Boldt California Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2020 to May 2022
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2022 | Completed final sign-off Jul 2023 | 3838 California St | ste 805: remodel of an existing medical office suite within an 8-story building above grade.Details
ste 805: remodel of an existing medical office suite within an 8-story building above grade. | $2,561,000 |
| Dec 8, 2020 | Never finaled issued Dec 2020, no final | 1001 Potrero Av | request to shift fire hydrant #1 north approx. 50 feet and tie in at same location as fh #2. request to shift fh #3 east approx. 37 feet. no change to size of hydrants. hydrants within 100" of approved fdcs. original locations of hydrants approved in dbi building app. 20201-0116-2041. also referenceDetails
request to shift fire hydrant #1 north approx. 50 feet and tie in at same location as fh #2. request to shift fh #3 east approx. 37 feet. no change to size of hydrants. hydrants within 100" of approved fdcs. original locations of hydrants approved in dbi building app. 20201-0116-2041. also reference | |
| Sep 16, 2020 | Completed final sign-off Oct 2021 | 1001 Potrero Av | revision to pa#202001162041 - shifted vermont street stairs and vehicle ramp in the northeast corner of the project west approximately 2 feet. removed two parking spaces on vermont street for increased visibility. minor revisions to underground site electrical and plumbingDetails
revision to pa#202001162041 - shifted vermont street stairs and vehicle ramp in the northeast corner of the project west approximately 2 feet. removed two parking spaces on vermont street for increased visibility. minor revisions to underground site electrical and plumbing | |
| Jan 16, 2020 | Completed final sign-off Oct 2021 | 1001 Potrero Av | special project for partial replacement of existing surface parking lot, relocate & remove existing utilities, utitlities wil be installed to support future bldg, north side of project wil have parking reconfigured and new private roadway and ramp existing onto vermont street.Details
special project for partial replacement of existing surface parking lot, relocate & remove existing utilities, utitlities wil be installed to support future bldg, north side of project wil have parking reconfigured and new private roadway and ramp existing onto vermont street. | $3,950,000 |