Beyza Demirtas
- Listed as
- architect, engineer
- Firm
- Lda Architects Inc
- Based in
- Sf
- On San Francisco permits
- Jun 2021 to May 2025
4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 3 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 1, 2025 | In progress filed May 2025, not yet issued | 1001 Potrero Av | bldg #3: carr auditorium to provide accessible seating, new carpeting, with contract stripe & new handrails at e) auditorium. provide new accessible unisex restroom, upgrade e) signage to direct to revised spaces, mod, e) entry door thresholdDetails
bldg #3: carr auditorium to provide accessible seating, new carpeting, with contract stripe & new handrails at e) auditorium. provide new accessible unisex restroom, upgrade e) signage to direct to revised spaces, mod, e) entry door threshold | $450,000 | |
| Jun 4, 2024 | Completed final sign-off Dec 2024 | 900 Franklin St | repair & replace e) metal guardrail along willow st. e) elevator equipment modernization, boiler replacement & fire alarm upgrades part of deferred submittal. convert 1 room to (n) laundry rm at ground flDetails
repair & replace e) metal guardrail along willow st. e) elevator equipment modernization, boiler replacement & fire alarm upgrades part of deferred submittal. convert 1 room to (n) laundry rm at ground fl | $740,000 | |
| Jan 21, 2022 | Completed final sign-off Jun 2022 | 1076 Howard St | Buhler Commercial | revision to bpa2021-0726-5052: revised fixtures, (n) door swing & partition rm 102;(n) wall & door swing @ conference rm 201; ceiling height rm 206;(n) door swing restrm 208;reconfigure restrm 209; door schedule;add hss frames;roof framing @ mech units & special inspections.Details
revision to bpa2021-0726-5052: revised fixtures, (n) door swing & partition rm 102;(n) wall & door swing @ conference rm 201; ceiling height rm 206;(n) door swing restrm 208;reconfigure restrm 209; door schedule;add hss frames;roof framing @ mech units & special inspections. | |
| Jun 15, 2021 | Completed final sign-off Oct 2022 | 360 Berry St | Belz Construction Inc | lobby area: architectural and interior finish upgrades to an (e) lobby in a residential bldg. new conference room and closet and reconfiguration of mail room. upgrades to new accessory areas include minor mech and electrical improvements to (e) systems, ventilation, power and data to newly configureDetails
lobby area: architectural and interior finish upgrades to an (e) lobby in a residential bldg. new conference room and closet and reconfiguration of mail room. upgrades to new accessory areas include minor mech and electrical improvements to (e) systems, ventilation, power and data to newly configure | $60,000 |