Block 1747, lot 001
209 Lincoln Way
- City’s use
- Multi-Family Residential
- Built
- 1916
- Stories
- 2
- Units
- 8
- Rooms
- 8 bedrooms, 8 bathrooms
- Building
- 6,424 sq ft
- Lot
- 4,273 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 209 Lincoln Wy | revision to pa# 202006309365 & 202306291189. 1/f: unit a & b, add laundry, 2/f: unit 1 & 3, add laudnry, 3/f: unit 5 & 7 add laundry.Details
revision to pa# 202006309365 & 202306291189. 1/f: unit a & b, add laundry, 2/f: unit 1 & 3, add laudnry, 3/f: unit 5 & 7 add laundry. | $5,000 | |
| Apr 11, 2025 | Completed final sign-off May 2025 | 209 Lincoln Wy | All Type Remodeling Inc | reroofing hot worksDetails
reroofing hot works | $16,300 |
| Apr 11, 2025 | Completed final sign-off May 2025 | 209 Lincoln Wy | All Type Remodeling Inc | remove two pieces of plywood around the drain end install two membrane plywood.Details
remove two pieces of plywood around the drain end install two membrane plywood. | $750 |
| Nov 15, 2024 | In progress issued Nov 2024 | 209 Lincoln Wy | Kmk Construction And Design | recomencement and completion of work approved under pa# 2019-1114-7335 & 2020-0630-9365.Details
recomencement and completion of work approved under pa# 2019-1114-7335 & 2020-0630-9365. | $301,000 |
| Mar 25, 2024 | In progress issued Mar 2024 | 209 Lincoln Wy | Coastwest Fire Protection | overhead design and installaion of the automataic fire system total of 162 sprinklers, underground design included for calculations, but intall and permit no in this scopeDetails
overhead design and installaion of the automataic fire system total of 162 sprinklers, underground design included for calculations, but intall and permit no in this scope | $20,000 |
| Jun 29, 2023 | Never finaled issued Aug 2023, no final | 209 Lincoln Wy | Kmk Construction And Design | revision to pa 2020-0921-4653 reconfigure layouts. unit a - relocate water heater; unit b - remove 1 bedroom; unit c - turn bedroom into office; unit d - remove 1 bedroom; add laundry for 2 unitsDetails
revision to pa 2020-0921-4653 reconfigure layouts. unit a - relocate water heater; unit b - remove 1 bedroom; unit c - turn bedroom into office; unit d - remove 1 bedroom; add laundry for 2 units | |
| Oct 28, 2022 | Completed final sign-off Mar 2023 | 209 Lincoln Wy | Kmk Construction And Design | revision to bpa 202009214653. partial slab replacement 1st floor. no excavation. structural only.Details
revision to bpa 202009214653. partial slab replacement 1st floor. no excavation. structural only. | $5,000 |
| Jun 24, 2022 | Never finaled issued Jun 2022, no final | 209 Lincoln Wy | Kmk Construction And Design | to comply with complaint #202292339, 202293217, 202292162, 202291333. replace all windows on 2/f and 3/f (total 68) with wood window with integrated ogee lugs, all visible from street.Details
to comply with complaint #202292339, 202293217, 202292162, 202291333. replace all windows on 2/f and 3/f (total 68) with wood window with integrated ogee lugs, all visible from street. | $10,000 |
| Oct 14, 2021 | Never finaled issued Oct 2021, no final | 209 Lincoln Wy | Kmk Construction And Design | not to remove any architectual elements. add new smooth stucco on top of extg texured stucco.Details
not to remove any architectual elements. add new smooth stucco on top of extg texured stucco. | $6,000 |
| Jul 20, 2021 | Completed final sign-off Dec 2021 | 209 Lincoln Wy | Kmk Construction And Design | comply with nov 202174373 - garage level, remove lath and plaster and non-bearing partition walls.Details
comply with nov 202174373 - garage level, remove lath and plaster and non-bearing partition walls. | $5,000 |
| Sep 21, 2020 | Never finaled issued Mar 2022, no final | 209 Lincoln Wy | Kmk Construction And Design | 1st floor: add 4 adu per ordinance 95-17.unit a: add 1 bedroom, kitchen, living and 1 full bathunit b: add 2 bedrooms, kitchen, living and 1 full bathunit c: add 2 bedrooms, kitchen, living and 1 full bath unit d: add 2 bedrooms, kitchen, living and 1 full bathDetails
1st floor: add 4 adu per ordinance 95-17.unit a: add 1 bedroom, kitchen, living and 1 full bathunit b: add 2 bedrooms, kitchen, living and 1 full bathunit c: add 2 bedrooms, kitchen, living and 1 full bath unit d: add 2 bedrooms, kitchen, living and 1 full bath | $200,000 |
| Jun 30, 2020 | Never finaled issued Aug 2020, no final | 209 Lincoln Wy | Kmk Construction And Design | revision to pa 2019-1114-7335. interior modification per plan - to add (n) tankles water system, minor relocation of walls w/in units. add roof deck.Details
revision to pa 2019-1114-7335. interior modification per plan - to add (n) tankles water system, minor relocation of walls w/in units. add roof deck. | $15,000 |
| Nov 14, 2019 | Never finaled issued Dec 2019, no final | 209 Lincoln Wy | Kmk Construction And Design | interior alteration: unit 1 & 5 remodel bath. relocated kitchen, add 1 den. unit 2 & 6 remodel bath relocated kitchen, dining and bedroom, add 1 den. unit#3 & 7 remodel kitchen and bath. add 1 bedroom. unit 4 & 8 remodel bath, relocate kitchen, dining & bedroom. add 1 den.Details
interior alteration: unit 1 & 5 remodel bath. relocated kitchen, add 1 den. unit 2 & 6 remodel bath relocated kitchen, dining and bedroom, add 1 den. unit#3 & 7 remodel kitchen and bath. add 1 bedroom. unit 4 & 8 remodel bath, relocate kitchen, dining & bedroom. add 1 den. | $600,000 |
| Mar 13, 2018 | Completed final sign-off Mar 2018 | 209 Lincoln Wy | to comply with nov# 201842891. repair rear stairs, less than 50%. item #2.Details
to comply with nov# 201842891. repair rear stairs, less than 50%. item #2. | $2,500 | |
| Dec 31, 2015 | Completed final sign-off Jul 2016 | 209 Lincoln Wy | Hing Wah Construction Inc | soft story retrofit per sfbc chapter 34b (2012 iebc appendix a-4)Details
soft story retrofit per sfbc chapter 34b (2012 iebc appendix a-4) | $30,000 |
| Apr 1, 2003 | Completed final sign-off Apr 2003 | 209 Lincoln Wy | S D G/ Sales Distr. Grp | repair work less than 50% in kind of stair/deck structure, at back of buildingDetails
repair work less than 50% in kind of stair/deck structure, at back of building | $600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kmk Construction And Design (9), All Type Remodeling Inc (2), Coastwest Fire Protection, Hing Wah Construction Inc, S D G/ Sales Distr. Grp
- Engineers
- Lawrence Liao (7)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.