Donna Schumacher
- Listed as
- architect, authorized agent-others, designer
- Firm
- Donna Schumacher Arch.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Dec 2025
49 permits since 2000 (architect on 45 permits, authorized agent-others on 4 permits, designer on 1 permit): 33 completed, 4 in progress, 8 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 1, 2025 | In progress issued Dec 2025 | 2043 15th St | structure (b) addition - storage/garage: new steel beam to replace existing line of support, new shear wall.Details
structure (b) addition - storage/garage: new steel beam to replace existing line of support, new shear wall. | $15,000 | |
| Dec 1, 2025 | In progress issued Dec 2025 | 2043 15th St | structure (a) - residential units: remodel unit 2043 15th st. relocate kitchen and bath, new structural work - shear wall, foundation at property line.Details
structure (a) - residential units: remodel unit 2043 15th st. relocate kitchen and bath, new structural work - shear wall, foundation at property line. | $80,000 | |
| Jul 30, 2025 | In progress issued Dec 2025 | 642 Lombard St | La Electric, Sf Twin Boys Corp. Dba Master Builders | rear bldg: add 2 adu, local adu program per planning code section 207.1 exterior work includes new egress stair and landing at center of lot and replacement of front gate. response to complaint 202422936 and 201902761.Details
rear bldg: add 2 adu, local adu program per planning code section 207.1 exterior work includes new egress stair and landing at center of lot and replacement of front gate. response to complaint 202422936 and 201902761. | $80,000 |
| May 2, 2025 | Completed final sign-off Aug 2025 | 38 Parnassus Av | Ideal Builders | 3/f: conversion of (e) primary bedroom into (2) bedrooms. new non-bearing wall and doors. remove (e) grill in kitchen. no exterior work.Details
3/f: conversion of (e) primary bedroom into (2) bedrooms. new non-bearing wall and doors. remove (e) grill in kitchen. no exterior work. | $8,000 |
| Oct 23, 2024 | Completed final sign-off May 2025 | 52 Sharon St | B Birmingham Inc. | replace (e) stair to rear yard w/new stair.Details
replace (e) stair to rear yard w/new stair. | $40,000 |
| Apr 19, 2024 | Completed final sign-off Jan 2025 | 2011 Oak St | Ideal Builders | rev to pa# 2024-0117-4076; reconfiguration of 2 existing bathrooms in one of 4 units, new windows in lightwell, level kitchen floor and reinstall existing cabintry, removal of one bathroom sink and shower head.Details
rev to pa# 2024-0117-4076; reconfiguration of 2 existing bathrooms in one of 4 units, new windows in lightwell, level kitchen floor and reinstall existing cabintry, removal of one bathroom sink and shower head. | |
| Jan 4, 2024 | In progress issued Jan 2024 | 314 Rutledge St | Muldoon Construction Inc | kitchen and 2 full bathroom remodel.Details
kitchen and 2 full bathroom remodel. | $75,000 |
| Aug 17, 2023 | Never finaled filed Aug 2023, never issued | 3206 Mission St | response to abe category checklist compliance form abe 202001311543, new door mat approval of tech infeasibility for level landing for exterior (n) compliant power door operator inlieu of level landing clearanceDetails
response to abe category checklist compliance form abe 202001311543, new door mat approval of tech infeasibility for level landing for exterior (n) compliant power door operator inlieu of level landing clearance | $12,000 | |
| Aug 15, 2023 | Completed final sign-off Apr 2024 | 52 Sharon St | Ideal Builders | (n) windows for top only, wood facing street, vinyl facing rear. bath and kitchen renovation, removal of one sink in bath.Details
(n) windows for top only, wood facing street, vinyl facing rear. bath and kitchen renovation, removal of one sink in bath. | $80,000 |
| May 11, 2023 | Completed final sign-off Jul 2023 | 1661 Sacramento St | Mendez-Ortiz Contractors | unit #5: revision to permit app# 202302242579. replacement skylight to be operable, structural details and inspections. modification to kitchen and bath layout.Details
unit #5: revision to permit app# 202302242579. replacement skylight to be operable, structural details and inspections. modification to kitchen and bath layout. | $5,000 |
| Feb 24, 2023 | Completed final sign-off Jul 2023 | 1661 Sacramento St | Mendez-Ortiz Contractors | unit 5: remodel and relocate kitchen and (1) bath, replace (e) skylight above unit in-kindDetails
unit 5: remodel and relocate kitchen and (1) bath, replace (e) skylight above unit in-kind | $25,000 |
| Feb 7, 2023 | Completed final sign-off Nov 2024 | 351 Waller St | B Birmingham Inc. | replacement in-kind of existing rear stair in rear yard, (n) property line wall variance req.Details
replacement in-kind of existing rear stair in rear yard, (n) property line wall variance req. | $50,000 |
| Oct 28, 2022 | Completed final sign-off Jun 2026 | 278 Page St | Sasso Construction Inc. | new laundry and guest bedroom suite in g/f annex.Details
new laundry and guest bedroom suite in g/f annex. | $5,000 |
| Jul 13, 2022 | Completed final sign-off Mar 2024 | 1026 Carolina St | B Birmingham Inc. | response to nov 202175091 retaining wall at rear property line. remodel e residential unit, new siding, windows, skylight. replacement of deck and stair. new 117 sf habitable in basement,replace awning over entry entry door, va 2021.009943varDetails
response to nov 202175091 retaining wall at rear property line. remodel e residential unit, new siding, windows, skylight. replacement of deck and stair. new 117 sf habitable in basement,replace awning over entry entry door, va 2021.009943var | $100,000 |
| Jun 8, 2022 | Never finaled issued Aug 2023, no final | 4052 25th St | new 113 sq ft at 3rd floor for new bath & dressing by changing roof height within footprint & setbacks. new powder room, closet & stair configuration on 2nd floor. no change to 1st floor or number of plumbing fixture.Details
new 113 sq ft at 3rd floor for new bath & dressing by changing roof height within footprint & setbacks. new powder room, closet & stair configuration on 2nd floor. no change to 1st floor or number of plumbing fixture. | $150,000 | |
| Feb 8, 2022 | Completed final sign-off Oct 2022 | 1943 Stockton St | Sf Twin Boys Corp. Dba Master Builders | establish (e) use (daycare/preschool) space for unit (1945 stockton st) for ground floor; no active space for 3 years prior, mechanical under separate permit modifications under separate permit #202202077497Details
establish (e) use (daycare/preschool) space for unit (1945 stockton st) for ground floor; no active space for 3 years prior, mechanical under separate permit modifications under separate permit #202202077497 | $1,000 |
| Feb 7, 2022 | Completed final sign-off Oct 2022 | 1943 Stockton St | Sf Twin Boys Corp. Dba Master Builders | ada bathroom, improvements as required for path of travel no modification to 2/f or building in rear of property. fire alarm & mech under separate permit.Details
ada bathroom, improvements as required for path of travel no modification to 2/f or building in rear of property. fire alarm & mech under separate permit. | $15,000 |
| Dec 6, 2021 | Expired or cancelled cancelled Jan 2023 | 1943 Stockton St | Sf Twin Boys Corp. Dba Master Builders | 1st floor & basement: t.i to extg office space(1943 stockton), full ada compliance including new ada bath and nw acces. platform lift, remodel (e) bathroom, replace & expanding extg storage platform, lower slab on lower floor by 18", no modification of dwelling unit.seismic upgradeDetails
1st floor & basement: t.i to extg office space(1943 stockton), full ada compliance including new ada bath and nw acces. platform lift, remodel (e) bathroom, replace & expanding extg storage platform, lower slab on lower floor by 18", no modification of dwelling unit.seismic upgrade | $200,000 |
| Oct 8, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | Urban Builder General Contracting Inc | rev to pa 202101142640 and 202108277317 (n) foundation wall (n) shear wallDetails
rev to pa 202101142640 and 202108277317 (n) foundation wall (n) shear wall | $1,000 |
| Aug 27, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | Urban Builder General Contracting Inc | rev to pa202101142640 - rev to structural to including removal of w/c addition & kitchen windows. new layout for main bedroom. new 2hr enclosure for path of travel light well to rear yard.Details
rev to pa202101142640 - rev to structural to including removal of w/c addition & kitchen windows. new layout for main bedroom. new 2hr enclosure for path of travel light well to rear yard. | |
| Jan 14, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | Urban Builder General Contracting Inc | kitchen & main bathroom renovation. expansion of (e) roof to include (e) floor space. infill light well.Details
kitchen & main bathroom renovation. expansion of (e) roof to include (e) floor space. infill light well. | $100,000 |
| Nov 9, 2020 | Never finaled issued Oct 2022, no final | 375 28th St | Eco Logic Construction & Design Inc. | new horizontal 310 square foot addition with (n) first floor bedroom below and (n) second floor deck above with stair to rear yard.Details
new horizontal 310 square foot addition with (n) first floor bedroom below and (n) second floor deck above with stair to rear yard. | $80,000 |
| Dec 20, 2019 | Expired or cancelled withdrawn Jan 2020 | 721 Corbett Av | revision to pa# 2018-0913-0100: administrative permit to remove reference to pa #2017-0223-0018Details
revision to pa# 2018-0913-0100: administrative permit to remove reference to pa #2017-0223-0018 | ||
| Dec 20, 2019 | Completed final sign-off Mar 2020 | 1000 Fulton St | apt 5: new bathroom for guest suite #5 on 2nd floor. new handrail at exterior ramp. new contrasting stripes for stairs (ada).Details
apt 5: new bathroom for guest suite #5 on 2nd floor. new handrail at exterior ramp. new contrasting stripes for stairs (ada). | $25,000 | |
| Nov 26, 2019 | Never finaled issued Jun 2021, no final | 2104 Castro St | B Birmingham Inc. | front yard deck addition: open 42 sf, roof 40 sf. rear yard roof deck expansion; 160 sf.Details
front yard deck addition: open 42 sf, roof 40 sf. rear yard roof deck expansion; 160 sf. | $20,000 |
| Oct 9, 2019 | Never finaled filed Oct 2019, never issued | 5140 Geary Bl | (n) adu unit in (e) garage @ grd flr per ord# 162-16. relocate laundry. new stair and access corridor to laundry & adu new windows in rear yard.Details
(n) adu unit in (e) garage @ grd flr per ord# 162-16. relocate laundry. new stair and access corridor to laundry & adu new windows in rear yard. | $50,000 | |
| Nov 16, 2018 | Completed final sign-off Aug 2019 | 1310 Church St | B Birmingham Inc. | revision to pa 2018-0723-5251. foundation wall changes due to construction revisionDetails
revision to pa 2018-0723-5251. foundation wall changes due to construction revision | $10,000 |
| Oct 15, 2018 | Never finaled issued Mar 2020, no final | 1815 22nd Av | comply w/ nov# 201859361. legalization of illegal unit on ground flr per ord# 43-14 w/ one bedroom, one bath & kitchen. remove of one parking space. change to front facade.Details
comply w/ nov# 201859361. legalization of illegal unit on ground flr per ord# 43-14 w/ one bedroom, one bath & kitchen. remove of one parking space. change to front facade. | $20,000 | |
| Sep 13, 2018 | Completed final sign-off Dec 2019 | 721 Corbett Av | D3 Construction | revision to 201702230018, design change to carport with cantilevered roof, 2 postsDetails
revision to 201702230018, design change to carport with cantilevered roof, 2 posts | |
| Sep 13, 2018 | Expired or cancelled cancelled Nov 2022 | 615 Silver Av | new garage door opening at front facade opening. driveway as existing, in response to complaint 201538973, 201878794Details
new garage door opening at front facade opening. driveway as existing, in response to complaint 201538973, 201878794 | $2,000 | |
| Apr 11, 2018 | Completed final sign-off Jun 2019 | 636 Octavia St | Marvel Construction Company Inc | revision to 201712116133, revised configuration of ada bathroom, kitchen & rear yard door & windowDetails
revision to 201712116133, revised configuration of ada bathroom, kitchen & rear yard door & window | |
| Dec 11, 2017 | Completed final sign-off Jun 2019 | 636 Octavia St | Marvel Construction Company Inc | revision to pa #201605318786- minor change to kitchen/ada bath/rear door. patio in rear removed from scope, existing concrete floor to remain/lowered floor removed from scope, roof deck removed from scope of work.Details
revision to pa #201605318786- minor change to kitchen/ada bath/rear door. patio in rear removed from scope, existing concrete floor to remain/lowered floor removed from scope, roof deck removed from scope of work. | |
| Nov 2, 2017 | Completed final sign-off Jul 2019 | 1270 Church St | Sederap's Drywall Inc. | add (2) additional dwelling units on the ground floor per ordinance 162-16. sprinklers deferred.Details
add (2) additional dwelling units on the ground floor per ordinance 162-16. sprinklers deferred. | $80,000 |
| Aug 21, 2017 | Completed final sign-off Mar 2018 | 634 South Van Ness Av | replace existing req egress stair with replacement in kindDetails
replace existing req egress stair with replacement in kind | $25,000 | |
| Jun 20, 2017 | Completed final sign-off Apr 2020 | 5 Gladeview Wy | Brothers Collins Woodworking Inc | new enlarged deck to replace existing, replace (e) fence, & lower patio. new doors & window to deck. new lighting for deck & gasline for bbq.Details
new enlarged deck to replace existing, replace (e) fence, & lower patio. new doors & window to deck. new lighting for deck & gasline for bbq. | $40,000 |
| Mar 3, 2015 | Completed final sign-off Jun 2017 | 367 Oak St | Seamus R Cudden | parking pad in rear yard, variance application 20140335.Details
parking pad in rear yard, variance application 20140335. | $20,000 |
| Jul 11, 2013 | Completed final sign-off Aug 2013 | 1467 Willard St | revision to app#201204138228. response to notice of violation #201226801. remove extg expansion of footprint. remove extg driveway paving. restore to original condition.Details
revision to app#201204138228. response to notice of violation #201226801. remove extg expansion of footprint. remove extg driveway paving. restore to original condition. | $5,000 | |
| May 29, 2013 | Completed final sign-off Apr 2014 | 181 Granville Wy | replace non-permitted space with bedroom & bathroom & bring to code on lower level (above garage level); replace wood fireplace with gas furnace, replace windows in kind - double pane, max u-factor =0.40Details
replace non-permitted space with bedroom & bathroom & bring to code on lower level (above garage level); replace wood fireplace with gas furnace, replace windows in kind - double pane, max u-factor =0.40 | $35,000 | |
| Aug 31, 2012 | Completed final sign-off Nov 2013 | 817 York St | Building Efficiency Inc | create guest bedroom suite in ground level. new bathroom, bedroom, laundry, new laundry & stair, new hall to rear yard. new conditioned space.Details
create guest bedroom suite in ground level. new bathroom, bedroom, laundry, new laundry & stair, new hall to rear yard. new conditioned space. | $66,250 |
| Aug 30, 2012 | Completed final sign-off Nov 2013 | 817 York St | Building Efficiency Inc | change of use for single family to 2 unit. designation of 2nd unit. new kitchen for unit. ref to p/a#201208318709.Details
change of use for single family to 2 unit. designation of 2nd unit. new kitchen for unit. ref to p/a#201208318709. | $2,000 |
| Mar 31, 2011 | Completed final sign-off Apr 2012 | 200 San Benito Wy | powder room addition near entry. kitchen addition toward rear & add/remodel new deck off family room.Details
powder room addition near entry. kitchen addition toward rear & add/remodel new deck off family room. | $80,000 | |
| Dec 2, 2009 | Completed final sign-off Mar 2010 | 77 Van Ness Av | Roebuck Construction | 2nd floor-tenant improvement in ste #203-install new kitchen, partitions, conference room & office, new hvac & electrical. new bldg pa# 2000-0717-5308 & 2009-0914-6785Details
2nd floor-tenant improvement in ste #203-install new kitchen, partitions, conference room & office, new hvac & electrical. new bldg pa# 2000-0717-5308 & 2009-0914-6785 | $175,000 |
| Jun 23, 2009 | Never finaled issued Sep 2010, no final | 356 Elizabeth St | 2nd & 3rd floor additions to (e) 2 unit property.Details
2nd & 3rd floor additions to (e) 2 unit property. | $120,000 | |
| Mar 31, 2008 | Completed final sign-off Sep 2008 | 284 Wawona St | kitchen remodel, new range & vent hood, plumbing slightly altered. vent hood to exterior less than 3 feet from property line.Details
kitchen remodel, new range & vent hood, plumbing slightly altered. vent hood to exterior less than 3 feet from property line. | $45,000 | |
| Jun 7, 2007 | Expired or cancelled withdrawn Oct 2007 | 863 25th Av | revision to pa# 200704048069; 3r-4434. bar siutz in home office of lower unit that is being used as a home office. part of condo conversion process to legalize current space.Details
revision to pa# 200704048069; 3r-4434. bar siutz in home office of lower unit that is being used as a home office. part of condo conversion process to legalize current space. | $500 | |
| Mar 19, 2007 | Completed final sign-off Sep 2007 | 160 Eastwood Dr | development of cover floor into habitable space. new bath, playroom, home office & guest bed. new window well below existing bay window. new window at side for light @ lower level.Details
development of cover floor into habitable space. new bath, playroom, home office & guest bed. new window well below existing bay window. new window at side for light @ lower level. | $75,000 | |
| Mar 19, 2007 | Completed final sign-off Oct 2007 | 280 Lily St | renew for final only 200408111284 and 200510276752.Details
renew for final only 200408111284 and 200510276752. | ||
| Sep 26, 2005 | Completed final sign-off Jun 2006 | 53 Van Buren St | kitchen remodel with property line window.Details
kitchen remodel with property line window. | $35,000 | |
| Jul 26, 2004 | Never finaled issued Mar 2005, no final | 262 Andover St | renovation of interior, (n) bath & kitchen, (n) deck & stairs,(n) trellisDetails
renovation of interior, (n) bath & kitchen, (n) deck & stairs,(n) trellis | $50,000 |