Back to bathroom remodel contractors
Terranova Construction
- Based in
- Novato
- On San Francisco permits
- Jan 2021 to Feb 2025
- Last 24 months
- 3 permits filed
21 permits since 2000: 16 completed, 2 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 2 in progress. Typically 0 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2025 | Completed final sign-off May 2025 | 19 Loyola Tr | ist floor, #21: upgrade bathroom. shower pan, temp valve, faucet, ptraps, sinks. upgrade dimmers, humidity sensor, dedicated line for heat matt. like for likeDetails
ist floor, #21: upgrade bathroom. shower pan, temp valve, faucet, ptraps, sinks. upgrade dimmers, humidity sensor, dedicated line for heat matt. like for like | $28,000 |
| Jan 27, 2025 | In progress issued Jan 2025 | 4150 17th St | remodel of kitchen add built in seatery, remodel main floor bath nw single vanity , replace shower plumbing, new toilet con flush new tile, new closet, remodele main bath new tub new plumbing and fixtures new tile new to code kitchen electricalDetails
remodel of kitchen add built in seatery, remodel main floor bath nw single vanity , replace shower plumbing, new toilet con flush new tile, new closet, remodele main bath new tub new plumbing and fixtures new tile new to code kitchen electrical | $56,000 |
| Nov 1, 2024 | Completed final sign-off Mar 2025 | 650 Delancey St | kitchen remodel like for like. bathroom remodel like for like. partial bathroom remodel like for like.Details
kitchen remodel like for like. bathroom remodel like for like. partial bathroom remodel like for like. | $95,000 |
| Sep 5, 2024 | Completed final sign-off Dec 2024 | 172 Everson St | bathroom upgrade. replace tub,toilet, vanity,sink, faucet, flooring. replace lights and switches and paint, no wall demolition or construction, no change in plumbing fixture/unit count.Details
bathroom upgrade. replace tub,toilet, vanity,sink, faucet, flooring. replace lights and switches and paint, no wall demolition or construction, no change in plumbing fixture/unit count. | $19,000 |
| Jun 20, 2024 | Completed final sign-off Sep 2024 | 172 Everson St | like for like bathroom remodel - shower pan installation. no major electrical or plumbing work.Details
like for like bathroom remodel - shower pan installation. no major electrical or plumbing work. | $20,000 |
| Feb 7, 2024 | In progress issued Feb 2024 | 2674 24th Av | one bath remodel. all fixtures stay in the same location. replacement of toilet vanity. exhaust fan, shower head body. replacment of light switch, dimmer and humidity sensor. tile work inside shower and floor. all non structuralDetails
one bath remodel. all fixtures stay in the same location. replacement of toilet vanity. exhaust fan, shower head body. replacment of light switch, dimmer and humidity sensor. tile work inside shower and floor. all non structural | $20,000 |
| Oct 27, 2023 | Completed final sign-off Mar 2025 | 414 Clayton St | 1 kitchen and 1 bathroom remodel like to like. 1 washer and dryer room remodel like to like.Details
1 kitchen and 1 bathroom remodel like to like. 1 washer and dryer room remodel like to like. | $80,000 |
| Jun 9, 2022 | Completed final sign-off Sep 2022 | 1097 Howard St | unit #306: 78 sqft bathroom remodel on mezzanine level. relocate (e) vanity to opposite wall and add another. replace (e) tub/ shower with (n) curbed shower. all (n) fixtures + finishes.Details
unit #306: 78 sqft bathroom remodel on mezzanine level. relocate (e) vanity to opposite wall and add another. replace (e) tub/ shower with (n) curbed shower. all (n) fixtures + finishes. | $16,000 |
| Jun 1, 2022 | Completed final sign-off Feb 2023 | 1748 20th Av | in kind kitchen remodel. in kind 3 bathroom remodel.Details
in kind kitchen remodel. in kind 3 bathroom remodel. | $50,000 |