Terranova Construction
- Based in
- Novato
- On San Francisco permits
- Jan 2021 to Feb 2025
- Last 24 months
- 3 permits filed
21 permits since 2000: 16 completed, 2 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2025 | Completed final sign-off May 2025 | 19 Loyola Tr | ist floor, #21: upgrade bathroom. shower pan, temp valve, faucet, ptraps, sinks. upgrade dimmers, humidity sensor, dedicated line for heat matt. like for likeDetails
ist floor, #21: upgrade bathroom. shower pan, temp valve, faucet, ptraps, sinks. upgrade dimmers, humidity sensor, dedicated line for heat matt. like for like | $28,000 |
| Jan 27, 2025 | In progress issued Jan 2025 | 4150 17th St | remodel of kitchen add built in seatery, remodel main floor bath nw single vanity , replace shower plumbing, new toilet con flush new tile, new closet, remodele main bath new tub new plumbing and fixtures new tile new to code kitchen electricalDetails
remodel of kitchen add built in seatery, remodel main floor bath nw single vanity , replace shower plumbing, new toilet con flush new tile, new closet, remodele main bath new tub new plumbing and fixtures new tile new to code kitchen electrical | $56,000 |
| Nov 1, 2024 | Completed final sign-off Mar 2025 | 650 Delancey St | kitchen remodel like for like. bathroom remodel like for like. partial bathroom remodel like for like.Details
kitchen remodel like for like. bathroom remodel like for like. partial bathroom remodel like for like. | $95,000 |
| Sep 5, 2024 | Completed final sign-off Dec 2024 | 172 Everson St | bathroom upgrade. replace tub,toilet, vanity,sink, faucet, flooring. replace lights and switches and paint, no wall demolition or construction, no change in plumbing fixture/unit count.Details
bathroom upgrade. replace tub,toilet, vanity,sink, faucet, flooring. replace lights and switches and paint, no wall demolition or construction, no change in plumbing fixture/unit count. | $19,000 |
| Jun 20, 2024 | Completed final sign-off Sep 2024 | 172 Everson St | like for like bathroom remodel - shower pan installation. no major electrical or plumbing work.Details
like for like bathroom remodel - shower pan installation. no major electrical or plumbing work. | $20,000 |
| Feb 7, 2024 | In progress issued Feb 2024 | 2674 24th Av | one bath remodel. all fixtures stay in the same location. replacement of toilet vanity. exhaust fan, shower head body. replacment of light switch, dimmer and humidity sensor. tile work inside shower and floor. all non structuralDetails
one bath remodel. all fixtures stay in the same location. replacement of toilet vanity. exhaust fan, shower head body. replacment of light switch, dimmer and humidity sensor. tile work inside shower and floor. all non structural | $20,000 |
| Jan 9, 2024 | Completed final sign-off Dec 2024 | 414 Clayton St | unit a: replace front window with new entry door. install new wood guardrail and wood handrail.Details
unit a: replace front window with new entry door. install new wood guardrail and wood handrail. | $6,000 |
| Oct 27, 2023 | Completed final sign-off Mar 2025 | 414 Clayton St | 1 kitchen and 1 bathroom remodel like to like. 1 washer and dryer room remodel like to like.Details
1 kitchen and 1 bathroom remodel like to like. 1 washer and dryer room remodel like to like. | $80,000 |
| May 16, 2023 | Completed final sign-off Aug 2023 | 150 Sweeny St | replace exterior window & door. convert into sliding door (patio). replace (e) drywall walls & ceiling. work is not visble from the street. all work is non-structural onlyDetails
replace exterior window & door. convert into sliding door (patio). replace (e) drywall walls & ceiling. work is not visble from the street. all work is non-structural only | $20,000 |
| Apr 21, 2023 | Completed final sign-off May 2024 | 1239 19th Av | legalizing an (e) wet bar located at level 1.Details
legalizing an (e) wet bar located at level 1. | |
| Mar 28, 2023 | Completed final sign-off May 2024 | 1239 19th Av | to comply with physical inspection report# cc-8526. install fire rated door at unit 1239Details
to comply with physical inspection report# cc-8526. install fire rated door at unit 1239 | $5,000 |
| Jan 6, 2023 | Completed final sign-off May 2023 | 242 Arguello Bl | in kind (1) kitchen remodel.Details
in kind (1) kitchen remodel. | $40,000 |
| Aug 17, 2022 | Completed final sign-off Jan 2023 | 1000 Fulton St | scope of work limited to addition of micro kitchen in 3rd fl library- new sink, 2 burner stovetop, microwave, mini fridge and dishwasher. library is a futre non-mobility frature room per pa202101223165.Details
scope of work limited to addition of micro kitchen in 3rd fl library- new sink, 2 burner stovetop, microwave, mini fridge and dishwasher. library is a futre non-mobility frature room per pa202101223165. | $20,000 |
| Jun 9, 2022 | Completed final sign-off Sep 2022 | 1097 Howard St | unit #306: 78 sqft bathroom remodel on mezzanine level. relocate (e) vanity to opposite wall and add another. replace (e) tub/ shower with (n) curbed shower. all (n) fixtures + finishes.Details
unit #306: 78 sqft bathroom remodel on mezzanine level. relocate (e) vanity to opposite wall and add another. replace (e) tub/ shower with (n) curbed shower. all (n) fixtures + finishes. | $16,000 |
| Jun 7, 2022 | Completed final sign-off Sep 2022 | 1097 Howard St | unit #306: 43 sqft powder room remodel on 3rd fl. replace (e) with (n) toilet + vanity. all (n) fixtures + finishes. no structural changes to walls or openings.Details
unit #306: 43 sqft powder room remodel on 3rd fl. replace (e) with (n) toilet + vanity. all (n) fixtures + finishes. no structural changes to walls or openings. | $10,500 |
| Jun 1, 2022 | Completed final sign-off Feb 2023 | 1748 20th Av | in kind kitchen remodel. in kind 3 bathroom remodel.Details
in kind kitchen remodel. in kind 3 bathroom remodel. | $50,000 |
| May 3, 2022 | Never finaled filed May 2022, never issued | 1000 Fulton St | additional elevator for ada access and a roof deck.Details
additional elevator for ada access and a roof deck. | $100,000 |
| Apr 7, 2022 | Completed final sign-off Oct 2022 | 2040 Franklin St | unit 1101: kitchen upgrade: cabinetry replacement, new countertop, new appliances, run dedicade gfci lines, new floor installation. no layout changes.Details
unit 1101: kitchen upgrade: cabinetry replacement, new countertop, new appliances, run dedicade gfci lines, new floor installation. no layout changes. | $30,000 |
| Apr 13, 2021 | Completed final sign-off May 2021 | 979 Guerrero St | replace 3,200 sqft of siding. hardie plank in west wall. not visible from street.Details
replace 3,200 sqft of siding. hardie plank in west wall. not visible from street. | $40,000 |
| Feb 4, 2021 | Never finaled issued Mar 2021, no final | 1 Market St | ref # 2019-0815-8895; sffd required asbuilts for the 4th flr.Details
ref # 2019-0815-8895; sffd required asbuilts for the 4th flr. | |
| Jan 22, 2021 | Never finaled filed Jan 2021, never issued | 1000 Fulton St | barrier removal to incl: addition of an ada ramp, relocating ada parking space, adding 2 communication feature rooms, and adding unisex signage at restroom 1-330. no alteration of (e) load bearing components & no alteration to the historically significant interior. # of hotel rooms to remain at 19.Details
barrier removal to incl: addition of an ada ramp, relocating ada parking space, adding 2 communication feature rooms, and adding unisex signage at restroom 1-330. no alteration of (e) load bearing components & no alteration to the historically significant interior. # of hotel rooms to remain at 19. | $5,000 |