Permit GraphShortlistSan Francisco building permits since 2000

Terranova Construction

Contractor license
1065664
State license record
Based in
Novato
On San Francisco permits
Jan 2021 to Feb 2025
Last 24 months
2 permits filed

21 permits since 2000: 16 completed, 2 in progress, 3 never finaled.

Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 2 were filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllRoof deck 1Kitchen remodel 7Bathroom remodel 9
FiledOutcomeAddressWork described on the permitDeclared cost
Feb 20, 2025Completed
final sign-off May 2025
19 Loyola Trist floor, #21: upgrade bathroom. shower pan, temp valve, faucet, ptraps, sinks. upgrade dimmers, humidity sensor, dedicated line for heat matt. like for like
Details
Permit
202502200724
Permit issued
Feb 20, 2025
Final sign-off
May 20, 2025

ist floor, #21: upgrade bathroom. shower pan, temp valve, faucet, ptraps, sinks. upgrade dimmers, humidity sensor, dedicated line for heat matt. like for like

Open the permit page

$28,000
Jan 27, 2025In progress
issued Jan 2025
4150 17th Stremodel of kitchen add built in seatery, remodel main floor bath nw single vanity , replace shower plumbing, new toilet con flush new tile, new closet, remodele main bath new tub new plumbing and fixtures new tile new to code kitchen electrical
Details
Permit
202501279094
Permit issued
Jan 27, 2025

remodel of kitchen add built in seatery, remodel main floor bath nw single vanity , replace shower plumbing, new toilet con flush new tile, new closet, remodele main bath new tub new plumbing and fixtures new tile new to code kitchen electrical

Open the permit page

$56,000
Nov 1, 2024Completed
final sign-off Mar 2025
650 Delancey Stkitchen remodel like for like. bathroom remodel like for like. partial bathroom remodel like for like.
Details
Permit
202411014260
Permit issued
Nov 1, 2024
Final sign-off
Mar 14, 2025

kitchen remodel like for like. bathroom remodel like for like. partial bathroom remodel like for like.

Open the permit page

$95,000
Sep 5, 2024Completed
final sign-off Dec 2024
172 Everson Stbathroom upgrade. replace tub,toilet, vanity,sink, faucet, flooring. replace lights and switches and paint, no wall demolition or construction, no change in plumbing fixture/unit count.
Details
Permit
202409050140
Permit issued
Sep 6, 2024
Final sign-off
Dec 9, 2024

bathroom upgrade. replace tub,toilet, vanity,sink, faucet, flooring. replace lights and switches and paint, no wall demolition or construction, no change in plumbing fixture/unit count.

Open the permit page

$19,000
Jun 20, 2024Completed
final sign-off Sep 2024
172 Everson Stlike for like bathroom remodel - shower pan installation. no major electrical or plumbing work.
Details
Permit
202406204925
Permit issued
Jun 21, 2024
Final sign-off
Sep 23, 2024

like for like bathroom remodel - shower pan installation. no major electrical or plumbing work.

Open the permit page

$20,000
Feb 7, 2024In progress
issued Feb 2024
2674 24th Avone bath remodel. all fixtures stay in the same location. replacement of toilet vanity. exhaust fan, shower head body. replacment of light switch, dimmer and humidity sensor. tile work inside shower and floor. all non structural
Details
Permit
202402075396
Permit issued
Feb 7, 2024

one bath remodel. all fixtures stay in the same location. replacement of toilet vanity. exhaust fan, shower head body. replacment of light switch, dimmer and humidity sensor. tile work inside shower and floor. all non structural

Open the permit page

$20,000
Jan 9, 2024Completed
final sign-off Dec 2024
414 Clayton Stunit a: replace front window with new entry door. install new wood guardrail and wood handrail.
Details
Permit
202401093674
Permit issued
Jan 9, 2024
Final sign-off
Dec 4, 2024

unit a: replace front window with new entry door. install new wood guardrail and wood handrail.

Open the permit page

$6,000
Oct 27, 2023Completed
final sign-off Mar 2025
414 Clayton St1 kitchen and 1 bathroom remodel like to like. 1 washer and dryer room remodel like to like.
Details
Permit
202310279671
Permit issued
Oct 27, 2023
Final sign-off
Mar 12, 2025

1 kitchen and 1 bathroom remodel like to like. 1 washer and dryer room remodel like to like.

Open the permit page

$80,000
May 16, 2023Completed
final sign-off Aug 2023
150 Sweeny Streplace exterior window & door. convert into sliding door (patio). replace (e) drywall walls & ceiling. work is not visble from the street. all work is non-structural only
Details
Permit
202305167887
Permit issued
May 16, 2023
Final sign-off
Aug 1, 2023

replace exterior window & door. convert into sliding door (patio). replace (e) drywall walls & ceiling. work is not visble from the street. all work is non-structural only

Open the permit page

$20,000
Apr 21, 2023Completed
final sign-off May 2024
1239 19th Avlegalizing an (e) wet bar located at level 1.
Details
Permit
202304216242
Permit issued
Apr 21, 2023
Final sign-off
May 7, 2024

legalizing an (e) wet bar located at level 1.

Open the permit page

Mar 28, 2023Completed
final sign-off May 2024
1239 19th Avto comply with physical inspection report# cc-8526. install fire rated door at unit 1239
Details
Permit
202303284568
Permit issued
Mar 28, 2023
Final sign-off
May 7, 2024

to comply with physical inspection report# cc-8526. install fire rated door at unit 1239

Open the permit page

$5,000
Jan 6, 2023Completed
final sign-off May 2023
242 Arguello Blin kind (1) kitchen remodel.
Details
Permit
202301069827
Permit issued
Jan 6, 2023
Final sign-off
May 10, 2023

in kind (1) kitchen remodel.

Open the permit page

$40,000
Aug 17, 2022Completed
final sign-off Jan 2023
1000 Fulton Stscope of work limited to addition of micro kitchen in 3rd fl library- new sink, 2 burner stovetop, microwave, mini fridge and dishwasher. library is a futre non-mobility frature room per pa202101223165.
Details
Permit
202208170767
Permit issued
Aug 24, 2022
Final sign-off
Jan 10, 2023

scope of work limited to addition of micro kitchen in 3rd fl library- new sink, 2 burner stovetop, microwave, mini fridge and dishwasher. library is a futre non-mobility frature room per pa202101223165.

Open the permit page

$20,000
Jun 9, 2022Completed
final sign-off Sep 2022
1097 Howard Stunit #306: 78 sqft bathroom remodel on mezzanine level. relocate (e) vanity to opposite wall and add another. replace (e) tub/ shower with (n) curbed shower. all (n) fixtures + finishes.
Details
Permit
202206095930
Permit issued
Jun 15, 2022
Final sign-off
Sep 13, 2022

unit #306: 78 sqft bathroom remodel on mezzanine level. relocate (e) vanity to opposite wall and add another. replace (e) tub/ shower with (n) curbed shower. all (n) fixtures + finishes.

Open the permit page

$16,000
Jun 7, 2022Completed
final sign-off Sep 2022
1097 Howard Stunit #306: 43 sqft powder room remodel on 3rd fl. replace (e) with (n) toilet + vanity. all (n) fixtures + finishes. no structural changes to walls or openings.
Details
Permit
202206075725
Permit issued
Jun 15, 2022
Final sign-off
Sep 1, 2022

unit #306: 43 sqft powder room remodel on 3rd fl. replace (e) with (n) toilet + vanity. all (n) fixtures + finishes. no structural changes to walls or openings.

Open the permit page

$10,500
Jun 1, 2022Completed
final sign-off Feb 2023
1748 20th Avin kind kitchen remodel. in kind 3 bathroom remodel.
Details
Permit
202206015410
Permit issued
Jun 1, 2022
Final sign-off
Feb 7, 2023

in kind kitchen remodel. in kind 3 bathroom remodel.

Open the permit page

$50,000
May 3, 2022Never finaled
filed May 2022, never issued
1000 Fulton Stadditional elevator for ada access and a roof deck.
Details
Permit
202205033453

additional elevator for ada access and a roof deck.

Open the permit page

$100,000
Apr 7, 2022Completed
final sign-off Oct 2022
2040 Franklin Stunit 1101: kitchen upgrade: cabinetry replacement, new countertop, new appliances, run dedicade gfci lines, new floor installation. no layout changes.
Details
Permit
202204071832
Permit issued
Apr 7, 2022
Final sign-off
Oct 24, 2022

unit 1101: kitchen upgrade: cabinetry replacement, new countertop, new appliances, run dedicade gfci lines, new floor installation. no layout changes.

Open the permit page

$30,000
Apr 13, 2021Completed
final sign-off May 2021
979 Guerrero Streplace 3,200 sqft of siding. hardie plank in west wall. not visible from street.
Details
Permit
202104138406
Permit issued
Apr 13, 2021
Final sign-off
May 27, 2021

replace 3,200 sqft of siding. hardie plank in west wall. not visible from street.

Open the permit page

$40,000
Feb 4, 2021Never finaled
issued Mar 2021, no final
1 Market Stref # 2019-0815-8895; sffd required asbuilts for the 4th flr.
Details
Permit
202102044052
Permit issued
Mar 10, 2021

ref # 2019-0815-8895; sffd required asbuilts for the 4th flr.

Open the permit page

Jan 22, 2021Never finaled
filed Jan 2021, never issued
1000 Fulton Stbarrier removal to incl: addition of an ada ramp, relocating ada parking space, adding 2 communication feature rooms, and adding unisex signage at restroom 1-330. no alteration of (e) load bearing components & no alteration to the historically significant interior. # of hotel rooms to remain at 19.
Details
Permit
202101223165

barrier removal to incl: addition of an ada ramp, relocating ada parking space, adding 2 communication feature rooms, and adding unisex signage at restroom 1-330. no alteration of (e) load bearing components & no alteration to the historically significant interior. # of hotel rooms to remain at 19.

Open the permit page

$5,000