existing non-structural partition, install new furniture with associated devices. add (3) - 8 foot fed strip lights includes t-24 electrical. | $12,000 |
| Jan 22, 2015 | Completed final sign-off Mar 2015 | 851 Howard St | C B 2 Builders Incorporated | re-slope concrete walk at building entrance.Details
re-slope concrete walk at building entrance. | $30,000 |
| Oct 22, 2009 | Expired or cancelled cancelled Nov 2009 | 851 Howard St | Integrated Access/Lockworks Unlimited | finish installation of bottom rod and latch on panic device for 2 existing doors. install latch covers to bring up to current ada code at 1st flDetails
finish installation of bottom rod and latch on panic device for 2 existing doors. install latch covers to bring up to current ada code at 1st fl | $4,161 |
| Aug 15, 2006 | Never finaled issued Aug 2006, no final | 851 Howard St | Paradigm General Contractors | replace reception desk, revise entry feature wall, revise classroom wall, enclose 2/f office area, code upgrades include 1/f hall, 2/f classroom exit enclosure. ada upgrades - 1/f entrance, 1/f restroom doors, 2/f drinking fountain replacement.Details
replace reception desk, revise entry feature wall, revise classroom wall, enclose 2/f office area, code upgrades include 1/f hall, 2/f classroom exit enclosure. ada upgrades - 1/f entrance, 1/f restroom doors, 2/f drinking fountain replacement. | $175,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- C B 2 Builders Incorporated, Integrated Access/Lockworks Unlimited, Paradigm General Contractors, Peacock Construction
- Architects
- Lawrence J. Smith, Michelle Jones, Roy Wilson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.