Farshad Khodayari
- Listed as
- architect, engineer
- Firm
- Soha Engineers
- Based in
- San Francisco
- On San Francisco permits
- Dec 2008 to Aug 2022
5 permits since 2000 (engineer on 3 permits, architect on 2 permits): 2 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 23, 2022 | Completed final sign-off Aug 2024 | 1001 Potrero Av | buildings 10, 20, & 30: each building built equally: installation of vertical strips of stainles steel welded wire mesh to function as a debris containment netting as the 5th floor level of bldgs.Details
buildings 10, 20, & 30: each building built equally: installation of vertical strips of stainles steel welded wire mesh to function as a debris containment netting as the 5th floor level of bldgs. | $20,000 | |
| Jun 15, 2022 | Never finaled issued Apr 2023, no final | 111 Taylor St | Esquivel Grading & Paving, Inc. | modification to existing basement roof to accomodate sidewalk modification by sfdpw.Details
modification to existing basement roof to accomodate sidewalk modification by sfdpw. | $20,000 |
| Jun 15, 2021 | Completed final sign-off Jan 2022 | 427 Oak St | D E F Co | to comply with nov 201523361: soil replacement with controlled low strenth materials in breezeway; rpelacement of breezeway slab on grade; to remove lateral soil oading on the adj property basement wall.Details
to comply with nov 201523361: soil replacement with controlled low strenth materials in breezeway; rpelacement of breezeway slab on grade; to remove lateral soil oading on the adj property basement wall. | $55,000 |
| Dec 12, 2008 | Never finaled issued Apr 2009, no final | 660 Washington St | shoring work at vacant lot per plan. lot 10 shoring on 200812128421Details
shoring work at vacant lot per plan. lot 10 shoring on 200812128421 | $200,000 | |
| Dec 12, 2008 | Never finaled issued Apr 2009, no final | 808 Kearny St | shoring work at vacant lot per plan including soil nail wall. lot 9 shoring on app 200812128422.Details
shoring work at vacant lot per plan including soil nail wall. lot 9 shoring on app 200812128422. | $450,000 |