Rudolph Commercial Interiors Inc, Rci
- Based in
- Oakland
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 23 permits filed
839 permits since 2000: 662 completed, 13 in progress, 83 never finaled, 81 expired or cancelled.
Of the 83 never-finaled permits, 10 are 3 to 5 years old, 24 are 5 to 10 years old, 49 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 never finaled. Typically 29 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2018 | Completed final sign-off Jan 2019 | 2315 Broadway | maintenance and repair - remove dry rot wood members from (e) concrete fence wall, replace with concrete to match (e). replace (e) concrete stairs & handrail. install new guardrailDetails
maintenance and repair - remove dry rot wood members from (e) concrete fence wall, replace with concrete to match (e). replace (e) concrete stairs & handrail. install new guardrail | $26,000 |
| Apr 27, 2017 | Completed final sign-off Jun 2018 | 1256 Market St | tenant improvement to make 2nd fl space accessible including removel of (e) stairs, replacement of restrooms and installation of elevator. 2nd flr interior work only.Details
tenant improvement to make 2nd fl space accessible including removel of (e) stairs, replacement of restrooms and installation of elevator. 2nd flr interior work only. | $185,000 |
| Feb 8, 2016 | Never finaled issued Mar 2016, no final | 201 California St | 15th and 16th floors: the scope of this project is to demolished a stair and slab to be in filled.Details
15th and 16th floors: the scope of this project is to demolished a stair and slab to be in filled. | $84,211 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 44 Montgomery St | 18,19th flr: ste 1900: infill @stair opening @19th flr shall be infilled with new concrete over metal deck,(stair between 18th & 19th flrs, infill on 19th flr); all top of new concrete slab over new metal deck shall align with the top of existing slab; maher n/aDetails
18,19th flr: ste 1900: infill @stair opening @19th flr shall be infilled with new concrete over metal deck,(stair between 18th & 19th flrs, infill on 19th flr); all top of new concrete slab over new metal deck shall align with the top of existing slab; maher n/a | $45,000 |
| Jul 17, 2012 | Completed final sign-off Dec 2012 | 44 Montgomery St | 27th floor t.i. - demolishing of non-structural partitions & bldg new non-structural prtitions. all new or revised hvac, electrical, plumbing included in this permit. life safety, sprinklers if needed under separate permit. fully sprinklered bldg. infill old stair/floor area. high density file.Details
27th floor t.i. - demolishing of non-structural partitions & bldg new non-structural prtitions. all new or revised hvac, electrical, plumbing included in this permit. life safety, sprinklers if needed under separate permit. fully sprinklered bldg. infill old stair/floor area. high density file. | $1,450,000 |
| Nov 10, 2010 | Completed final sign-off May 2011 | 114 Sansome St | (13th floor) t.i. includes demolition of non-structural partitions and building new-nonstructural partitions, an internal stair. all new or revised hvac, electrical plumbing and life safety work will be design-build kand under separate permit. (building fully sprinklered.) structural includedDetails
(13th floor) t.i. includes demolition of non-structural partitions and building new-nonstructural partitions, an internal stair. all new or revised hvac, electrical plumbing and life safety work will be design-build kand under separate permit. (building fully sprinklered.) structural included | $75,000 |
| May 25, 2007 | Completed final sign-off Feb 2008 | 455 Market St | the scope of work includes improvements to an (e) elevator lobby & t24 upgrades to (e) men's & women's restrooms and replacement of stair enclosure doors. all work on 21st floor. electrical, mechanical, life safety, sprinklers to be submitted on separate permits.Details
the scope of work includes improvements to an (e) elevator lobby & t24 upgrades to (e) men's & women's restrooms and replacement of stair enclosure doors. all work on 21st floor. electrical, mechanical, life safety, sprinklers to be submitted on separate permits. | $80,000 |