Patricia Algara
- Listed as
- architect
- Firm
- Base Landscape Architect
- Based in
- San Francisco
- On San Francisco permits
- Feb 2024 to Apr 2025
6 permits since 2000 (architect on 6 permits): 2 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2025 | Completed final sign-off Aug 2026 | 560 Ellis St | Bauman Landscape & Construction Inc. | renovation of an (e) children's play area w/ new play equipment, resilient play surfacing, upgrades to (e) soccer pitch, new seating, new drinking fountain, modifications to fencing, modification to (e) ramp handrails to meet ada, removal of hardscape, subsurface drainage to tie into (e) system andDetails
renovation of an (e) children's play area w/ new play equipment, resilient play surfacing, upgrades to (e) soccer pitch, new seating, new drinking fountain, modifications to fencing, modification to (e) ramp handrails to meet ada, removal of hardscape, subsurface drainage to tie into (e) system and | $1,400,000 |
| Apr 9, 2025 | In progress issued Mar 2026 | 4080 Mission St | Ck Water Systems And Landscape Developme | prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5.Details
prop h:complete renovation of children's play area.this includes removing(e) plastic play equipment & the synthetic safety surface beath it.the new play area will feature a nature play theme,incorporating robina wood play equipment suitable for children aged 2-5. | $785,000 |
| Apr 9, 2025 | In progress issued Feb 2026 | 1011 Garfield St | Art Garden Design Inc Dba Art Garden Des | prop h: project involves a renovation of the children's play area and access/egress to the playground from the exterior sidewalk.this includes the removal of the(e)ramp,including handrails & landings,& a portion of the(e)fence adjacent to the ramp.new accessible walkway from the sidewalk entranceDetails
prop h: project involves a renovation of the children's play area and access/egress to the playground from the exterior sidewalk.this includes the removal of the(e)ramp,including handrails & landings,& a portion of the(e)fence adjacent to the ramp.new accessible walkway from the sidewalk entrance | $290,000 |
| Apr 9, 2025 | Completed final sign-off May 2026 | 729 Kirkwood Av | Ck Water Systems And Landscape Developme | prop h:renovation of outdoor play area including:protection of all(e)canopy trees;demolition & removal of existing exterior paving surfaces & the corresponding surface base course.demolition & removal of (e)playground climbing structures;demolition & removal of(e)onsite chain link fencing.Details
prop h:renovation of outdoor play area including:protection of all(e)canopy trees;demolition & removal of existing exterior paving surfaces & the corresponding surface base course.demolition & removal of (e)playground climbing structures;demolition & removal of(e)onsite chain link fencing. | $785,000 |
| Feb 13, 2024 | In progress issued Jul 2025 | 400 Guerrero St | Able Maintenance Inc | remove & replace underground storage tanks(usts) and piping. install new fuel dispensers.Details
remove & replace underground storage tanks(usts) and piping. install new fuel dispensers. | $500,000 |
| Feb 13, 2024 | In progress issued Jul 2025 | 400 Guerrero St | Able Maintenance Inc | demo a service station canopyDetails
demo a service station canopy | $15,000 |