Block 0778, lot 006
1000 Fulton St
- City’s use
- Commercial Hotel
- Built
- 1912
- Stories
- 3
- Building
- 12,180 sq ft
- Lot
- 10,656 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 13, 2025 | Completed final sign-off Jan 2025 | 1000 Fulton St | Aura Fire Safety | as-built revision to permit number #2024-0906-0289 add 1 smoke detector in elevator machine roomDetails
as-built revision to permit number #2024-0906-0289 add 1 smoke detector in elevator machine room | |
| Sep 6, 2024 | Completed final sign-off May 2025 | 1000 Fulton St | Aura Fire Safety | like for like replacement of fire alarm, add low frequency horns to sleeping areas to comply with 1103.7.6.1. add notification devices as needed to comply with ab201.Details
like for like replacement of fire alarm, add low frequency horns to sleeping areas to comply with 1103.7.6.1. add notification devices as needed to comply with ab201. | $43,000 |
| Dec 29, 2022 | Never finaled filed Dec 2022, never issued | 1000 Fulton St | to erect a 2-story, type 3, 1-adu structure at rear yard parking lot.Details
to erect a 2-story, type 3, 1-adu structure at rear yard parking lot. | $700,000 | |
| Dec 8, 2022 | Never finaled filed Dec 2022, never issued | 1000 Fulton St | upgrade (e)hotel kitchen commercial use; 1/f: relocate (e)walk-in cooler, r/r (e)grease duct, new make-up air filter fan, fl sink upgrade/waste pipe enlarged, new mop sink, fl mounted grease trap, add fl drain/sink in kitchen, new food prep sink, screens on windows; 2-3-4/f: access panels,Details
upgrade (e)hotel kitchen commercial use; 1/f: relocate (e)walk-in cooler, r/r (e)grease duct, new make-up air filter fan, fl sink upgrade/waste pipe enlarged, new mop sink, fl mounted grease trap, add fl drain/sink in kitchen, new food prep sink, screens on windows; 2-3-4/f: access panels, | $40,000 | |
| Aug 17, 2022 | Completed final sign-off Jan 2023 | 1000 Fulton St | Terranova Construction | scope of work limited to addition of micro kitchen in 3rd fl library- new sink, 2 burner stovetop, microwave, mini fridge and dishwasher. library is a futre non-mobility frature room per pa202101223165.Details
scope of work limited to addition of micro kitchen in 3rd fl library- new sink, 2 burner stovetop, microwave, mini fridge and dishwasher. library is a futre non-mobility frature room per pa202101223165. | $20,000 |
| May 3, 2022 | Never finaled filed May 2022, never issued | 1000 Fulton St | Terranova Construction | additional elevator for ada access and a roof deck. | $100,000 |
| Jan 22, 2021 | Never finaled filed Jan 2021, never issued | 1000 Fulton St | Terranova Construction | barrier removal to incl: addition of an ada ramp, relocating ada parking space, adding 2 communication feature rooms, and adding unisex signage at restroom 1-330. no alteration of (e) load bearing components & no alteration to the historically significant interior. # of hotel rooms to remain at 19.Details
barrier removal to incl: addition of an ada ramp, relocating ada parking space, adding 2 communication feature rooms, and adding unisex signage at restroom 1-330. no alteration of (e) load bearing components & no alteration to the historically significant interior. # of hotel rooms to remain at 19. | $5,000 |
| Dec 20, 2019 | Completed final sign-off Mar 2020 | 1000 Fulton St | apt 5: new bathroom for guest suite #5 on 2nd floor. new handrail at exterior ramp. new contrasting stripes for stairs (ada).Details
apt 5: new bathroom for guest suite #5 on 2nd floor. new handrail at exterior ramp. new contrasting stripes for stairs (ada). | $25,000 | |
| Aug 15, 2016 | Completed final sign-off May 2017 | 1000 Fulton St | Magnolia Development Inc. | basement & 1st fl: revision to permit 2013-0403-3731; slightly different configuration to floor plan of bathroom, bedrooms.Details
basement & 1st fl: revision to permit 2013-0403-3731; slightly different configuration to floor plan of bathroom, bedrooms. | $25,000 |
| Sep 4, 2015 | Completed final sign-off Sep 2015 | 1000 Fulton St | Hough Construction | renew pa# 201212045433 to complete. to obtain final inspection for work approved under pa# 201212045433. all work is complete.Details
renew pa# 201212045433 to complete. to obtain final inspection for work approved under pa# 201212045433. all work is complete. | |
| Jun 13, 2014 | Never finaled issued Oct 2016, no final | 1000 Fulton St | Magnolia Development Inc. | installation of roof maintenance walkway on north side of roof with minimum required safety height for railing, accessed by (e) fire escape on east facade, per coa case no. 2013.0490aDetails
installation of roof maintenance walkway on north side of roof with minimum required safety height for railing, accessed by (e) fire escape on east facade, per coa case no. 2013.0490a | $50,000 |
| Apr 3, 2013 | Completed final sign-off May 2017 | 1000 Fulton St | Doorman Property Management, Magnolia Development Inc. | reconf(e)15 rm guest hotel&1 mgr unit to create 4 add'l hotel rms total 19 rms&1 mgr unit.remodel(e)toilet at guest rm 2. provide(n)accessible guest rm.provide primary entrance ramp,(n)common area toilet. rm#6,8&9 remodel toilet & bath. guest rm #10 provide (n) bath. rm#11 remodel bath.Details
reconf(e)15 rm guest hotel&1 mgr unit to create 4 add'l hotel rms total 19 rms&1 mgr unit.remodel(e)toilet at guest rm 2. provide(n)accessible guest rm.provide primary entrance ramp,(n)common area toilet. rm#6,8&9 remodel toilet & bath. guest rm #10 provide (n) bath. rm#11 remodel bath. | $130,000 |
| Jan 29, 2013 | Expired or cancelled cancelled Jan 2026 | 1000 Fulton St | Doorman Property Management | retile 6 bathrooms with 3"c6" tiles, repaint 4 restore interior walls, refinish floors & replace carpeting. install new h/c & access (lift & step) on west side of bldg.Details
retile 6 bathrooms with 3"c6" tiles, repaint 4 restore interior walls, refinish floors & replace carpeting. install new h/c & access (lift & step) on west side of bldg. | $58,000 |
| Dec 4, 2012 | Never finaled issued Dec 2012, no final | 1000 Fulton St | Hough Construction | fasten brick masonry basement walls to 1st floor wooden construction.Details
fasten brick masonry basement walls to 1st floor wooden construction. | $50,000 |
| Feb 10, 2011 | Completed final sign-off Apr 2011 | 1000 Fulton St | Fred Pavlow Co. Inc Dba Add-A-Garage | revision to pa# 20100930-1983-replace floor & stairs on grade at entranceDetails
revision to pa# 20100930-1983-replace floor & stairs on grade at entrance | $6,000 |
| Sep 30, 2010 | Completed final sign-off Apr 2011 | 1000 Fulton St | Fred Pavlow Co. Inc Dba Add-A-Garage | replace existing corroded steel beam with new, partial concrete wall replacement for mounting of new steel beamDetails
replace existing corroded steel beam with new, partial concrete wall replacement for mounting of new steel beam | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Magnolia Development Inc. (3), Terranova Construction (3), Aura Fire Safety (2), Doorman Property Management (2), Fred Pavlow Co. Inc Dba Add-A-Garage (2), Hough Construction (2)
- Architects
- Brett Terpeluk (3), Stan Teng (3), Brett Teroekyj, Don David, Donna Schumacher
- Engineers
- M.L. Hicks, Meng Hsiu Chen, Peter A. Culley
- Designers
- Aura Fire Safety
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.