Ck Water Systems And Landscape Developme
- Based in
- San Rafael
- On San Francisco permits
- Apr 2025 to Apr 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2025 | Completed final sign-off May 2026 | 729 Kirkwood Av | prop h:renovation of outdoor play area including:protection of all(e)canopy trees;demolition & removal of existing exterior paving surfaces & the corresponding surface base course.demolition & removal of (e)playground climbing structures;demolition & removal of(e)onsite chain link fencing.Details
prop h:renovation of outdoor play area including:protection of all(e)canopy trees;demolition & removal of existing exterior paving surfaces & the corresponding surface base course.demolition & removal of (e)playground climbing structures;demolition & removal of(e)onsite chain link fencing. | $785,000 |
| Apr 9, 2025 | In progress issued Mar 2026 | 4080 Mission St | prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5.Details
prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5. | $785,000 |