Coastwest Fire Protection
- Based in
- El Granada
- On San Francisco permits
- Mar 2017 to Dec 2025
- Last 24 months
- 1 permit filed
23 permits since 2000: 20 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2025 | Completed final sign-off Jan 2026 | 520 Chestnut St | ti 202506058021- unit 401- for (e) fire sprinkler system to relocate (2) headsDetails
ti 202506058021- unit 401- for (e) fire sprinkler system to relocate (2) heads | $1,500 |
| Mar 25, 2024 | In progress issued Mar 2024 | 209 Lincoln Wy | overhead design and installaion of the automataic fire system total of 162 sprinklers, underground design included for calculations, but intall and permit no in this scopeDetails
overhead design and installaion of the automataic fire system total of 162 sprinklers, underground design included for calculations, but intall and permit no in this scope | $20,000 |
| Jan 25, 2023 | Completed final sign-off Jan 2023 | 2300 16th St | relocate 3 sprinklers for t.i. work in an (e) fire sprinkler system, ref 202210244991Details
relocate 3 sprinklers for t.i. work in an (e) fire sprinkler system, ref 202210244991 | $2,500 |
| Sep 16, 2022 | Completed final sign-off Sep 2022 | 900 Kearny St | as built design changes to original approved fire sprinkler design. new sprinkler count of 8 existing, 24 relocate, 10 add ref #202205174438Details
as built design changes to original approved fire sprinkler design. new sprinkler count of 8 existing, 24 relocate, 10 add ref #202205174438 | $10,000 |
| Jun 15, 2022 | Never finaled issued Jun 2022, no final | 900 Kearny St | 6th floor: relocate 9 pendent fire sprinkler heads. add 3 upright sprinkler heads.Details
6th floor: relocate 9 pendent fire sprinkler heads. add 3 upright sprinkler heads. | $10,000 |
| Apr 14, 2022 | Completed final sign-off Apr 2022 | 650 02nd St | as-built. remodel of extg sprinker system. remove 2 heads at removed soffit. ref 202201125836 and 202202117823.Details
as-built. remodel of extg sprinker system. remove 2 heads at removed soffit. ref 202201125836 and 202202117823. | $5,000 |
| Mar 21, 2022 | Never finaled issued Mar 2022, no final | 900 Kearny St | 1st fl & basement: relocate 18 fire sprinkler heads.Details
1st fl & basement: relocate 18 fire sprinkler heads. | $10,000 |
| Mar 21, 2022 | Completed final sign-off Sep 2022 | 900 Kearny St | 2nd fl: relocate 8 pendant fire sprinkler heads. add 11 pendant fire sprinkler heads. ref 202205174438Details
2nd fl: relocate 8 pendant fire sprinkler heads. add 11 pendant fire sprinkler heads. ref 202205174438 | $10,000 |
| Feb 11, 2022 | Completed final sign-off Jun 2022 | 650 02nd St | remodel of (e) sprinkler system added 2 sprinkler in soffit per inspector's request. ref pa 2022-0112-5836Details
remodel of (e) sprinkler system added 2 sprinkler in soffit per inspector's request. ref pa 2022-0112-5836 | $5,000 |
| Jan 12, 2022 | Completed final sign-off Jan 2022 | 900 Kearny St | as-built sprinkler plans to ref# 202112063748. #300Details
as-built sprinkler plans to ref# 202112063748. #300 | $5,000 |
| Jan 12, 2022 | Completed final sign-off Apr 2022 | 650 02nd St | remodel of (e) fire sprinkler system, ref # 202104269311Details
remodel of (e) fire sprinkler system, ref # 202104269311 | $5,000 |
| Dec 6, 2021 | Completed final sign-off Jan 2022 | 900 Kearny St | suite 300: existing sprinkler system remodel (tenant improvement) relocate 39 sprinlers, 9 sprinklers existing to remainDetails
suite 300: existing sprinkler system remodel (tenant improvement) relocate 39 sprinlers, 9 sprinklers existing to remain | $5,000 |
| Nov 23, 2021 | Completed final sign-off Jan 2023 | 201 Folsom St | as-built fire only: ti to existing unit requiring relocating, adding 2 additional sprinkler heads and pipe changes noted. ref. permit 202111081972.Details
as-built fire only: ti to existing unit requiring relocating, adding 2 additional sprinkler heads and pipe changes noted. ref. permit 202111081972. | |
| Nov 8, 2021 | Completed final sign-off Jan 2023 | 201 Folsom St | tenant improvement to e unit require relocating adding sprinklers. 56 sprinklers totalDetails
tenant improvement to e unit require relocating adding sprinklers. 56 sprinklers total | $8,000 |
| Sep 29, 2021 | Completed final sign-off Sep 2021 | 2286 Union St | as - built design requested by inspector wong. delete (2) sprinklers and relocate (2) sprinklers from originally approved design.Details
as - built design requested by inspector wong. delete (2) sprinklers and relocate (2) sprinklers from originally approved design. | $3,000 |
| Sep 20, 2021 | Completed final sign-off Sep 2021 | 2286 Union St | add (4) sprinklers to (e) sprinkler system for tenant improvements, also relocate (2) sprinklers. ref. pa 202103106264.Details
add (4) sprinklers to (e) sprinkler system for tenant improvements, also relocate (2) sprinklers. ref. pa 202103106264. | $3,000 |
| Feb 28, 2020 | Completed final sign-off Apr 2024 | 417 Montgomery St | fire sprinkler as built. adding 7 sprinkler to original permit. ref 201912109153, ref 201910215105Details
fire sprinkler as built. adding 7 sprinkler to original permit. ref 201912109153, ref 201910215105 | $6,500 |
| Dec 10, 2019 | Completed final sign-off Sep 2023 | 417 Montgomery St | tenant improvement of existing commercial sprinkler system at 1st fl for new fitness center/gym: 127 sprinklers total ref#201910215105Details
tenant improvement of existing commercial sprinkler system at 1st fl for new fitness center/gym: 127 sprinklers total ref#201910215105 | $6,500 |
| Mar 2, 2018 | Completed final sign-off May 2018 | 164 23rd Av | as builts for 201708165037 additional 7 heads added to system in corridor on grnd flr. calcs included.Details
as builts for 201708165037 additional 7 heads added to system in corridor on grnd flr. calcs included. | $9,500 |
| Aug 16, 2017 | Completed final sign-off May 2018 | 164 23rd Av | 1st floor garage is being renovated to add residential unit under pa #201612084415 adding sprinklers in the new unit & garage with with dedicated supply.Details
1st floor garage is being renovated to add residential unit under pa #201612084415 adding sprinklers in the new unit & garage with with dedicated supply. | $5,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 3134 Broderick St | as built fire sprinkelr plans showing 1-1/2" service instead of 3/4". original pa #201703161646.Details
as built fire sprinkelr plans showing 1-1/2" service instead of 3/4". original pa #201703161646. | |
| Jul 21, 2017 | Completed final sign-off Dec 2018 | 251 Lincoln Wy | adding fire sprinkler system to (e) residential building due to basement remodel ref pa 2016-0513-7443Details
adding fire sprinkler system to (e) residential building due to basement remodel ref pa 2016-0513-7443 | $5,500 |
| Mar 16, 2017 | Completed final sign-off Apr 2018 | 3134 Broderick St | adding new fire sprinkler system for new unit and egress as requested by fire inspector. ref pa 2015-0319-1293Details
adding new fire sprinkler system for new unit and egress as requested by fire inspector. ref pa 2015-0319-1293 | $2,500 |