Back to bathroom remodel contractors
Skyline Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2026
- Last 24 months
- 251 permits filed
3,589 permits since 2000: 2,577 completed, 149 in progress, 492 never finaled, 371 expired or cancelled.
Of the 492 never-finaled permits, 43 are 3 to 5 years old, 236 are 5 to 10 years old, 213 are over 10 years old. 8 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 2 in progress. Typically 28 days from filing to permit and 226 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2024 | In progress issued Jan 2025 | 505 Howard St | 9th fl - demo (e) non-structural partitions & replace with (n) non structural partitions. (n) lighting & associated mep upgrades & bathroom upgradesDetails
9th fl - demo (e) non-structural partitions & replace with (n) non structural partitions. (n) lighting & associated mep upgrades & bathroom upgrades | $643,100 |
| Dec 16, 2024 | In progress issued Jan 2025 | 505 Howard St | 10/fl- ti demo (e) partitions (nonstructural) and replace w/ (n) partitions, (n) associated millwork, lighting, mep and bathroom upgrades structural upgrades on (e) slabDetails
10/fl- ti demo (e) partitions (nonstructural) and replace w/ (n) partitions, (n) associated millwork, lighting, mep and bathroom upgrades structural upgrades on (e) slab | $1,210,990 |
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 1 Market St | fitness center for building tenant, not for general public use, build out on level 1 new locker rooms and bathrooms to comply with d.a. checklist requirements, no change in use or exterior scope. no pool, spa & juice barDetails
fitness center for building tenant, not for general public use, build out on level 1 new locker rooms and bathrooms to comply with d.a. checklist requirements, no change in use or exterior scope. no pool, spa & juice bar | $3,000,000 |
| Aug 2, 2022 | Completed final sign-off Mar 2023 | 447 Minna St | revision to pa#202205234784. reconfigure bathroom. no change to number of plumbing fixtures.Details
revision to pa#202205234784. reconfigure bathroom. no change to number of plumbing fixtures. | |
| Apr 12, 2022 | Completed final sign-off Mar 2023 | 555 Mission St | 16th fl - single tenant fl w/approximator of work to be 4000 sf. removal of interior stairs connecting 16th & 17th fl; removal of interior partitions & finishes; new reception, bathroom & copy room; no changes to bathroom or pantry fixtures; 17th fl - removal of int stairs connecting 16th & 17thDetails
16th fl - single tenant fl w/approximator of work to be 4000 sf. removal of interior stairs connecting 16th & 17th fl; removal of interior partitions & finishes; new reception, bathroom & copy room; no changes to bathroom or pantry fixtures; 17th fl - removal of int stairs connecting 16th & 17th | $478,662 |
| Jul 25, 2018 | Completed final sign-off Jan 2020 | 599 Skyline Bl | interior renovation of (e) women's locker room & lounge. renovate to include new finishes, new lighting, & upgrade mep systems. new bathroom at longue, new vertical lift, new steamroom, new whirlpool & additional toilet & shower at locker room. whirlpool/hazmat sep permit.Details
interior renovation of (e) women's locker room & lounge. renovate to include new finishes, new lighting, & upgrade mep systems. new bathroom at longue, new vertical lift, new steamroom, new whirlpool & additional toilet & shower at locker room. whirlpool/hazmat sep permit. | $250,000 |
| Aug 22, 2016 | Completed final sign-off Aug 2017 | 1355 Market St | mep for tenant improvement bathrooms ref arch pa 201607263299Details
mep for tenant improvement bathrooms ref arch pa 201607263299 | $20,000 |
| Apr 18, 2016 | Completed final sign-off Aug 2016 | 160 Spear St | electrical work for bathroom remodel, title 24, ref pa 2016-0203-8736Details
electrical work for bathroom remodel, title 24, ref pa 2016-0203-8736 | $5,000 |
| Dec 9, 2015 | Completed final sign-off May 2017 | 1125 Mission St | revision to pa#201509308464, revision include bathroom design change with corresponding mechanical. n/a ordinance #155-13Details
revision to pa#201509308464, revision include bathroom design change with corresponding mechanical. n/a ordinance #155-13 | $10,000 |
| May 31, 2012 | Completed final sign-off Feb 2013 | 868 Folsom St | selective demolition of interior partitoins, ceilings & floors. new interior ceilings, partitions & floors, additional bathrooms & shower to be built.Details
selective demolition of interior partitoins, ceilings & floors. new interior ceilings, partitions & floors, additional bathrooms & shower to be built. | $680,000 |
| Jun 27, 2011 | Completed final sign-off Mar 2012 | 595 Market St | interior tenant improvement including new partitions and new finishes in tenant space and in common use bathrooms (core).Details
interior tenant improvement including new partitions and new finishes in tenant space and in common use bathrooms (core). | $11,000 |
| Apr 21, 2011 | Completed final sign-off Nov 2011 | 123 Mission St | 9th floor-interior upgrade of restroom including new partions & finishes for accessiblity compliance (bathroom remodel) 9th floorDetails
9th floor-interior upgrade of restroom including new partions & finishes for accessiblity compliance (bathroom remodel) 9th floor | $50,000 |
| Nov 7, 2007 | Completed final sign-off May 2008 | 345 Spear St | 3rd floor: ti remodel (e) office space. build new offices, conf. room and dining area. upgrade (e) bathrooms per ada, build new shower. hvac, electric with energy calcs. sprinkler and life safety under separate permit. kitchen under separate permitDetails
3rd floor: ti remodel (e) office space. build new offices, conf. room and dining area. upgrade (e) bathrooms per ada, build new shower. hvac, electric with energy calcs. sprinkler and life safety under separate permit. kitchen under separate permit | $710,000 |
| Aug 24, 2007 | Completed final sign-off Feb 2008 | 135 Main St | 5/f bathrooms: new 1 hr. rated and non-rated partitions at reconfigured entries, new lighting, plumbing fixtures, toilet partitions, floor drain, restroom accessories, duplex electrical gfi outlet, rated door & frame, glass partition and new finishes.Details
5/f bathrooms: new 1 hr. rated and non-rated partitions at reconfigured entries, new lighting, plumbing fixtures, toilet partitions, floor drain, restroom accessories, duplex electrical gfi outlet, rated door & frame, glass partition and new finishes. | $60,000 |