Block 0192, lot 002
1019 Stockton St
- City’s use
- Multi-Family Residential
- Built
- 1913
- Stories
- 3
- Units
- 34
- Rooms
- 12 bathrooms
- Building
- 20,194 sq ft
- Lot
- 9,117 sq ft
- Zoning
- CRNC
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2021 | Completed final sign-off Feb 2022 | 1019 Stockton St | Dissmeyer Corp, Dba Acme Roofing Co | reroofing.Details
reroofing. | $155,000 |
| May 15, 2014 | Completed final sign-off Sep 2016 | 1019 Stockton St | Dpr Construction Inc | temporary emergency shoring. underpinning and shotcrete reinforcement to stabilize soil. revision to app#201303111914Details
temporary emergency shoring. underpinning and shotcrete reinforcement to stabilize soil. revision to app#201303111914 | $57,000 |
| May 10, 2013 | Completed final sign-off Sep 2016 | 1019 Stockton St | Dpr Construction | fill - add permiating grout to reinforce soil @ basement wall revision to 201303111914Details
fill - add permiating grout to reinforce soil @ basement wall revision to 201303111914 | $8,000 |
| May 1, 2013 | Expired or cancelled cancelled Jan 2026 | 1019 Stockton St | reduction in the scope of work under pa#201303293360, deletion of the access lift, striped path at grade and stairs.Details
reduction in the scope of work under pa#201303293360, deletion of the access lift, striped path at grade and stairs. | ||
| Mar 29, 2013 | Completed final sign-off Sep 2016 | 1019 Stockton St | Dpr Construction | construction of temporary egress ramp & wheelchair lift for egress from building to trenton street. remp & lift are temporary and will be removed upon the completion of construction of the chinese hospital to be complete 2016.Details
construction of temporary egress ramp & wheelchair lift for egress from building to trenton street. remp & lift are temporary and will be removed upon the completion of construction of the chinese hospital to be complete 2016. | $20,000 |
| Mar 11, 2013 | Completed final sign-off Sep 2016 | 1019 Stockton St | Dpr Construction | tie back for 835 jackson street, excavation shoring (primary excavation and shoring under permit app #201303111902)Details
tie back for 835 jackson street, excavation shoring (primary excavation and shoring under permit app #201303111902) | |
| Mar 2, 2012 | Never finaled issued Mar 2012, no final | 1023 Stockton St | street space with 7 days mta meter.Details
street space with 7 days mta meter. | ||
| Dec 7, 2010 | Completed final sign-off Apr 2012 | 1023 Stockton St | Mayta & Jensen | ground floor -convert existing office into a new atm vestibule, replace & relocate atm machine, relocate exisitng night depository.Details
ground floor -convert existing office into a new atm vestibule, replace & relocate atm machine, relocate exisitng night depository. | $28,500 |
| Apr 22, 2010 | Never finaled issued Apr 2010, no final | 1021 Stockton St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Nov 20, 2009 | Completed final sign-off Jan 2010 | 1023 Stockton St | Arrow Sign Company | revision to pa# 2009.09.25.7669. alternate method of sign attachmentDetails
revision to pa# 2009.09.25.7669. alternate method of sign attachment | |
| Sep 25, 2009 | Completed final sign-off Jan 2010 | 1023 Stockton St | Arrow Sign Company | 2 new electric signsDetails
2 new electric signs | $10,000 |
| Apr 28, 2009 | Completed final sign-off Jun 2009 | 1019 Stockton St | Mayta & Jensen | revision to pa #200903174258 for revise structural detail. 1 hour backcheck for structural review.Details
revision to pa #200903174258 for revise structural detail. 1 hour backcheck for structural review. | |
| Mar 17, 2009 | Completed final sign-off Jun 2009 | 1019 Stockton St | Mayta & Jensen | remove existing post at front of building.Details
remove existing post at front of building. | $40,000 |
| Feb 12, 2008 | Completed final sign-off Mar 2008 | 1019 Stockton St | in fill property line opening near northewst corner. opening to be infilled is not legal.Details
in fill property line opening near northewst corner. opening to be infilled is not legal. | $3,000 | |
| Jan 23, 2008 | Expired or cancelled cancelled Jan 2026 | 1019 Stockton St | infill property line with 4 hour masonry wallDetails
infill property line with 4 hour masonry wall | $3,000 | |
| Jun 24, 2003 | Completed final sign-off Dec 2003 | 1019 Stockton St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $37,393 |
| Feb 12, 2002 | Completed final sign-off Mar 2002 | 1019 Stockton St | Mayta & Jensen | demo at bank interior as shown on drawings onlyDetails
demo at bank interior as shown on drawings only | $1,500 |
| Jan 23, 2002 | Completed final sign-off Mar 2003 | 1019 Stockton St | Mayta & Jensen | umb seismic upgrades per plans bolts-plusDetails
umb seismic upgrades per plans bolts-plus | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mayta & Jensen (5), Dpr Construction (3), Arrow Sign Company (2), Dissmeyer Corp, Dba Acme Roofing Co, Dpr Construction Inc, The Lawson Roofing Co Inc.
- Architects
- Harvey Hacker, Ken Eng
- Engineers
- Peter Bekey (2), Carl Chan, Carl Chun
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.