Ronald Eddington
- License
- S3376
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S3376 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Eddington Engineering Inc.
- On San Francisco permits
- Jun 2015 to Apr 2023
4 permits since 2000 (engineer on 4 permits): 2 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Centric Building Inc., Element One Builders Inc., Mark Scott Construction Inc, San Francisco Elevator Services Llc
- Architects
- Harvey J Hacker, Michael Stanton
- Engineers
- Donald David
- Designers
- Jared William Celey-Butlin
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2023 | Completed final sign-off Apr 2024 | 2335 Golden Gate Av | San Francisco Elevator Services Llc | deferred submittal: shop drawings for hydraulic elevator system ref pa 2021-0521-0845Details
deferred submittal: shop drawings for hydraulic elevator system ref pa 2021-0521-0845 | |
| Feb 21, 2023 | Never finaled issued Sep 2023, no final | 400 Mcallister St | Mark Scott Construction Inc | elevator upgrade of 6 traction cars & 1 hydraulic, electrical & control & motors replaced.Details
elevator upgrade of 6 traction cars & 1 hydraulic, electrical & control & motors replaced. | $3,100,000 |
| May 15, 2019 | Completed final sign-off May 2024 | 207 Powell St | Element One Builders Inc. | rev to pa201905150709: replacement of (e) elevator, modify elevator penthouse, accessbility upgrades.no exterior work. n/a maherDetails
rev to pa201905150709: replacement of (e) elevator, modify elevator penthouse, accessbility upgrades.no exterior work. n/a maher | $100,000 |
| Jun 15, 2015 | Never finaled issued Oct 2015, no final | 545 Post St | Centric Building Inc. | equipment upgrades of 2 existing elevators with modification to (e) elevator #1 machine room on roof. mep. under seperate permit.Details
equipment upgrades of 2 existing elevators with modification to (e) elevator #1 machine room on roof. mep. under seperate permit. | $40,000 |