Avery Taylor Moore
- License
- C14789
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others
- Firm
- Field Paoli/Joseph Chow
- On San Francisco permits
- Feb 2006 to Sep 2013
4 permits since 2000 (architect on 4 permits, authorized agent-others on 1 permit): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Pankow Special Projects Lp, Turner Construction Co
- Engineers
- Sean Timmons (2), Sunil Gupta
- Authorized agents
- Robert Cooley
- Lessees
- Christen Soares
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 27, 2013 | Completed final sign-off Aug 2014 | 2495 Golden Gate Av | Turner Construction Co | interior renovation of existing rave book room within existing libaray, scope includes expanded secure storage/library stacks, new ceiling, lighting, mechanical & related partitions. new interior store front system and doors, security, fire alarm, plumbing and shelving also included.Details
interior renovation of existing rave book room within existing libaray, scope includes expanded secure storage/library stacks, new ceiling, lighting, mechanical & related partitions. new interior store front system and doors, security, fire alarm, plumbing and shelving also included. | $750,000 |
| Jun 15, 2009 | Never finaled issued Nov 2009, no final | 3150 Sacramento St | interior remodel of 1st&2nd/fl new finishes, ff & e, elec/mech sys. new public toilet facilities. correct access issues @sidewalk, curb ramp, exteiror ramps/bookdrop & elevator. refurnish perimeter book shelves&windows. restore exterior masonry, terra cotta, main stairs&entry portico ceiling.Details
interior remodel of 1st&2nd/fl new finishes, ff & e, elec/mech sys. new public toilet facilities. correct access issues @sidewalk, curb ramp, exteiror ramps/bookdrop & elevator. refurnish perimeter book shelves&windows. restore exterior masonry, terra cotta, main stairs&entry portico ceiling. | $1,560,000 | |
| Jun 15, 2009 | Completed final sign-off Oct 2013 | 1833 Page St | interior remodel of both 1st & 2nd floors: new finishes, furniture fixture & equipment, electrical & mechanical systems, new public toilet facilities. correct access issues at sidewalk, curb ramp & exterior book drop. refurbish perimeter bookshelves & windows.Details
interior remodel of both 1st & 2nd floors: new finishes, furniture fixture & equipment, electrical & mechanical systems, new public toilet facilities. correct access issues at sidewalk, curb ramp & exterior book drop. refurbish perimeter bookshelves & windows. | $1,087,000 | |
| Feb 10, 2006 | Completed final sign-off Apr 2006 | 150 California St | Pankow Special Projects Lp | oti-1 4/f el, me, ls, spDetails
oti-1 4/f el, me, ls, sp | $90,000 |