Back to kitchen remodel contractors
Skyline Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2026
- Last 24 months
- 251 permits filed
3,589 permits since 2000: 2,577 completed, 149 in progress, 492 never finaled, 371 expired or cancelled.
Of the 492 never-finaled permits, 43 are 3 to 5 years old, 236 are 5 to 10 years old, 213 are over 10 years old. 8 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 20 completed, 4 in progress, 3 never finaled. Typically 51 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2026 | In progress issued Jul 2026 | 1 Sansome St | 40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor transition detailsDetails
40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor transition details | |
| Dec 24, 2025 | Completed final sign-off Jul 2026 | 444 De Haro St | 1/f - interior t.i. for latering kitchen and sf dah food service review.Details
1/f - interior t.i. for latering kitchen and sf dah food service review. | $235,000 |
| Dec 17, 2025 | In progress issued Feb 2026 | 1 Sansome St | 26/f: ti including renovations for office layout, restrooms, and break area. mep deferred. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
26/f: ti including renovations for office layout, restrooms, and break area. mep deferred. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $2,068,820 |
| Dec 17, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | 24 & 25th floor; t.i. including interior renovations for office layout, restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
24 & 25th floor; t.i. including interior renovations for office layout, restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $4,137,640 |
| Dec 17, 2025 | In progress issued Feb 2026 | 1 Sansome St | level 40: tenant improvement including interior renovations for office layout, lobby, reception, meeting rooms and restrooms. mep deferred. no finish work, equipment or fixture installation in micro kitchen or food service staff restroom to occur prior to dph approved under deferred permit.Details
level 40: tenant improvement including interior renovations for office layout, lobby, reception, meeting rooms and restrooms. mep deferred. no finish work, equipment or fixture installation in micro kitchen or food service staff restroom to occur prior to dph approved under deferred permit. | $1,285,238 |
| Dec 10, 2025 | In progress issued Feb 2026 | 1 Sansome St | 38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $2,155,982 |
| Jan 16, 2025 | Completed final sign-off Oct 2025 | 720 Terry A Francois Bl | space #28: new interior t.i. inclusive of partitions, ceiling, lighting, finishes, and millwork. new bar area with equipment and millwork. new bar area with equipment and storage area with 3-compartment sink for dishwashing/hot water heater. new ventilation to support kitchen storage/dish area.Details
space #28: new interior t.i. inclusive of partitions, ceiling, lighting, finishes, and millwork. new bar area with equipment and millwork. new bar area with equipment and storage area with 3-compartment sink for dishwashing/hot water heater. new ventilation to support kitchen storage/dish area. | $313,225 |
| Apr 26, 2024 | Completed final sign-off Feb 2025 | 1160 Battery St | 4/f office ti w/pantry located on the east side of building to include replacing (e) partitions, ceilings, and associated mep work. break room, catering kitchen, servery & dining room.Details
4/f office ti w/pantry located on the east side of building to include replacing (e) partitions, ceilings, and associated mep work. break room, catering kitchen, servery & dining room. | $6,800,000 |
| Jul 20, 2023 | Completed final sign-off Oct 2024 | 120 Stockton St | 4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service.Details
4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service. | $5,000 |
| May 12, 2023 | Completed final sign-off Feb 2025 | 120 Stockton St | 5/f kitchen: deferred mep pa# 2022-1221-8887, flrs 4 & 5Details
5/f kitchen: deferred mep pa# 2022-1221-8887, flrs 4 & 5 | $326,880 |
| Dec 21, 2022 | Completed final sign-off Sep 2023 | 120 Stockton St | 4/f & 5/f: buildout of support pantry & service kitchen, partitions, ceilings, fixtures, finishes, kitchen equipment. ref bpa#202211237089 for convene t.i. mep deferred.Details
4/f & 5/f: buildout of support pantry & service kitchen, partitions, ceilings, fixtures, finishes, kitchen equipment. ref bpa#202211237089 for convene t.i. mep deferred. | $250,000 |
| Apr 15, 2022 | Completed final sign-off Feb 2025 | 945 Market St | interior fit out to existing space on levels one (l1) and two (l2) including a dining hall (a-2) assembly associated with commericial kitchen and other support areas and cooking school on l2 (b-business). structural, mep and food service included.Details
interior fit out to existing space on levels one (l1) and two (l2) including a dining hall (a-2) assembly associated with commericial kitchen and other support areas and cooking school on l2 (b-business). structural, mep and food service included. | $1,200,000 |
| Jun 9, 2021 | Completed final sign-off Dec 2021 | 199 Fremont St | demo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electrDetails
demo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electr | $3,000,000 |
| Sep 28, 2020 | Never finaled issued Mar 2021, no final | 188 Spear St | 7/f: revision to pa#201912058721 to add banquette seating near kitchenette, addition of power @ alternate workspaces & phone booth locations.Details
7/f: revision to pa#201912058721 to add banquette seating near kitchenette, addition of power @ alternate workspaces & phone booth locations. | |
| Jul 22, 2020 | Completed final sign-off Oct 2021 | 101 Mission St | office t.i.; minor structural, small kitchen, removal of non structural partitions, acoustical ceilings, architectural finishes and caseworkDetails
office t.i.; minor structural, small kitchen, removal of non structural partitions, acoustical ceilings, architectural finishes and casework | $2,500,000 |
| Feb 5, 2020 | Completed final sign-off Dec 2020 | 225 Bush St | new kitchen equipment placement and finishes. m.e. p under separate permitDetails
new kitchen equipment placement and finishes. m.e. p under separate permit | $150,000 |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 135 Main St | ti suite 550-1)adding a glass division and wood door. 2)extend 2 walls in meeting room. 3)adding a counter in kitchen area (island)- sprinklers, fire alarm and mep separate permit.Details
ti suite 550-1)adding a glass division and wood door. 2)extend 2 walls in meeting room. 3)adding a counter in kitchen area (island)- sprinklers, fire alarm and mep separate permit. | $138,000 |
| Oct 28, 2014 | Completed final sign-off Dec 2014 | 505 Howard St | mechanical work for tenant improvement on the 1st floor. kitchen area only. t.i. pa# 201404284312. n/a ordinance #155-13Details
mechanical work for tenant improvement on the 1st floor. kitchen area only. t.i. pa# 201404284312. n/a ordinance #155-13 | $4,000 |
| Apr 28, 2014 | Completed final sign-off Dec 2014 | 505 Howard St | t.i. to include addition of casework, countertops, kitchen equipment pass through egress. dropped ceiling with mep under seperate permit.Details
t.i. to include addition of casework, countertops, kitchen equipment pass through egress. dropped ceiling with mep under seperate permit. | $36,000 |
| Apr 21, 2014 | Never finaled issued May 2014, no final | 505 Howard St | 1st floor:t.i. include small conference room, office area with small kitchen and bicycle storage room. n/a for the maher ordinance #155-13Details
1st floor:t.i. include small conference room, office area with small kitchen and bicycle storage room. n/a for the maher ordinance #155-13 | $292,250 |
| Sep 30, 2013 | Completed final sign-off Mar 2014 | 501 02nd St | tenant improvement to include new non structural partitions, new finishes, relocation of existing lighting, new kitchen cabinets, appliances & fixtures. new conference room.Details
tenant improvement to include new non structural partitions, new finishes, relocation of existing lighting, new kitchen cabinets, appliances & fixtures. new conference room. | $500,000 |
| Mar 8, 2013 | Completed final sign-off Jun 2013 | 85 02nd St | demo of limited non structural partitions. modify cabinetry in existing kitchenette. mep and life safety under separate permitDetails
demo of limited non structural partitions. modify cabinetry in existing kitchenette. mep and life safety under separate permit | $100,000 |
| Feb 29, 2012 | Completed final sign-off Mar 2013 | 185 Berry St | revision to pa# 2011-1122-9432 & 2011-0811-2222-structural floor at roof penetrations for commercial kitchen equipmentDetails
revision to pa# 2011-1122-9432 & 2011-0811-2222-structural floor at roof penetrations for commercial kitchen equipment | $10,000 |
| Dec 16, 2011 | Completed final sign-off Mar 2013 | 185 Berry St | 4th floor-mechanical, electrical, plumbing work for commercial kitchen. refer to pa# 2011-1122-9432Details
4th floor-mechanical, electrical, plumbing work for commercial kitchen. refer to pa# 2011-1122-9432 | $150,000 |
| Nov 22, 2011 | Completed final sign-off May 2012 | 185 Berry St | new 1500 square foot commercial kitchen. new non structural partitions, new equipment and finishes as required by health dept. ti 201108112222Details
new 1500 square foot commercial kitchen. new non structural partitions, new equipment and finishes as required by health dept. ti 201108112222 | $350,000 |
| Dec 14, 2007 | Completed final sign-off Apr 2008 | 345 Spear St | 2nd & 3rd floor - 3rd floor: t.i. of (e) office space for new kitchen & cafeteria (servery) work includes new kitchen with equipment fixtures, finishes, partitions & doors. new mechanical, life safety & fire protection under separate permit, 2nd floor: grease-trap room to be included.Details
2nd & 3rd floor - 3rd floor: t.i. of (e) office space for new kitchen & cafeteria (servery) work includes new kitchen with equipment fixtures, finishes, partitions & doors. new mechanical, life safety & fire protection under separate permit, 2nd floor: grease-trap room to be included. | $320,000 |
| Nov 7, 2007 | Completed final sign-off May 2008 | 345 Spear St | 3rd floor: ti remodel (e) office space. build new offices, conf. room and dining area. upgrade (e) bathrooms per ada, build new shower. hvac, electric with energy calcs. sprinkler and life safety under separate permit. kitchen under separate permitDetails
3rd floor: ti remodel (e) office space. build new offices, conf. room and dining area. upgrade (e) bathrooms per ada, build new shower. hvac, electric with energy calcs. sprinkler and life safety under separate permit. kitchen under separate permit | $710,000 |