Pro H & M Construction Inc
- Based in
- Millbrae
- On San Francisco permits
- Jun 2024 to Nov 2025
- Last 24 months
- 8 permits filed
11 permits since 2000: 10 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2025 | In progress filed Nov 2025, not yet issued | 3183 Cesar Chavez St | common area - removing wall in garage & 1 doorDetails
common area - removing wall in garage & 1 door | $900 |
| Sep 24, 2025 | Completed final sign-off Jun 2026 | 3183 Cesar Chavez St | revisiion to permit#202504154493: aluminum clad windows changed to fiberglass, street visibleDetails
revisiion to permit#202504154493: aluminum clad windows changed to fiberglass, street visible | |
| Sep 18, 2025 | Completed final sign-off Nov 2025 | 170 Blake St | units 1 and 3: replacing 12 windows in unit #1 and #3 from aluminum to vinyl at front. windows to be replaced in existing openings, u<=0.30. street facing.Details
units 1 and 3: replacing 12 windows in unit #1 and #3 from aluminum to vinyl at front. windows to be replaced in existing openings, u<=0.30. street facing. | $11,200 |
| May 5, 2025 | Completed final sign-off Aug 2025 | 34 Princeton St | revision to 202412096379: rearrange 2 bathrooms at 2nd fl (no fixture change). deleted 2 closet & 1 window, relocate laundry at ground flDetails
revision to 202412096379: rearrange 2 bathrooms at 2nd fl (no fixture change). deleted 2 closet & 1 window, relocate laundry at ground fl | |
| May 4, 2025 | Completed final sign-off Jun 2026 | 3183 Cesar Chavez St | remodel ground floor by adding office and kitchenette, fully remodel second and third floors. exterior work are including skylights, windows, exterior doors, paint and patch stucco, entry gate, entry tile, and lighting.Details
remodel ground floor by adding office and kitchenette, fully remodel second and third floors. exterior work are including skylights, windows, exterior doors, paint and patch stucco, entry gate, entry tile, and lighting. | $700,000 |
| Jan 6, 2025 | Completed final sign-off Mar 2025 | 128 Wilmot St | replacing 2 windows and 2 sliding doors in front in fiberglassDetails
replacing 2 windows and 2 sliding doors in front in fiberglass | $4,000 |
| Dec 9, 2024 | Completed final sign-off Aug 2025 | 34 Princeton St | remodel (e) kitchen, 2 (e) full bathroom, & replace partial (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bathroom, family room, media room & install wetbar at g/f.Details
remodel (e) kitchen, 2 (e) full bathroom, & replace partial (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bathroom, family room, media room & install wetbar at g/f. | $283,000 |
| Nov 6, 2024 | Completed final sign-off Dec 2024 | 1414 Kansas St | siding replacement. installing tyvek house wrap ~650 sqft then 1 layer of fiber cement lap siding over existing wood siding. painting 1 coat of primer and 1~2 coats of paint on the new lap siding only.Details
siding replacement. installing tyvek house wrap ~650 sqft then 1 layer of fiber cement lap siding over existing wood siding. painting 1 coat of primer and 1~2 coats of paint on the new lap siding only. | $21,800 |
| Sep 23, 2024 | Completed final sign-off Oct 2024 | 1468 08th Av | at 3rd floor, top unit, remodel (e) sewing room to new laundry room.Details
at 3rd floor, top unit, remodel (e) sewing room to new laundry room. | $6,000 |
| Jul 26, 2024 | Completed final sign-off Oct 2024 | 1468 08th Av | remodel 2 bathrooms and kitchen in kind. no wall changes. bathroom: install new tiles, replace bath tubb, shower an, replace vainities, install new faucets. kitchen replace new cabinets. add 9 recessed lightsDetails
remodel 2 bathrooms and kitchen in kind. no wall changes. bathroom: install new tiles, replace bath tubb, shower an, replace vainities, install new faucets. kitchen replace new cabinets. add 9 recessed lights | $36,000 |
| Jun 3, 2024 | Completed final sign-off Jun 2024 | 186 Farallones St | applying new underlayment and hardie board siding over (e) wood siding approx 1,300 square feet to left and right sides only. not street facingDetails
applying new underlayment and hardie board siding over (e) wood siding approx 1,300 square feet to left and right sides only. not street facing | $12,000 |