Chester Gatdula
- Listed as
- architect, engineer
- Firm
- Bluejay Structures
- Based in
- Fairfield
- On San Francisco permits
- Dec 2021 to Nov 2025
14 permits since 2000 (engineer on 13 permits, architect on 1 permit): 12 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2025 | In progress filed Nov 2025, not yet issued | 3183 Cesar Chavez St | Pro H & M Construction Inc | common area - removing wall in garage & 1 doorDetails
common area - removing wall in garage & 1 door | $900 |
| May 4, 2025 | Completed final sign-off Jun 2026 | 3183 Cesar Chavez St | Pro H & M Construction Inc | remodel ground floor by adding office and kitchenette, fully remodel second and third floors. exterior work are including skylights, windows, exterior doors, paint and patch stucco, entry gate, entry tile, and lighting.Details
remodel ground floor by adding office and kitchenette, fully remodel second and third floors. exterior work are including skylights, windows, exterior doors, paint and patch stucco, entry gate, entry tile, and lighting. | $700,000 |
| May 2, 2025 | Completed final sign-off Aug 2025 | 38 Parnassus Av | Ideal Builders | 3/f: conversion of (e) primary bedroom into (2) bedrooms. new non-bearing wall and doors. remove (e) grill in kitchen. no exterior work.Details
3/f: conversion of (e) primary bedroom into (2) bedrooms. new non-bearing wall and doors. remove (e) grill in kitchen. no exterior work. | $8,000 |
| Sep 19, 2024 | Completed final sign-off Oct 2025 | 360 West Portal Av | structural support systems,deck landing platforms, new lighting, and deck modification for replacement wheel chair lift.to address nov 2024-2006, including structural foundation and framing. the ca state permit and ca state inspections will be procured and coordinated by diamond elevator.Details
structural support systems,deck landing platforms, new lighting, and deck modification for replacement wheel chair lift.to address nov 2024-2006, including structural foundation and framing. the ca state permit and ca state inspections will be procured and coordinated by diamond elevator. | $165,000 | |
| Sep 17, 2024 | Completed final sign-off Mar 2025 | 352 Dolores St | B Birmingham Inc. | replace existing interior damaged non structural slab with new non structural slab in storage room.Details
replace existing interior damaged non structural slab with new non structural slab in storage room. | $7,000 |
| Apr 19, 2024 | Completed final sign-off Jan 2025 | 2011 Oak St | Ideal Builders | rev to pa# 2024-0117-4076; reconfiguration of 2 existing bathrooms in one of 4 units, new windows in lightwell, level kitchen floor and reinstall existing cabintry, removal of one bathroom sink and shower head.Details
rev to pa# 2024-0117-4076; reconfiguration of 2 existing bathrooms in one of 4 units, new windows in lightwell, level kitchen floor and reinstall existing cabintry, removal of one bathroom sink and shower head. | |
| Apr 8, 2024 | Completed final sign-off Sep 2024 | 520 Noriega St | Sage Construction Services | revision to pa# 202402075433. structural updates to address inadequate framing at bathroom and to mount heat pump to rear of bldg.Details
revision to pa# 202402075433. structural updates to address inadequate framing at bathroom and to mount heat pump to rear of bldg. | $3,000 |
| Feb 7, 2024 | Completed final sign-off Sep 2024 | 520 Noriega St | Sage Construction Services | renovation of primary bathroom & closet, renovation of kitchen. refinishing of basement & window upgrade. add hvac unit at rear yard.Details
renovation of primary bathroom & closet, renovation of kitchen. refinishing of basement & window upgrade. add hvac unit at rear yard. | $90,000 |
| Jun 2, 2023 | Completed final sign-off Sep 2023 | 5840 Geary Bl | to comply with nov 202200062: paint window frames, replace glass. framing at front overhang awning by provious owner w/o permit, hired structural engineer to perform cals to approve workDetails
to comply with nov 202200062: paint window frames, replace glass. framing at front overhang awning by provious owner w/o permit, hired structural engineer to perform cals to approve work | $5,000 | |
| Jan 23, 2023 | Expired or cancelled withdrawn Feb 2024 | 520 Noriega St | remodel of primary bathroom, kids bathroom & basement. work to include demo, new plumbing fixtures, lighting, finishes & millwork/ cabinetry. no added square footage. no vertical or horizontal expansions.Details
remodel of primary bathroom, kids bathroom & basement. work to include demo, new plumbing fixtures, lighting, finishes & millwork/ cabinetry. no added square footage. no vertical or horizontal expansions. | $50,000 | |
| Nov 21, 2022 | Completed final sign-off Sep 2023 | 3580 Washington St | Broad Oaks Construction Inc | 2/f: replace handrails @ (e) stairs. demolish (e) secondary stair. patch w/ new partitions & ceiling. 3rd fl: demo n.w. stairwell to 4/f. patch w/ new floor. new laundry closet. new lighting in (e) ceilings. demo (e) ceiling for new stair opening. extend stair stairwell (s.e. side) to 4/f. 4/f: demoDetails
2/f: replace handrails @ (e) stairs. demolish (e) secondary stair. patch w/ new partitions & ceiling. 3rd fl: demo n.w. stairwell to 4/f. patch w/ new floor. new laundry closet. new lighting in (e) ceilings. demo (e) ceiling for new stair opening. extend stair stairwell (s.e. side) to 4/f. 4/f: demo | $42,000 |
| Nov 16, 2022 | Completed final sign-off Jan 2023 | 1372 Hayes St | Nt Bay Area Construction Inc | bath room remodel replace bath tub to standing shower, with water proofing and new tile work inside shower walls and shower floor, remove non-load bearing wall inside closet and add an non load bearing wall per planDetails
bath room remodel replace bath tub to standing shower, with water proofing and new tile work inside shower walls and shower floor, remove non-load bearing wall inside closet and add an non load bearing wall per plan | $6,000 |
| Jul 11, 2022 | Completed final sign-off Sep 2022 | 1557 Church St | A L V Construction Inc | kitchen & bathroom remodel on 1st fl. remove wall from kitchen to dining room. install new beam with 3 piers/ footing in garage level. beam to be installed in kitchen.Details
kitchen & bathroom remodel on 1st fl. remove wall from kitchen to dining room. install new beam with 3 piers/ footing in garage level. beam to be installed in kitchen. | $80,000 |
| Dec 23, 2021 | Completed final sign-off Dec 2022 | 74 Vista Verde Ct | Blue Star Construction | revision to pa# 202111122283. (2) concrete footings. keep existing 6x14 wood girder beam & posts in garage in lieu of new stl beam. replace with new footings for existing posts.Details
revision to pa# 202111122283. (2) concrete footings. keep existing 6x14 wood girder beam & posts in garage in lieu of new stl beam. replace with new footings for existing posts. | $500 |