Rudolph Commercial Interiors Inc, Rci
- Based in
- Oakland
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 23 permits filed
839 permits since 2000: 662 completed, 13 in progress, 83 never finaled, 81 expired or cancelled.
Of the 83 never-finaled permits, 10 are 3 to 5 years old, 24 are 5 to 10 years old, 49 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 expired or cancelled. Typically 21 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 44 Montgomery St | 18,19th flr: ste 1900: infill @stair opening @19th flr shall be infilled with new concrete over metal deck,(stair between 18th & 19th flrs, infill on 19th flr); all top of new concrete slab over new metal deck shall align with the top of existing slab; maher n/aDetails
18,19th flr: ste 1900: infill @stair opening @19th flr shall be infilled with new concrete over metal deck,(stair between 18th & 19th flrs, infill on 19th flr); all top of new concrete slab over new metal deck shall align with the top of existing slab; maher n/a | $45,000 |
| Mar 20, 2012 | Completed final sign-off Jan 2013 | 300 Brannan St | barrier removal work only. demo of existing toilet rooms and corridors including partitions and associated electrical. construction of new accessible toilet rooms including floor to deck partitions. associated disable access upgrades. mep separate permit.Details
barrier removal work only. demo of existing toilet rooms and corridors including partitions and associated electrical. construction of new accessible toilet rooms including floor to deck partitions. associated disable access upgrades. mep separate permit. | $59,360 |
| Sep 29, 2011 | Completed final sign-off Oct 2011 | 21 Stillman St | new deck surfacesDetails
new deck surfaces | $5,000 |
| Oct 17, 2002 | Expired or cancelled expired Feb 2006 | 658 46th Av | remove sunroom & deck, add 2 bedrooms @ 2nd level, add 1 bedroom w/bath, change 1 bedroom toDetails
remove sunroom & deck, add 2 bedrooms @ 2nd level, add 1 bedroom w/bath, change 1 bedroom to | $95,000 |