Brandon Marshall
- Listed as
- architect, designer
- Firm
- Fog Studio
- Based in
- Benicia
- On San Francisco permits
- Mar 2015 to Sep 2023
19 permits since 2000 (architect on 18 permits, designer on 1 permit): 12 completed, 2 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2023 | In progress issued Nov 2023 | 4145 20th St | Precision General Contruction | unit 4147 20th st: (2) new windows and (2) new doors (facing rear). plumbing and electrical as required by above scope. revison to (e) bathroom, kitchen, and dining area.Details
unit 4147 20th st: (2) new windows and (2) new doors (facing rear). plumbing and electrical as required by above scope. revison to (e) bathroom, kitchen, and dining area. | $136,000 |
| Sep 8, 2023 | Expired or cancelled expired Jun 2026 | 4145 20th St | Precision General Contruction | g/f: new window on north (front) facade.Details
g/f: new window on north (front) facade. | $1,000 |
| Aug 23, 2023 | Never finaled issued Sep 2023, no final | 4145 20th St | Precision General Contruction | 1st fl bedroom addition & sitting area on ground fl within (e) envelope for unit 4145 20th st. 2nd fl bathroom addition, renovation of bedroom at 4145 20th st. eletrical & plumbing as reqDetails
1st fl bedroom addition & sitting area on ground fl within (e) envelope for unit 4145 20th st. 2nd fl bathroom addition, renovation of bedroom at 4145 20th st. eletrical & plumbing as req | $200,000 |
| Jul 28, 2023 | In progress issued Oct 2025 | 962 Key Av | Sf Design Solutions Inc | rear 3-story addition to (e) 2-story home including removal of previous addition, kitchen remodel, (n) deck & main & upper levels & access stair to rear yard.Details
rear 3-story addition to (e) 2-story home including removal of previous addition, kitchen remodel, (n) deck & main & upper levels & access stair to rear yard. | $330,208 |
| Dec 2, 2021 | Completed final sign-off Feb 2023 | 2612 Ocean Av | Cobuild Construction Services Inc | t.i. : new carpet, casework, grab bars, tile, countertops. t.i. existing bathroom mech to remain.Details
t.i. : new carpet, casework, grab bars, tile, countertops. t.i. existing bathroom mech to remain. | $175,000 |
| Oct 7, 2020 | Never finaled issued Apr 2021, no final | 1 Quartz Wy | remove (e) brick fence and retaining wall and patio. build (n) concrete patio and retaining wall with wood and steel fenceDetails
remove (e) brick fence and retaining wall and patio. build (n) concrete patio and retaining wall with wood and steel fence | $10,000 | |
| Oct 6, 2020 | Never finaled issued Oct 2020, no final | 719 Faxon Av | Wesco Construction | revision to permit # 2017-1220-6995. to move proposed rear door at den, to be removedDetails
revision to permit # 2017-1220-6995. to move proposed rear door at den, to be removed | |
| Oct 1, 2020 | Completed final sign-off Jan 2022 | 97 Amber Dr | interior remodel to convert unconditioned 1st flr to office, media room & bathroom. (n) windows & doors to replace (e) in-kind throughout. kitchen remodel, bath remodels at 2nd flr, skylights, electr & plumb, structural work for new areas.Details
interior remodel to convert unconditioned 1st flr to office, media room & bathroom. (n) windows & doors to replace (e) in-kind throughout. kitchen remodel, bath remodels at 2nd flr, skylights, electr & plumb, structural work for new areas. | $40,000 | |
| Sep 17, 2020 | Expired or cancelled withdrawn Sep 2021 | 3071 Harrison St | to comply with nov # 202030329; 80 sq ft deck at 2nd storyDetails
to comply with nov # 202030329; 80 sq ft deck at 2nd story | $45,000 | |
| Dec 4, 2019 | Completed final sign-off Nov 2020 | 29 Caselli Av | Koefoed Const Co | replace (e) rear stair w/ wood-framed stair, modify wdw size to accomodate stair landing.Details
replace (e) rear stair w/ wood-framed stair, modify wdw size to accomodate stair landing. | $21,000 |
| Nov 15, 2019 | Completed final sign-off Nov 2020 | 234 Lisbon St | Koefoed Const Co | rev to pa:201802090957: 1/f: provide separate heating system *ductelss), revise bathroom grade - no excavation, add w/d in approved bathroom, take out job in wall.Details
rev to pa:201802090957: 1/f: provide separate heating system *ductelss), revise bathroom grade - no excavation, add w/d in approved bathroom, take out job in wall. | |
| Jul 17, 2019 | Completed final sign-off Mar 2020 | 2378 36th Av | Koefoed Const Co | renovation of extg bathroom and laundry to new master bath, 1/2 bath and new communicating stair to lower bedroom.Details
renovation of extg bathroom and laundry to new master bath, 1/2 bath and new communicating stair to lower bedroom. | $150,000 |
| Apr 29, 2019 | Completed final sign-off May 2019 | 206 Lisbon St | S H C I | revision to 201808248283, revised deck elevation <30" and remove fire walls on existing permit 201808278283Details
revision to 201808248283, revised deck elevation <30" and remove fire walls on existing permit 201808278283 | |
| May 18, 2018 | Completed final sign-off Oct 2019 | 1175 Howard St | J & J South West Construction Inc | interior renovation of gr fl of approx 3400 sf including replacement of e kitchen caginets, counters and fixtures, e lighting in multi function space, existing accordion doors, air handling unit and minor ceiling partition adjustments, new pain interior and exterior. maher n/a.Details
interior renovation of gr fl of approx 3400 sf including replacement of e kitchen caginets, counters and fixtures, e lighting in multi function space, existing accordion doors, air handling unit and minor ceiling partition adjustments, new pain interior and exterior. maher n/a. | $86,000 |
| Feb 9, 2018 | Completed final sign-off Dec 2020 | 234 Lisbon St | renovation of (e) portion of garage to add accessory dwelling unit of 497 sf, including kitchen & bath per ordinance 95-17.Details
renovation of (e) portion of garage to add accessory dwelling unit of 497 sf, including kitchen & bath per ordinance 95-17. | $100,000 | |
| Dec 20, 2017 | Completed final sign-off Jan 2021 | 719 Faxon Av | Wesco Construction | two-story 644 sf addition, new stair, kitchen & bath remodel.Details
two-story 644 sf addition, new stair, kitchen & bath remodel. | $175,000 |
| Feb 8, 2017 | Completed final sign-off Dec 2018 | 992 Valencia St | J & J South West Construction Inc | renovation of e restrooms to ada compliance, new power door operator at entry(signage)Details
renovation of e restrooms to ada compliance, new power door operator at entry(signage) | $61,500 |
| Dec 22, 2015 | Completed final sign-off Dec 2019 | 2477 Lombard St | change of occupancy from r-3 to r-2. (n) ground floor 3-bedroom additional dwelling unit within (e) envelope part of soft story program ord 30-15 seismic permit 201511243532. 1342 sq ft renovation, 2-bath, 3-bedroomDetails
change of occupancy from r-3 to r-2. (n) ground floor 3-bedroom additional dwelling unit within (e) envelope part of soft story program ord 30-15 seismic permit 201511243532. 1342 sq ft renovation, 2-bath, 3-bedroom | $100,000 | |
| Mar 6, 2015 | Completed final sign-off Oct 2016 | 1970 32nd Av | Koefoed Const Co | horizontal addition to rear yard, 474 sf total. 1-story with deck (n) over 1st floor. adding 1 bedroom, 1 bath.Details
horizontal addition to rear yard, 474 sf total. 1-story with deck (n) over 1st floor. adding 1 bedroom, 1 bath. | $125,000 |