H C I Systems Inc
- Based in
- Ontario
- On San Francisco permits
- Aug 2012 to Jun 2026
- Last 24 months
- 20 permits filed
278 permits since 2000: 209 completed, 11 in progress, 45 never finaled, 13 expired or cancelled.
Of the 45 never-finaled permits, 1 is 3 to 5 years old, 22 are 5 to 10 years old, 22 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 65 days from filing to permit and 747 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2020 | Completed final sign-off Dec 2022 | 1550 Evans Av | design a two way communication system @ each elevator lobby that is above the ground level so tgat a person unable to use stairs for exiting can call for assistance.Details
design a two way communication system @ each elevator lobby that is above the ground level so tgat a person unable to use stairs for exiting can call for assistance. | $13,839 |