Skyline Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2026
- Last 24 months
- 250 permits filed
3,588 permits since 2000: 2,577 completed, 148 in progress, 492 never finaled, 371 expired or cancelled.
Of the 492 never-finaled permits, 43 are 3 to 5 years old, 236 are 5 to 10 years old, 213 are over 10 years old. 8 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
102 stairs permits: 62 completed, 12 in progress, 26 never finaled, 2 expired or cancelled. Typically 38 days from filing to permit and 284 days from permit to final inspection.
Showing the 100 most recent of 102.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 55 Spear St | 29th floor: non-structural partitions, ceiling, lighting & mep &mep. (e) convenience stair to be re-finish.Details
29th floor: non-structural partitions, ceiling, lighting & mep &mep. (e) convenience stair to be re-finish. | $3,646,268 |
| Aug 24, 2026 | In progress issued Aug 2026 | 555 California St | deferred structural calculations & details for new handrail at stair previously approved pa#202603238106.Details
deferred structural calculations & details for new handrail at stair previously approved pa#202603238106. | |
| Jul 22, 2026 | In progress issued Aug 2026 | 55 Spear St | l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landingDetails
l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landing | $715,000 |
| Jul 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | 29 & 30 flr: deferred structural submittal includes str support for (1) fire shutter door installed on 28/f, support on 29 flr includes str support for decorative chandelier suspended above communicting stairs between 28/f & 29/f, supported on 30/f. ref #20251129399 & 202512101397Details
29 & 30 flr: deferred structural submittal includes str support for (1) fire shutter door installed on 28/f, support on 29 flr includes str support for decorative chandelier suspended above communicting stairs between 28/f & 29/f, supported on 30/f. ref #20251129399 & 202512101397 | |
| Apr 28, 2026 | In progress issued Aug 2026 | 301 Toland St | work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; new canopy; new egress stair and exterior door; new topping slab; footings, for fixture vehicular liftDetails
work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; new canopy; new egress stair and exterior door; new topping slab; footings, for fixture vehicular lift | $300,000 |
| Apr 13, 2026 | In progress issued Apr 2026 | 555 California St | 30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office spaceDetails
30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office space | $1,250,000 |
| Apr 10, 2026 | In progress issued Jun 2026 | 1 Embarcadero Center | 31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit.Details
31/f: interior tenant improvement. related mechanical, electrical and plumbing modifications. limited area of floor slab demolition is included in this scope for a non-egress stair under seperate permit. | $2,750,000 |
| Oct 28, 2025 | In progress issued Nov 2025 | 1 Maritime Pz | interconnecting accessory (non-egress) stairs between levels 17 & 18Details
interconnecting accessory (non-egress) stairs between levels 17 & 18 | $65,700 |
| Oct 28, 2025 | In progress issued Nov 2025 | 300 Clay St | interconnecting accessory (non-egress) stairs between levels 18 and 19.Details
interconnecting accessory (non-egress) stairs between levels 18 and 19. | $113,150 |
| Sep 17, 2025 | In progress issued Oct 2025 | 1 Sansome St | addition of (n) communicating stair connecting levels 28 and 29 to include installation of non rated smoke barriers at both levels, partition doors, and finishes with stair enclosureDetails
addition of (n) communicating stair connecting levels 28 and 29 to include installation of non rated smoke barriers at both levels, partition doors, and finishes with stair enclosure | $1,200,000 |
| Apr 24, 2025 | In progress issued May 2025 | 405 Howard St | 7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring.Details
7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring. | $172,000 |
| Mar 3, 2025 | In progress issued May 2025 | 1155 Battery St | revision to pa#2024-0705-5905 to revise entry portal header, level landing and deffered structural for stairsDetails
revision to pa#2024-0705-5905 to revise entry portal header, level landing and deffered structural for stairs | |
| Jan 17, 2025 | Completed final sign-off Feb 2026 | 1160 Battery St | 4th fl modification to stair enclosure. modified deck pavers & trellis at roof deckDetails
4th fl modification to stair enclosure. modified deck pavers & trellis at roof deck | $100,000 |
| Dec 2, 2024 | Completed final sign-off Nov 2025 | 1155 Battery St | level 1: demo e) storefront, alter e) landscape. n) entry & storefront & landscaping w/ walkway & stairDetails
level 1: demo e) storefront, alter e) landscape. n) entry & storefront & landscaping w/ walkway & stair | $300,000 |
| Oct 2, 2024 | Completed final sign-off Jun 2025 | 45 Fremont St | work on 33rd flr. demo of existing conference froom. demo of slab between 33 and 34 flr. constructino of single level stair connection. minor mepDetails
work on 33rd flr. demo of existing conference froom. demo of slab between 33 and 34 flr. constructino of single level stair connection. minor mep | $110,000 |
| Jul 5, 2024 | In progress issued Aug 2024 | 1155 Battery St | 1/f: demo (e) storefront and replace with (n) entry doors. (n) non-accessible exterior stair and vestibule.Details
1/f: demo (e) storefront and replace with (n) entry doors. (n) non-accessible exterior stair and vestibule. | $150,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 535 Mission St | installation of non egress inter connecting stairway between 24th and 25th fl. revision to 202403208246. defer mep and life safety system under sep permitDetails
installation of non egress inter connecting stairway between 24th and 25th fl. revision to 202403208246. defer mep and life safety system under sep permit | $200,000 |
| Feb 8, 2024 | Completed final sign-off Sep 2024 | 450 Pacific Av | structural revisio to 202308154476 includes revisions to stair footing due to unforseen buried existing conduit. no changes to special inspection requirments.Details
structural revisio to 202308154476 includes revisions to stair footing due to unforseen buried existing conduit. no changes to special inspection requirments. | |
| Dec 15, 2023 | Completed final sign-off Jan 2025 | 560 Mission St | removal of interconnecting stairway from 11th to 12th floor, infilling slab and installation of finishes.Details
removal of interconnecting stairway from 11th to 12th floor, infilling slab and installation of finishes. | $146,160 |
| Oct 25, 2023 | Completed final sign-off May 2024 | 420 Montgomery St | stair replacement @ 2nd fl roof and machine room roofDetails
stair replacement @ 2nd fl roof and machine room roof | $220,000 |
| Aug 31, 2023 | Completed final sign-off Jul 2025 | 828 Brannan St | deferred interior stair permit for issued bpa 202101122525Details
deferred interior stair permit for issued bpa 202101122525 | |
| Jul 17, 2023 | Completed final sign-off Sep 2024 | 450 Pacific Av | 1/f-4/f: selective interior demo, constr of communicating stairways, interior partitions, ceilings, floor finishes, wall finishes, millwork, mechanical, plumbing. electrical & structural deferred. no exterior modifications.Details
1/f-4/f: selective interior demo, constr of communicating stairways, interior partitions, ceilings, floor finishes, wall finishes, millwork, mechanical, plumbing. electrical & structural deferred. no exterior modifications. | $10,840,867 |
| May 1, 2023 | Completed final sign-off Nov 2024 | 1 Embarcadero Center | 26/f & 27/f: new stair connection between floorsDetails
26/f & 27/f: new stair connection between floors | $78,000 |
| Feb 23, 2023 | Completed final sign-off Jan 2024 | 88 Kearny St | 10th and 11th floors: revision to pa#202209222936 remove nw stair between 10th and 11th floor. stair opening to be infilled. revised smoke control to removed revisions for new stair openingDetails
10th and 11th floors: revision to pa#202209222936 remove nw stair between 10th and 11th floor. stair opening to be infilled. revised smoke control to removed revisions for new stair opening | |
| Sep 22, 2022 | Completed final sign-off Jan 2024 | 88 Kearny St | new communicatiimg stairs btw 10th & 11th fl, demo of the floor for stair opening, new stair structure elements to support new stairDetails
new communicatiimg stairs btw 10th & 11th fl, demo of the floor for stair opening, new stair structure elements to support new stair | $175,000 |
| Jul 11, 2022 | Completed final sign-off Jul 2024 | 1 Market St | corporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements.Details
corporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements. | $4,000,000 |
| Jul 5, 2022 | Completed final sign-off Jul 2024 | 1 Market St | corporate office build out level 23. installation of new 1 hour corridor between exist stair entrances. demo and remodel existing core restrooms to comly with da checklist requirements. no change in use or exterior scope, area remains businessDetails
corporate office build out level 23. installation of new 1 hour corridor between exist stair entrances. demo and remodel existing core restrooms to comly with da checklist requirements. no change in use or exterior scope, area remains business | $10,000,000 |
| May 20, 2022 | Completed final sign-off Sep 2022 | 855 Geary St | two new vehicle lifts at basement level, and ada stair handrail upgrades. lifts are for maintenance only. no addition of new parking or alteration of striping approved under pa# 202204071820.Details
two new vehicle lifts at basement level, and ada stair handrail upgrades. lifts are for maintenance only. no addition of new parking or alteration of striping approved under pa# 202204071820. | $45,000 |
| May 11, 2022 | Completed final sign-off Jul 2024 | 1 Market St | 23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope.Details
23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope. | $500,000 |
| Apr 12, 2022 | Completed final sign-off Mar 2023 | 555 Mission St | 16th fl - single tenant fl w/approximator of work to be 4000 sf. removal of interior stairs connecting 16th & 17th fl; removal of interior partitions & finishes; new reception, bathroom & copy room; no changes to bathroom or pantry fixtures; 17th fl - removal of int stairs connecting 16th & 17thDetails
16th fl - single tenant fl w/approximator of work to be 4000 sf. removal of interior stairs connecting 16th & 17th fl; removal of interior partitions & finishes; new reception, bathroom & copy room; no changes to bathroom or pantry fixtures; 17th fl - removal of int stairs connecting 16th & 17th | $478,662 |
| Dec 20, 2021 | Completed final sign-off Feb 2025 | 945 Market St | core and shell alteration to (e) retail space inclduing service lifts, stairs, restrooms, entry door @ exterior/ramp, interior wall/interior store front/interior doors & limited interior walls/overhead doors where structural framing is req'd. no change of occupancy.Details
core and shell alteration to (e) retail space inclduing service lifts, stairs, restrooms, entry door @ exterior/ramp, interior wall/interior store front/interior doors & limited interior walls/overhead doors where structural framing is req'd. no change of occupancy. | $1,100,000 |
| Feb 3, 2021 | Never finaled issued Apr 2021, no final | 40 Jessie St | level 1: add new security door at lobby. / level 2: add new security door at stair & new mdf room. / level 5: convert (e) work room to idf room & convert storage room to work room. mechanical & electrical included.Details
level 1: add new security door at lobby. / level 2: add new security door at stair & new mdf room. / level 5: convert (e) work room to idf room & convert storage room to work room. mechanical & electrical included. | $800,000 |
| Jan 12, 2021 | Completed final sign-off Oct 2025 | 828 Brannan St | interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exteriorDetails
interior walls and floor slab. new two story ground up base. building including exterior facade, elevator, stairs, and restrooms. renovation to (e) 2 story & mezzanine. rmove an interior mezzanine horizontally & vertically expand the 2nd floor & undertake interior & exterior | $12,000,000 |
| Jan 11, 2021 | Completed final sign-off Feb 2021 | 215 Leidesdorff St | interior t.i. scope includes new demising wall to separate the 3rd and 4th floors. demising wall will be located on 3rd floor at bottom of an extg interior connection stair. no structural; change in occupancy; or use/area.Details
interior t.i. scope includes new demising wall to separate the 3rd and 4th floors. demising wall will be located on 3rd floor at bottom of an extg interior connection stair. no structural; change in occupancy; or use/area. | $12,000 |
| Jan 11, 2021 | Completed final sign-off Mar 2022 | 3 Embarcadero Center | handrail for new stair at 20th floor. ref app#202008131714Details
handrail for new stair at 20th floor. ref app#202008131714 | $10,000 |
| Sep 25, 2020 | Completed final sign-off May 2021 | 405 Howard St | revision to service hub layout near exit stairs #1 & #3 on 4th, 5th, 6th floors previously approved under pa #2019-0820-9311, 2019-0925-2631, & 2019-1031-6117 requested by fire dept. reverify occupnat loadfor all assembly rooms on all 3 floors.Details
revision to service hub layout near exit stairs #1 & #3 on 4th, 5th, 6th floors previously approved under pa #2019-0820-9311, 2019-0925-2631, & 2019-1031-6117 requested by fire dept. reverify occupnat loadfor all assembly rooms on all 3 floors. | $80,000 |
| Sep 19, 2020 | Never finaled issued Jun 2021, no final | 3 Embarcadero Center | slab reinforcement on floors 20-22. reinforcement for stair opening. stairs under separate permit.Details
slab reinforcement on floors 20-22. reinforcement for stair opening. stairs under separate permit. | $45,000 |
| Sep 2, 2020 | Completed final sign-off Apr 2022 | 301 Howard St | tenant improvement on 20th & 21st fl to include demolition of existing partition. new interior partirions, ceiling, wall and floor finishes. structural work to enlarge existing stair opening.Details
tenant improvement on 20th & 21st fl to include demolition of existing partition. new interior partirions, ceiling, wall and floor finishes. structural work to enlarge existing stair opening. | $5,524,278 |
| Aug 13, 2020 | Never finaled issued Jul 2021, no final | 3 Embarcadero Center | new communicating stairs between 20th & 21st floor.Details
new communicating stairs between 20th & 21st floor. | $250,000 |
| Jun 24, 2020 | Completed final sign-off Oct 2021 | 303 02nd St | ti of existing office space on the entire 10th fl. work includes non-structural partitions, mep, finishes, and re-cladding of an (e) communicating stair.Details
ti of existing office space on the entire 10th fl. work includes non-structural partitions, mep, finishes, and re-cladding of an (e) communicating stair. | $8,249,316 |
| May 28, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | 17/f: construction of conference spaces, collaboration space, break room. all alteration interior only. (e) service core elements including stairs, elevators & mep shafts to remain, fire life safety under sep permit. maher n/a.Details
17/f: construction of conference spaces, collaboration space, break room. all alteration interior only. (e) service core elements including stairs, elevators & mep shafts to remain, fire life safety under sep permit. maher n/a. | $3,200,000 |
| Mar 16, 2020 | Completed final sign-off Apr 2021 | 300 Mission St | 16/f: construction of conference spaces, collaboration space. all alteration interior only. (e) service core elecments including stairs, elevators & mep shafts to remain, fire left safety under sep permit. maher n/a.Details
16/f: construction of conference spaces, collaboration space. all alteration interior only. (e) service core elecments including stairs, elevators & mep shafts to remain, fire left safety under sep permit. maher n/a. | $3,200,000 |
| Feb 12, 2020 | Completed final sign-off Oct 2020 | 525 Market St | this project includes the demolition of internal communicating stair and infill and associated structural adjacent partitions and construction of new infill slab and framing (28th & 29th floors)Details
this project includes the demolition of internal communicating stair and infill and associated structural adjacent partitions and construction of new infill slab and framing (28th & 29th floors) | $50,000 |
| Feb 10, 2020 | Completed final sign-off May 2021 | 405 Howard St | install a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt slab on 5th & 6th floors. detension & retension pt frp strengthing. ** maher: n/a **Details
install a new stairway to connect 4th, 5th & 6th floors. revision to approved pa# 2019/10/31/6117, pa# 2019/09/25/2631 & pa# 2019/08/20/9311 (4th, 5th & 6th floor t.i. work) new opening in (e) pt slab on 5th & 6th floors. detension & retension pt frp strengthing. ** maher: n/a ** | |
| Feb 6, 2020 | Completed final sign-off May 2021 | 405 Howard St | revision to pa #201910316117, 201909252631, 201908209311 for 4th, 5th, & 6th ti improvement work. structural dmolition of 6th& 5th fl floors for future stairway and provide 2-hr fire rated shaft enclosure.Details
revision to pa #201910316117, 201909252631, 201908209311 for 4th, 5th, & 6th ti improvement work. structural dmolition of 6th& 5th fl floors for future stairway and provide 2-hr fire rated shaft enclosure. | $100,000 |
| Jan 10, 2020 | Completed final sign-off Feb 2021 | 525 Market St | rev to pa# 201909171850; revise structural details for 35th & 36th fl. landing/rail connection and stair post connection detailDetails
rev to pa# 201909171850; revise structural details for 35th & 36th fl. landing/rail connection and stair post connection detail | |
| Dec 18, 2019 | Never finaled issued Feb 2020, no final | 150 Minna St | 1st & 2nd floors: new 3 level convenience stair from basement to 2nd floorDetails
1st & 2nd floors: new 3 level convenience stair from basement to 2nd floor | $1,500,000 |
| Nov 12, 2019 | Completed final sign-off Jun 2021 | 101 02nd St | new non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safetyDetails
new non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safety | $8,250,000 |
| Sep 25, 2019 | Completed final sign-off Feb 2022 | 405 Howard St | 5th floor. full single tenant. horizontal exit, intervening stairs, fire alarm, sprinklers, new smoke control, fire life safety, and mep will be under a seperate permit. **maher n/a**Details
5th floor. full single tenant. horizontal exit, intervening stairs, fire alarm, sprinklers, new smoke control, fire life safety, and mep will be under a seperate permit. **maher n/a** | $6,355,000 |
| Sep 17, 2019 | Never finaled issued Oct 2019, no final | 525 Market St | 35th and 36th floors - modifications to existing ti convenience steel stair between 35th and 36th floor. work include demo, (n) glass railings and gypsum board headers). maher n/aDetails
35th and 36th floors - modifications to existing ti convenience steel stair between 35th and 36th floor. work include demo, (n) glass railings and gypsum board headers). maher n/a | $200,000 |
| Aug 20, 2019 | Completed final sign-off Feb 2022 | 405 Howard St | 6/fl. full fl single tenant. create horizontal exit. access control drs, intervening stairs,occupant load inc. fire alarm,sprinklers,new smoke ctrl design,2-waycomm,&evac signs on sep permits. revise evac plan for chg to a partial evac req on sep base bldg permit. maher n/a.Details
6/fl. full fl single tenant. create horizontal exit. access control drs, intervening stairs,occupant load inc. fire alarm,sprinklers,new smoke ctrl design,2-waycomm,&evac signs on sep permits. revise evac plan for chg to a partial evac req on sep base bldg permit. maher n/a. | $6,355,000 |
| Jun 12, 2019 | Never finaled issued Aug 2019, no final | 303 02nd St | 7th and 8th flr, t.i. (n) conviece stair connecting floors 7 and 8.Details
7th and 8th flr, t.i. (n) conviece stair connecting floors 7 and 8. | $50,000 |
| May 1, 2019 | Completed final sign-off Jan 2020 | 333 Bush St | partial floor ti new non load bearing partitions, upgrade exit stairs & vestibule doors with panic hardware, mep & fire/life safety under sep permit.Details
partial floor ti new non load bearing partitions, upgrade exit stairs & vestibule doors with panic hardware, mep & fire/life safety under sep permit. | $805,000 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 153 Townsend St | revision to pa #201809196734, to enclose 6th fl stairs.Details
revision to pa #201809196734, to enclose 6th fl stairs. | |
| Nov 5, 2018 | Never finaled issued Nov 2018, no final | 525 Market St | 33rd flr. stair infillDetails
33rd flr. stair infill | $5,000 |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 350 Bush St | 3rd flr. revision to pa.201706270424, add door and convenience stairDetails
3rd flr. revision to pa.201706270424, add door and convenience stair | $15,000 |
| Sep 19, 2018 | Never finaled issued Oct 2018, no final | 153 Townsend St | rev to (e) communicating stair. demo (e) stairs between 9&8 flrs. create (n) openings from 8-6 flrs. construct (n) communicating stairs between 9 & 6th flrs with new finishes, hand rails & guard rails. maher n/a.Details
rev to (e) communicating stair. demo (e) stairs between 9&8 flrs. create (n) openings from 8-6 flrs. construct (n) communicating stairs between 9 & 6th flrs with new finishes, hand rails & guard rails. maher n/a. | $1,100,000 |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 201 03rd St | 11th fl - demo of existing communication stair, handrails, guardrals, structural stell concrete floor slab, drywall, soffits, non-load bearing partitions. new construction of concrete floor slab. maher n/a.Details
11th fl - demo of existing communication stair, handrails, guardrals, structural stell concrete floor slab, drywall, soffits, non-load bearing partitions. new construction of concrete floor slab. maher n/a. | $355,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 560 Mission St | 11th/12th flr - new stair between 11th & 12th maher naDetails
11th/12th flr - new stair between 11th & 12th maher na | $150,000 |
| Apr 3, 2018 | Never finaled issued May 2018, no final | 116 New Montgomery St | 7th floor: revision to app#201802050348 to show extg won door at stair and revised 90 min. door to 20 min.. ref app#201805050348. n/a for maherDetails
7th floor: revision to app#201802050348 to show extg won door at stair and revised 90 min. door to 20 min.. ref app#201805050348. n/a for maher | |
| Mar 29, 2018 | Never finaled issued Apr 2018, no final | 101 01st St | 49th & 50th communication stair, structural only cutting hole on 5th flr, ref 50th flr ti 201802272306 and 49th flr ti maher naDetails
49th & 50th communication stair, structural only cutting hole on 5th flr, ref 50th flr ti 201802272306 and 49th flr ti maher na | $214,091 |
| Mar 22, 2018 | Completed final sign-off Jun 2018 | 650 California St | 10th and 11th floor: new communicating stair between 10th and 11th floor. ref app#201711083445 and 201711083449Details
10th and 11th floor: new communicating stair between 10th and 11th floor. ref app#201711083445 and 201711083449 | $80,000 |
| Feb 27, 2018 | Completed final sign-off Sep 2021 | 657 Mission St | merge lots and merge 2 adjacent buildings into a single parcel. 657 mission is type 1b & 667 mission is type 3b. improvements will include (n) cores w/ egress stairs & restrooms,(n)storefronts,roof deck,3 hours horizontal exits between buildings & mep systems. ** maher: n/a **Details
merge lots and merge 2 adjacent buildings into a single parcel. 657 mission is type 1b & 667 mission is type 3b. improvements will include (n) cores w/ egress stairs & restrooms,(n)storefronts,roof deck,3 hours horizontal exits between buildings & mep systems. ** maher: n/a ** | $30,000,000 |
| Jan 10, 2018 | Never finaled issued Feb 2018, no final | 560 Mission St | structural demo and new folding door and unenclosed internal connecting stair between 12th & 13th flr maher naDetails
structural demo and new folding door and unenclosed internal connecting stair between 12th & 13th flr maher na | $117,000 |
| Jan 4, 2018 | Never finaled issued Mar 2018, no final | 525 Market St | stairwell 25-26-27/f: modifications to (e) tenant interior interconnecting steel stairs between 25, 26 & 27, work includes demolition, new glass railings, gypsum board headers.Details
stairwell 25-26-27/f: modifications to (e) tenant interior interconnecting steel stairs between 25, 26 & 27, work includes demolition, new glass railings, gypsum board headers. | $30,000 |
| Dec 27, 2017 | Completed final sign-off Oct 2020 | 657 Mission St | soft demo of interior partitions, doors, frames, hardware, floor, wall finishes. existing elevator shafts/lobbies, stairs, fire enclosures to remain. no exterior work ab017; n/a maherDetails
soft demo of interior partitions, doors, frames, hardware, floor, wall finishes. existing elevator shafts/lobbies, stairs, fire enclosures to remain. no exterior work ab017; n/a maher | $100,000 |
| Dec 27, 2017 | Completed final sign-off Oct 2020 | 667 Mission St | remove e interior partitions, doors, frames, hardware floor, wall finishes. e elevator shft lobbies, stairs, fire enclosures to remain. no exterior work. ab017. n/a maherDetails
remove e interior partitions, doors, frames, hardware floor, wall finishes. e elevator shft lobbies, stairs, fire enclosures to remain. no exterior work. ab017. n/a maher | $75,000 |
| Sep 27, 2017 | Completed final sign-off Apr 2018 | 1201 Bryant St | t.i. includes construction of new interior communicating stairs(not egress stairs) and added roof beam and sleepers for future mechanical equipment. n/a for maherDetails
t.i. includes construction of new interior communicating stairs(not egress stairs) and added roof beam and sleepers for future mechanical equipment. n/a for maher | $500,000 |
| Jul 14, 2017 | Never finaled issued Oct 2017, no final | 415 Mission St | 47, 48 and 49th floor - structural stair for architectural permits ref pa 2017-0517-6809, 2017-0517-6807 and 2017-0517-6810Details
47, 48 and 49th floor - structural stair for architectural permits ref pa 2017-0517-6809, 2017-0517-6807 and 2017-0517-6810 | |
| May 30, 2017 | Completed final sign-off Jan 2018 | 1201 Bryant St | minor demo of (e) partitions in prep for ti. minor structural demo of new openings related to future stairs, railings & mech shaft maher na under ab-017. building not to be occupied until ti work completed.Details
minor demo of (e) partitions in prep for ti. minor structural demo of new openings related to future stairs, railings & mech shaft maher na under ab-017. building not to be occupied until ti work completed. | $40,000 |
| May 17, 2017 | Never finaled issued Jun 2017, no final | 415 Mission St | 49th floor 1st time build out t.i. inclunding new non-structural partitions, building is fully sprinklered. structural for communication stair under separate permit. mep, life safety & sprinkler work under separate permit.Details
49th floor 1st time build out t.i. inclunding new non-structural partitions, building is fully sprinklered. structural for communication stair under separate permit. mep, life safety & sprinkler work under separate permit. | $1,980,000 |
| May 17, 2017 | Never finaled issued Jun 2017, no final | 415 Mission St | 47th floor: 1st time build out. t.i. includes new non-structural partitions:bldg is fully sprinklered. structural for communication stair under seperate permit. meps, life safty & sprinklers under seperate permit. n/a for maher.Details
47th floor: 1st time build out. t.i. includes new non-structural partitions:bldg is fully sprinklered. structural for communication stair under seperate permit. meps, life safty & sprinklers under seperate permit. n/a for maher. | $1,980,000 |
| May 17, 2017 | Never finaled issued Jun 2017, no final | 415 Mission St | 48th floor 1st time build out t.i. inclunding new non-structural partitions, building is fully sprinklered. installation and structural for communication stair under separate permit. mep, life safety & sprinkler work under separate permit.Details
48th floor 1st time build out t.i. inclunding new non-structural partitions, building is fully sprinklered. installation and structural for communication stair under separate permit. mep, life safety & sprinkler work under separate permit. | $1,980,000 |
| Aug 4, 2016 | Never finaled issued Aug 2016, no final | 855 Front St | selective demolition of interior existing non-structural partitions, ceilings, mezzanine and stairway. no structural, mechanical & electrical or plumbing demolition work; maher n/a. ti under separate permit. ab-017 applies.Details
selective demolition of interior existing non-structural partitions, ceilings, mezzanine and stairway. no structural, mechanical & electrical or plumbing demolition work; maher n/a. ti under separate permit. ab-017 applies. | $10,000 |
| Mar 30, 2016 | Completed final sign-off Jan 2017 | 600 Townsend St | 5th floor: structural for interior stair infill. maher naDetails
5th floor: structural for interior stair infill. maher na | $10,000 |
| Jan 21, 2016 | Completed final sign-off Jul 2016 | 160 Spear St | 16th floor tenant improvement - new offices, conference room & break room. new lighting & finishes throughout. fire life safety & sprinkler under separate permit. interconnecting stair is under separate permit. n/a maher ordinanceDetails
16th floor tenant improvement - new offices, conference room & break room. new lighting & finishes throughout. fire life safety & sprinkler under separate permit. interconnecting stair is under separate permit. n/a maher ordinance | $1,200,000 |
| Dec 21, 2015 | Never finaled issued Jun 2016, no final | 160 Spear St | extension of stair from 17th floor to 16th floor- new smoke controll report for this work and entire building- ti for floors separate permits. n/a for maher ordinance no. 155-13.Details
extension of stair from 17th floor to 16th floor- new smoke controll report for this work and entire building- ti for floors separate permits. n/a for maher ordinance no. 155-13. | $140,000 |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 3 Embarcadero Center | install convenience stair between floors 3 and 4Details
install convenience stair between floors 3 and 4 | $100,000 |
| Nov 2, 2015 | Completed final sign-off Mar 2017 | 1125 Mission St | change of use from (e) s-2 parking & storage building to a b-office building, scope includes construction of (n) mezzanine & stairs, (n) store front glazing, (n) window replacement of (e) windows and sidewalk improvement. n/a ordinance# 155-13Details
change of use from (e) s-2 parking & storage building to a b-office building, scope includes construction of (n) mezzanine & stairs, (n) store front glazing, (n) window replacement of (e) windows and sidewalk improvement. n/a ordinance# 155-13 | $350,000 |
| Oct 27, 2015 | Never finaled issued Nov 2015, no final | 333 Bush St | 33rd & 34th floors: reference pa 2015 1007 9067 & 2015 10079070: structural for convenience stair between stories.Details
33rd & 34th floors: reference pa 2015 1007 9067 & 2015 10079070: structural for convenience stair between stories. | $40,000 |
| Sep 30, 2015 | Completed final sign-off Mar 2017 | 1125 Mission St | core and shell improvement to (e) 3 level parking and storage structure. scope includes construction of new restrooms on all levels, egress stairs, mezzanine and stairs, and mepDetails
core and shell improvement to (e) 3 level parking and storage structure. scope includes construction of new restrooms on all levels, egress stairs, mezzanine and stairs, and mep | $750,000 |
| Feb 23, 2015 | Completed final sign-off Apr 2017 | 27 Maiden Ln | revision to 2015-0128-6852; to add structural details for new stairs. roof details no maher req'dDetails
revision to 2015-0128-6852; to add structural details for new stairs. roof details no maher req'd | |
| Jan 22, 2015 | Completed final sign-off Sep 2015 | 1 Embarcadero Center | interior improvements on the 39th fl. emoveal of select partition and finishes on the 39th fl. removal of partitions of 40th fl slav. new inter office stair. non structural partitions, ceiling. n/a for maherDetails
interior improvements on the 39th fl. emoveal of select partition and finishes on the 39th fl. removal of partitions of 40th fl slav. new inter office stair. non structural partitions, ceiling. n/a for maher | $150,000 |
| Dec 22, 2014 | Completed final sign-off Jul 2015 | 160 Spear St | revision tp pa #2014/0627/9708. interconnecting stair from 17 to 18th floors.Details
revision tp pa #2014/0627/9708. interconnecting stair from 17 to 18th floors. | |
| Nov 19, 2014 | Expired or cancelled withdrawn Feb 2015 | 505 Howard St | 8th,9th and 10th floor: construction of non-egress communicating stairs connecting 3 floors. maher n/a.Details
8th,9th and 10th floor: construction of non-egress communicating stairs connecting 3 floors. maher n/a. | $200,000 |
| Jun 27, 2014 | Completed final sign-off Jul 2015 | 160 Spear St | create interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required **Details
create interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required ** | $260,000 |
| Jun 23, 2014 | Completed final sign-off Aug 2016 | 703 Market St | enclose basement passenger elevator lobby and remove accessibility barriers by constructing accessible ramp and stairs.Details
enclose basement passenger elevator lobby and remove accessibility barriers by constructing accessible ramp and stairs. | $41,490 |
| Jun 17, 2014 | Never finaled issued Oct 2014, no final | 405 Howard St | floors: 4,5,10 & 11: provide new motor & vfd for existing smoke exhaust fans on 10 & ll, necessitated by opening stairway between floors 4 & 5. n/a for maher ordinance.Details
floors: 4,5,10 & 11: provide new motor & vfd for existing smoke exhaust fans on 10 & ll, necessitated by opening stairway between floors 4 & 5. n/a for maher ordinance. | $10,000 |
| Feb 28, 2014 | Completed final sign-off Feb 2015 | 425 California St | t.i. full 10/f: selective demo. (n) ceiling/lighting, power/data/finishes, full demo of restrooms & (n) accessible restroom for barrier removal with (n) ceiling, lights, power,data & finishes. interior connecting staircase between 10/f & 11/f for same tenant. 11/f: minor work at (n) staircase area.Details
t.i. full 10/f: selective demo. (n) ceiling/lighting, power/data/finishes, full demo of restrooms & (n) accessible restroom for barrier removal with (n) ceiling, lights, power,data & finishes. interior connecting staircase between 10/f & 11/f for same tenant. 11/f: minor work at (n) staircase area. | $300,000 |
| Feb 25, 2014 | Completed final sign-off Apr 2015 | 405 Howard St | new communicating stairs between 4th and 5th floors. new openings in structural post tension concrete slab. no mechanical work under this permit. new smoke control report. ** maher: compliance with ordinance no# 155-13 not required **Details
new communicating stairs between 4th and 5th floors. new openings in structural post tension concrete slab. no mechanical work under this permit. new smoke control report. ** maher: compliance with ordinance no# 155-13 not required ** | $300,000 |
| Feb 25, 2014 | Completed final sign-off Apr 2015 | 405 Howard St | tenant improvement existing space includes minor demolition. construction of new partitions and finishes. convience stairs to 5th floor, mechanical, electrical, fire alarm, fire sprinklers, smoke control and plumbing work under separate permit. making assembly space with occpuant load 322.Details
tenant improvement existing space includes minor demolition. construction of new partitions and finishes. convience stairs to 5th floor, mechanical, electrical, fire alarm, fire sprinklers, smoke control and plumbing work under separate permit. making assembly space with occpuant load 322. | $300,000 |
| Mar 15, 2013 | Completed final sign-off Aug 2013 | 153 Townsend St | modification of extg communicating stair between 8th and 9th floor only, to include widening stair width and landing, new finishes, new hand and guardrails. ref. pa #2013-0206-9569Details
modification of extg communicating stair between 8th and 9th floor only, to include widening stair width and landing, new finishes, new hand and guardrails. ref. pa #2013-0206-9569 | $100,000 |
| Feb 6, 2013 | Completed final sign-off Jul 2013 | 153 Townsend St | 8th & 9th floor - existing communicating stair between floors 8 & 9 to have existing finishes removed to stair. demo of non-structural wall partitions around communicating stairs. ab-17 for t.i. under separate permit.Details
8th & 9th floor - existing communicating stair between floors 8 & 9 to have existing finishes removed to stair. demo of non-structural wall partitions around communicating stairs. ab-17 for t.i. under separate permit. | $5,000 |
| Aug 17, 2012 | Completed final sign-off Mar 2014 | 717 Market St | remodel 1st fl & 2nd fl, restroom, office rooms. add (n) exit stair on stevenson st & replace (e) stair. (n) catwalk that connects elevator lobby to south area of 2nd fl. all (n) lighting, mechanical electric + plumbing. sprinkler & fire alarm & sprinkler on separate permit. panic hardware req'd.Details
remodel 1st fl & 2nd fl, restroom, office rooms. add (n) exit stair on stevenson st & replace (e) stair. (n) catwalk that connects elevator lobby to south area of 2nd fl. all (n) lighting, mechanical electric + plumbing. sprinkler & fire alarm & sprinkler on separate permit. panic hardware req'd. | $136,000 |
| Jun 1, 2012 | Completed final sign-off Feb 2013 | 181 Greenwich St | limited to interior: minor (non structural) demoliton. no plumbing changes proposed. mechanical & electrical to be under separate permit. work consists of non structural demo on floors, 2, 4 & 5. new multi-tenant corridor on 2nd floor. demo of non egress stair between 4 & 5th floor. infill stairDetails
limited to interior: minor (non structural) demoliton. no plumbing changes proposed. mechanical & electrical to be under separate permit. work consists of non structural demo on floors, 2, 4 & 5. new multi-tenant corridor on 2nd floor. demo of non egress stair between 4 & 5th floor. infill stair | $23,000 |
| Mar 1, 2012 | Never finaled issued Mar 2012, no final | 525 Market St | 35th/36th floors-new communication stairs between floor 35 & 36. new opening in structural floor slab for communcating stairsDetails
35th/36th floors-new communication stairs between floor 35 & 36. new opening in structural floor slab for communcating stairs | $200,000 |
| Jul 2, 2010 | Completed final sign-off Mar 2011 | 215 Leidesdorff St | 3rd floor office ti full build out,select demolition of walls, ceiling, lighting, construction of new walls, finishes; new stair connecting 3rd to 4th floor;new millwork. new lighting, electrical, plumbing and mechanical. fire sprinklers under a separate permitDetails
3rd floor office ti full build out,select demolition of walls, ceiling, lighting, construction of new walls, finishes; new stair connecting 3rd to 4th floor;new millwork. new lighting, electrical, plumbing and mechanical. fire sprinklers under a separate permit | $300,000 |
| Mar 4, 2010 | Completed final sign-off Mar 2010 | 50 California St | new partitions and doors to enclose stairs between 2nd & 3rd floors. life safety under separate permit.space to be locked and not used for storage.Details
new partitions and doors to enclose stairs between 2nd & 3rd floors. life safety under separate permit.space to be locked and not used for storage. | $82,522 |
| Sep 23, 2009 | Completed final sign-off May 2010 | 555 Mission St | new communicating stair between floors 16 and 17. new mep for floors 16 and 17. fire alarm and sprinkler under separate permit.Details
new communicating stair between floors 16 and 17. new mep for floors 16 and 17. fire alarm and sprinkler under separate permit. | $975,000 |
| Jul 15, 2008 | Completed final sign-off Apr 2009 | 555 Mission St | 30th & 31st floors - new stairs, stairs railing, structure. nov 200683260 and 200735732 bid.Details
30th & 31st floors - new stairs, stairs railing, structure. nov 200683260 and 200735732 bid. | $200,000 |